Search Results

Search found 21356 results on 855 pages for 'check digit'.

Page 766/855 | < Previous Page | 762 763 764 765 766 767 768 769 770 771 772 773  | Next Page >

  • How to troubleshoot port forwarding on Windows 7 (64 Bit) with ICS enabled?

    - by LearnCocos2D
    I want to forward some ports (1666 for perforce, 8081 for Hudson) on my Internet Gateway machine. This machine is running Windows 7 (64 Bit, legal, user-account) and connected to the Internet via cable modem (it's not a router). The Windows machine is sharing its Internet Connection via ICS and that works fine on all connected computers. I can access the services via the gateway's public IP (95.x.x.x) on the given ports if they are running on the gateway machine itself. I've added the ports and destination IP address (192.168.0.18) in the Internet network adapter's Advanced Settings dialog (Sharing tab). That's the same dialog where you have a list of preconfigured services like HTTP, FTP and other incoming services. When I do that I can't connect to the services anymore. For some reason port forwarding isn't working. I have uninstalled Bitdefender because I wanted to check if the Firewall interferes. I've also disabled the Windows Firewall and Defender to no avail. I tried a freeware tool that helps to setup port forwarding but that didn't work either. The target machine is a Mac OS X computer whose Firewall is disabled. The IP is static. I can successfully connect to the services using the local IP address (192.168.0.18) from two different machines, including the gateway computer. So internally and externally it seems to me that the ports are open and not blocked, and the issue is with port forwarding itself. From what I understand it should be enough to add an entry to the Advanced Settings dialog to enable port forwarding when there are no firewalls interfering. How can I troubleshoot why port forwarding isn't working for me? What steps should I follow to alleviate the issue? PS: I gladly accept command line solutions. Other things I've tried: adding an Inbound Rule to Windows Firewall for the 1666, 8081 ports trying with Windows Firewall enabled and disabled disabling/enabling the network adapter double-checked that the IP addresses are correct mapping a different incoming port to the service's actual port followed or checked the misc tips in this article What I haven't dared trying yet (let me know if it's worth a shot): disable/enable ICS remove all network adapters (via Control Panel), then re-install and re-configure them

    Read the article

  • How to Create Auto Playlists in Windows Media Player 12

    - by DigitalGeekery
    Are you getting tired of the same old playlists in Windows Media Player? Today we’ll show you how to create dynamic auto playlists based on criteria you choose in WMP 12 in Windows 7. Auto Playlists In Library view, click on Create playlist dropdown arrow and select Create auto playlist. On the New Auto Playlist window type in a name for the playlist in the text box. Now we need to choose our criteria by which to filter your playlist. Select Click here to add criteria. For our example, we will create a playlist of songs that were added to the library in the last week from the Alternative genre. So, we will first select Date Added from the dropdown list. Many criteria will have addition options to configure. In the example below you will see that we have a few options to fine tune.   We will filter all the songs added to the library in the last 7 days. We will select Is After from the first dropdown list. Then select Last 7 Days from the second dropdown list. You can add multiple criteria to further filter your playlist. If you can’t find the criteria you are looking for, select “More” at the bottom of the dropdown list.   This will pull up a filter window with all the criteria. Select a filter and then click OK when finished.   From the Genre dropdown, we will select Alternative. If you’d like to add Pictures, Videos, or TV Shows to your auto playlists you can do so by selecting them from the dropdown list under And also include. You will then be able to select criteria for your pictures, videos, or TV shows from the dropdown list.   Finally, you can also add restrictions to your music such as the number of items, duration, or total size. We will limit the duration of our playlist to one hour by selecting Limit Total Duration To… Then type in 1 hour…Click OK.   Our library is automatically filtered and a playlist is created based on the criteria we selected. When additional songs are added to the Windows Media Player library, any of new songs that fit the criteria will automatically be added to the New Songs playlist. You can also save a copy of an auto playlist as a regular playlist. Switch to Playlists view by clicking Playlists from either the top menu or the navigation bar. Select the Play tab and then click Clear list to remove any tracks from the list pane.   Right-click on the playlist you want to save, select Add to, and then Play list. The songs from your auto playlist will appear as an Unsaved list on the list pane. Click Save list. Type in a name for your playlist. Your auto playlist will continue to change as you add or remove items from your Media Player library that meet the criteria you established. The new saved playlist we just created will stay as it is currently. Editing a Auto playlist is easy. Right-click on the playlist and select Edit. Now you are ready to enjoy your playlist. Conclusion Auto playlists are great way to keep your playlists fresh in Windows Media Player 12. Users can get creative and experiment with the wide variety of criteria to customize their listening experience. If you are new to playlists in Windows Media Player, you may want to check our our previous post on how to create custom playlists in Windows Media Player 12. Are you looking to get better sound from WMP 12? Take a look at how to improve playback using enhancements in Windows Media Player 12. Similar Articles Productive Geek Tips Create Custom Playlists in Windows Media Player 12Fixing When Windows Media Player Library Won’t Let You Add FilesInstall and Use the VLC Media Player on Ubuntu LinuxMake Windows Media Player Automatically Open in Mini Player ModeMake VLC Player Look like Windows Media Player 10 TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips VMware Workstation 7 Acronis Online Backup DVDFab 6 Revo Uninstaller Pro Error Goblin Explains Windows Error Codes Twelve must-have Google Chrome plugins Cool Looking Skins for Windows Media Player 12 Move the Mouse Pointer With Your Face Movement Using eViacam Boot Windows Faster With Boot Performance Diagnostics Create Ringtones For Your Android Phone With RingDroid

    Read the article

  • Adding A Custom Dropdown in RCDC for Forefront Identity Manager 2010

    - by Daniel Lackey
    My latest exploration has been FIM 2010 for Identity Management. The following is a post of how to add a custom dropdown for the FIM Portal. I have decided to document this as I cannot find documentation on how to do this anywhere else. I hope that it finds useful to others.   For starters, this was to me not an easy task to figure out. I really would like to know why it is so cumbersome to do something that seems like a lot of people would need to do, but that’s for another day J   The dropdown I wanted to add was for ‘Account Status’ which would display if the account is ‘Enabled’ or ‘Disabled’ in the data source Active Directory. This option would also allow helpdesk users or admins to administer the userAccountControl attribute in AD from the FIM Portal interface.   The first thing I had to do was create the attribute itself. This is done by going to Administration à Schema Management from the FIM 2010 portal. Once here, you click on All Attributes. What is listed here are all attributes and their associated Resource Types in FIM. To create the ‘AccountStatus’ attribute, click on New. As shown below, enter ‘AccountStatus’ with no spaces for the System Name and ‘Account Status’ for the Display Name. The Data Type is going to be ‘Indexed String’. Click Next.           Leave everything on the Localization tab default and click Next.   On the Validation tab as shown below, we will enter the regex expression ^(Enabled|Disabled)?$ with our two desired string values ‘Enabled’ and ‘Disabled’. Click on Finish and then and Submit to complete adding the attribute.       The next step involves associating the attribute with a resource type. This is called ‘Binding’ the attribute. From the Schema Management page, click on All Bindings. From the page that comes up, click on New. As shown below, enter ‘User’ for the Resource Type and ‘Account Status’ for the Attribute Type. This is essentially binding the Account Status attribute to the ‘User’ Resource Type. Click Next.    On the ‘Attribute Override’ tab, type in ‘Account Status’ for the Display Name field. Click Next.   On the ‘Localization’ tab, click Next.   On the ‘Validation’ tab, enter the regex expression ^(Enabled|Disabled)?$ we entered previously for the attribute. Click Finish and then Submit to complete.   Now that the Attribute and the Binding are complete, you have to give users permission to see the attribute on the User Edit page. Go to Administration à Management Policy Rules. Look for the rule named Administration: Administrators can read and update Users and click on it. Once it opens, click on the ‘Target Resources’ tab and look at the section named Resource Attributes. Type in at the end the ‘Account Status’ attribute and check it with the validator. Once done click on OK to save the changes.         Lastly, we need to add the actual dropdown control to the RCDC (Resource Control Display Configuration) for User Editing. Go to Administration à Resource Control Display Configuration. From here navigate until you find the RCDC named Configuration for User Editing RCDC and click on it. The following is what you will see:       First step is to export the Configuration Data file. Click on the Export configuration link and save the file to your desktop of other folder.   Find the file you just exported and open the file in your XML editor of choice. I use notepad but anything will work. Since we are adding a dropdown control, first find another control in the existing file that is already a dropdown in FIM. I used EmployeeType as my example. Copy the control from the beginning tag named <my:Control… to the ending tag </my:Control>. Now take what you copied and paste it in whatever location you desire within the form between two other controls. I chose to place the ‘Account Status’ field after the ‘Account Name’ field. After you paste the control you will need to modify so it looks like this:       Notice where you specify what attribute you are dealing with where it has AccountStatus in the XML. Once you are complete with modifying this, save the file and make sure it is a .xml file.   Now go back to the Configuration for User Editing screen and look at the section named ‘Configuration Data’. Click the ‘Browse’ button and find the XML file you just modified and choose it. Click OK on the bottom of the window and you are done!   Now when you click on a user’s name in the FIM Portal, you should see the newly added dropdown box as below:       Later I will post more about this drop down, specifically on how to automate actually ‘Disabling’ the account in the data source through the FIM Workflows and MAs.   <my:Control my:Name="AccountStatus" my:TypeName="UocDropDownList" my:Caption="{Binding Source=schema, Path=AccountStatus.DisplayName}" my:Description="{Binding Source=schema, Path=AccountStatus.Description}" my:RightsLevel="{Binding Source=rights, Path=AccountStatus}"> <my:Properties> <my:Property my:Name="ValuePath" my:Value="Value"/> <my:Property my:Name="CaptionPath" my:Value="Caption"/> <my:Property my:Name="HintPath" my:Value="Hint"/> <my:Property my:Name="ItemSource" my:Value="{Binding Source=schema, Path=AccountStatus.LocalizedAllowedValues}"/> <my:Property my:Name="SelectedValue" my:Value="{Binding Source=object, Path=AccountStatus, Mode=TwoWay}"/> </my:Properties> </my:Control>

    Read the article

  • Blending the Sketchflow Action

    - by GeekAgilistMercenary
    Started a new Sketchflow Prototype in Expression Blend recently and documented each of the steps.  This blog entry covers some of those steps, which are the basic elements of any prototype.  I will have more information regarding design, prototype creation, and the process of the initial phases for development in the future.  For now, I hope you enjoy this short walk through.  Also, be sure to check out my last quick entry on Sketchflow. I started off with a Sketchflow Project, just like I did in my previous entry (more specifics in that entry about how to manipulate and build out the Sketchflow Map). Once I created the project I setup the following Sketchflow Map. The CoreNavigation is a ComponentScreen setup solely for the page navigation at the top of the screen.  The XAML markup in case you want to create a Component Screen with the same design is included below. <UserControl xmlns="http://schemas.microsoft.com/winfx/2006/xaml/presentation" xmlns:x="http://schemas.microsoft.com/winfx/2006/xaml" xmlns:d="http://schemas.microsoft.com/expression/blend/2008" xmlns:mc="http://schemas.openxmlformats.org/markup-compatibility/2006" mc:Ignorable="d" xmlns:i="clr-namespace:System.Windows.Interactivity;assembly=System.Windows.Interactivity" xmlns:pb="clr-namespace:Microsoft.Expression.Prototyping.Behavior;assembly=Microsoft.Expression.Prototyping.Interactivity" x:Class="RapidPrototypeSketchScreens.CoreNavigation" d:DesignWidth="624" d:DesignHeight="49" Height="49" Width="624">   <Grid x:Name="LayoutRoot"> <TextBlock HorizontalAlignment="Stretch" Margin="307,3,0,0" Style="{StaticResource TitleCenter-Sketch}" Text="Aütøchart Scorecards" TextWrapping="Wrap"> <i:Interaction.Triggers> <i:EventTrigger EventName="MouseLeftButtonDown"> <pb:NavigateToScreenAction TargetScreen="RapidPrototypeSketchScreens.Screen_1"/> </i:EventTrigger> </i:Interaction.Triggers> </TextBlock> <Button HorizontalAlignment="Left" Margin="164,8,0,11" Style="{StaticResource Button-Sketch}" Width="144" Content="Scorecard"> <i:Interaction.Triggers> <i:EventTrigger EventName="Click"> <pb:NavigateToScreenAction TargetScreen="RapidPrototypeSketchScreens.Screen_1_2"/> </i:EventTrigger> </i:Interaction.Triggers> </Button> <Button HorizontalAlignment="Left" Margin="8,8,0,11" Style="{StaticResource Button-Sketch}" Width="152" Content="Standard Reports"> <i:Interaction.Triggers> <i:EventTrigger EventName="Click"> <pb:NavigateToScreenAction TargetScreen="RapidPrototypeSketchScreens.Screen_1_1"/> </i:EventTrigger> </i:Interaction.Triggers> </Button> </Grid> </UserControl> Now that the CoreNavigation Component Screen is done I built out each of the others.  In each of those screens I included the CoreNavigation Screen (all those little green lines in the image) as the top navigation.  In order to do that, as I created each of the pages I would hover over the CoreNavigation Object in the Sketchflow Map.  When the utilities drawer (the small menu that pops down under a node when you hover over it) shows click on the third little icon and drag it onto the page node you want a navigation screen on. Once I created all the screens I setup the navigation by opening up each screen and right clicking on the objects that needed to point to somewhere else in the prototype. Once I was done with the main page, my Home Navigation Page, it looked something like this in the Expression Blend Designer. I fleshed out each of the additional screens.  Once I was done I wanted to try out the deployment package.  The way to deploy a Sketchflow Prototype is to merely click on File –> Package SketchFlow Project and a prompt will appear.  In the prompt enter what you want the package to be called. I like to see the files generated afterwards too, so I checked the box to see that.  When Expression Blend is done generating everything you’ll have a directory like the one shown below, with all the needed files for deployment. Now these files can be copied or moved to any location for viewing.  One can even copy them (such as via FTP) to a server location to share with others.  Once they are deployed and you run the "TestPage.html" the other features of the Sketchflow Package are available. In the image below I have tagged a few sections to show the Sketchflow Player Features.  To the top left is the navigation, which provides a clearly defined area of movement in a list.  To the center right is the actual prototype application.  I have placed lists of things and made edits.  On the left hand side is the highlight feature, which is available in the Feedback section of the lower left.  On the right hand list I underlined the Autochart with an orange marker, and marked out two list items with a red marker. In the lower left hand side in the Feedback section is also an area to type in your feedback.  This can be useful for time based feedback, when you post this somewhere and want people to provide subsequent follow up feedback. Overall lots of great features, that enable some fairly rapid prototyping with customers.  Once one is familiar with the steps and parts of this Sketchflow Prototype Capabilities it is easy to step through an application without even stopping.  It really is that easy.  So get hold of Expression Blend 3 and get ramped up on Sketchflow, it will pay off in the design phases to do so! Original Entry

    Read the article

  • Geek Fun: Virtualized Old School Windows – Windows 95

    - by Matthew Guay
    Last week we enjoyed looking at Windows 3.1 running in VMware Player on Windows 7.  Today, let’s upgrade our 3.1 to 95, and get a look at how most of us remember Windows from the 90’s. In this demo, we’re running the first release of Windows 95 (version 4.00.950) in VMware Player 3.0 running on Windows 7 x64.  For fun, we ran the 95 upgrade on the 3.1 virtual machine we built last week. Windows 95 So let’s get started.  Here’s the first setup screen.  For the record, Windows 95 installed in about 15 minutes or less in VMware in our test. Strangely, Windows 95 offered several installation choices.  They actually let you choose what extra parts of Windows to install if you wished.  Oh, and who wants to run Windows 95 on your “Portable Computer”?  Most smartphones today are more powerful than the “portable computers” of 95. Your productivity may vastly increase if you run Windows 95.  Anyone want to switch? No, I don’t want to restart … I want to use my computer! Welcome to Windows 95!  Hey, did you know you can launch programs from the Start button? Our quick spin around Windows 95 reminded us why Windows got such a bad reputation in the ‘90’s for being unstable.  We didn’t even get our test copy fully booted after installation before we saw our first error screen.  Windows in space … was that the most popular screensaver in Windows 95, or was it just me? Hello Windows 3.1!  The UI was still outdated in some spots.   Ah, yes, Media Player before it got 101 features to compete with iTunes. But, you couldn’t even play CDs in Media Player.  Actually, CD player was one program I used almost daily in Windows 95 back in the day. Want some new programs?  This help file about new programs designed for Windows 95 lists a lot of outdated names in tech.    And, you really may want some programs.  The first edition of Windows 95 didn’t even ship with Internet Explorer.   We’ve still got Minesweeper, though! My Computer had really limited functionality, and by default opened everything in a new window.  Double click on C:, and it opens in a new window.  Ugh. But Explorer is a bit more like more modern versions. Hey, look, Start menu search!  If only it found the files you were looking for… Now I’m feeling old … this shutdown screen brought back so many memories … of shutdowns that wouldn’t shut down! But, you still have to turn off your computer.  I wonder how many old monitors had these words burned into them? So there’s yet another trip down Windows memory lane.  Most of us can remember using Windows 95, so let us know your favorite (or worst) memory of it!  At least we can all be thankful for our modern computers and operating systems today, right?  Similar Articles Productive Geek Tips Geek Fun: Remember the Old-School SkiFree Game?Geek Fun: Virtualized old school Windows 3.11Stupid Geek Tricks: Tile or Cascade Multiple Windows in Windows 7Stupid Geek Tricks: Select Multiple Windows on the TaskbarHow to Delete a System File in Windows 7 or Vista TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips Revo Uninstaller Pro Registry Mechanic 9 for Windows PC Tools Internet Security Suite 2010 PCmover Professional Enable Check Box Selection in Windows 7 OnlineOCR – Free OCR Service Betting on the Blind Side, a Vanity Fair article 30 Minimal Logo Designs that Say More with Less LEGO Digital Designer – Free Create a Personal Website Quickly using Flavors.me

    Read the article

  • Geek Fun: Virtualized Old School Windows – Windows 95

    - by Matthew Guay
    Last week we enjoyed looking at Windows 3.1 running in VMware Player on Windows 7.  Today, let’s upgrade our 3.1 to 95, and get a look at how most of us remember Windows from the 90’s. In this demo, we’re running the first release of Windows 95 (version 4.00.950) in VMware Player 3.0 running on Windows 7 x64.  For fun, we ran the 95 upgrade on the 3.1 virtual machine we built last week. Windows 95 So let’s get started.  Here’s the first setup screen.  For the record, Windows 95 installed in about 15 minutes or less in VMware in our test. Strangely, Windows 95 offered several installation choices.  They actually let you choose what extra parts of Windows to install if you wished.  Oh, and who wants to run Windows 95 on your “Portable Computer”?  Most smartphones today are more powerful than the “portable computers” of 95. Your productivity may vastly increase if you run Windows 95.  Anyone want to switch? No, I don’t want to restart … I want to use my computer! Welcome to Windows 95!  Hey, did you know you can launch programs from the Start button? Our quick spin around Windows 95 reminded us why Windows got such a bad reputation in the ‘90’s for being unstable.  We didn’t even get our test copy fully booted after installation before we saw our first error screen.  Windows in space … was that the most popular screensaver in Windows 95, or was it just me? Hello Windows 3.1!  The UI was still outdated in some spots.   Ah, yes, Media Player before it got 101 features to compete with iTunes. But, you couldn’t even play CDs in Media Player.  Actually, CD player was one program I used almost daily in Windows 95 back in the day. Want some new programs?  This help file about new programs designed for Windows 95 lists a lot of outdated names in tech.    And, you really may want some programs.  The first edition of Windows 95 didn’t even ship with Internet Explorer.   We’ve still got Minesweeper, though! My Computer had really limited functionality, and by default opened everything in a new window.  Double click on C:, and it opens in a new window.  Ugh. But Explorer is a bit more like more modern versions. Hey, look, Start menu search!  If only it found the files you were looking for… Now I’m feeling old … this shutdown screen brought back so many memories … of shutdowns that wouldn’t shut down! But, you still have to turn off your computer.  I wonder how many old monitors had these words burned into them? So there’s yet another trip down Windows memory lane.  Most of us can remember using Windows 95, so let us know your favorite (or worst) memory of it!  At least we can all be thankful for our modern computers and operating systems today, right?  Similar Articles Productive Geek Tips Geek Fun: Remember the Old-School SkiFree Game?Geek Fun: Virtualized old school Windows 3.11Stupid Geek Tricks: Tile or Cascade Multiple Windows in Windows 7Stupid Geek Tricks: Select Multiple Windows on the TaskbarHow to Delete a System File in Windows 7 or Vista TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips Revo Uninstaller Pro Registry Mechanic 9 for Windows PC Tools Internet Security Suite 2010 PCmover Professional Enable Check Box Selection in Windows 7 OnlineOCR – Free OCR Service Betting on the Blind Side, a Vanity Fair article 30 Minimal Logo Designs that Say More with Less LEGO Digital Designer – Free Create a Personal Website Quickly using Flavors.me

    Read the article

  • Agile Development

    - by James Oloo Onyango
    Alot of literature has and is being written about agile developement and its surrounding philosophies. In my quest to find the best way to express the importance of agile methodologies, i have found Robert C. Martin's "A Satire Of Two Companies" to be both the most concise and thorough! Enjoy the read! Rufus Inc Project Kick Off Your name is Bob. The date is January 3, 2001, and your head still aches from the recent millennial revelry. You are sitting in a conference room with several managers and a group of your peers. You are a project team leader. Your boss is there, and he has brought along all of his team leaders. His boss called the meeting. "We have a new project to develop," says your boss's boss. Call him BB. The points in his hair are so long that they scrape the ceiling. Your boss's points are just starting to grow, but he eagerly awaits the day when he can leave Brylcream stains on the acoustic tiles. BB describes the essence of the new market they have identified and the product they want to develop to exploit this market. "We must have this new project up and working by fourth quarter October 1," BB demands. "Nothing is of higher priority, so we are cancelling your current project." The reaction in the room is stunned silence. Months of work are simply going to be thrown away. Slowly, a murmur of objection begins to circulate around the conference table.   His points give off an evil green glow as BB meets the eyes of everyone in the room. One by one, that insidious stare reduces each attendee to quivering lumps of protoplasm. It is clear that he will brook no discussion on this matter. Once silence has been restored, BB says, "We need to begin immediately. How long will it take you to do the analysis?" You raise your hand. Your boss tries to stop you, but his spitwad misses you and you are unaware of his efforts.   "Sir, we can't tell you how long the analysis will take until we have some requirements." "The requirements document won't be ready for 3 or 4 weeks," BB says, his points vibrating with frustration. "So, pretend that you have the requirements in front of you now. How long will you require for analysis?" No one breathes. Everyone looks around to see whether anyone has some idea. "If analysis goes beyond April 1, we have a problem. Can you finish the analysis by then?" Your boss visibly gathers his courage: "We'll find a way, sir!" His points grow 3 mm, and your headache increases by two Tylenol. "Good." BB smiles. "Now, how long will it take to do the design?" "Sir," you say. Your boss visibly pales. He is clearly worried that his 3 mms are at risk. "Without an analysis, it will not be possible to tell you how long design will take." BB's expression shifts beyond austere.   "PRETEND you have the analysis already!" he says, while fixing you with his vacant, beady little eyes. "How long will it take you to do the design?" Two Tylenol are not going to cut it. Your boss, in a desperate attempt to save his new growth, babbles: "Well, sir, with only six months left to complete the project, design had better take no longer than 3 months."   "I'm glad you agree, Smithers!" BB says, beaming. Your boss relaxes. He knows his points are secure. After a while, he starts lightly humming the Brylcream jingle. BB continues, "So, analysis will be complete by April 1, design will be complete by July 1, and that gives you 3 months to implement the project. This meeting is an example of how well our new consensus and empowerment policies are working. Now, get out there and start working. I'll expect to see TQM plans and QIT assignments on my desk by next week. Oh, and don't forget that your crossfunctional team meetings and reports will be needed for next month's quality audit." "Forget the Tylenol," you think to yourself as you return to your cubicle. "I need bourbon."   Visibly excited, your boss comes over to you and says, "Gosh, what a great meeting. I think we're really going to do some world shaking with this project." You nod in agreement, too disgusted to do anything else. "Oh," your boss continues, "I almost forgot." He hands you a 30-page document. "Remember that the SEI is coming to do an evaluation next week. This is the evaluation guide. You need to read through it, memorize it, and then shred it. It tells you how to answer any questions that the SEI auditors ask you. It also tells you what parts of the building you are allowed to take them to and what parts to avoid. We are determined to be a CMM level 3 organization by June!"   You and your peers start working on the analysis of the new project. This is difficult because you have no requirements. But from the 10-minute introduction given by BB on that fateful morning, you have some idea of what the product is supposed to do.   Corporate process demands that you begin by creating a use case document. You and your team begin enumerating use cases and drawing oval and stick diagrams. Philosophical debates break out among the team members. There is disagreement as to whether certain use cases should be connected with <<extends>> or <<includes>> relationships. Competing models are created, but nobody knows how to evaluate them. The debate continues, effectively paralyzing progress.   After a week, somebody finds the iceberg.com Web site, which recommends disposing entirely of <<extends>> and <<includes>> and replacing them with <<precedes>> and <<uses>>. The documents on this Web site, authored by Don Sengroiux, describes a method known as stalwart-analysis, which claims to be a step-by-step method for translating use cases into design diagrams. More competing use case models are created using this new scheme, but again, people can't agree on how to evaluate them. The thrashing continues. More and more, the use case meetings are driven by emotion rather than by reason. If it weren't for the fact that you don't have requirements, you'd be pretty upset by the lack of progress you are making. The requirements document arrives on February 15. And then again on February 20, 25, and every week thereafter. Each new version contradicts the previous one. Clearly, the marketing folks who are writing the requirements, empowered though they might be, are not finding consensus.   At the same time, several new competing use case templates have been proposed by the various team members. Each template presents its own particularly creative way of delaying progress. The debates rage on. On March 1, Prudence Putrigence, the process proctor, succeeds in integrating all the competing use case forms and templates into a single, all-encompassing form. Just the blank form is 15 pages long. She has managed to include every field that appeared on all the competing templates. She also presents a 159- page document describing how to fill out the use case form. All current use cases must be rewritten according to the new standard.   You marvel to yourself that it now requires 15 pages of fill-in-the-blank and essay questions to answer the question: What should the system do when the user presses Return? The corporate process (authored by L. E. Ott, famed author of "Holistic Analysis: A Progressive Dialectic for Software Engineers") insists that you discover all primary use cases, 87 percent of all secondary use cases, and 36.274 percent of all tertiary use cases before you can complete analysis and enter the design phase. You have no idea what a tertiary use case is. So in an attempt to meet this requirement, you try to get your use case document reviewed by the marketing department, which you hope will know what a tertiary use case is.   Unfortunately, the marketing folks are too busy with sales support to talk to you. Indeed, since the project started, you have not been able to get a single meeting with marketing, which has provided a never-ending stream of changing and contradictory requirements documents.   While one team has been spinning endlessly on the use case document, another team has been working out the domain model. Endless variations of UML documents are pouring out of this team. Every week, the model is reworked.   The team members can't decide whether to use <<interfaces>> or <<types>> in the model. A huge disagreement has been raging on the proper syntax and application of OCL. Others on the team just got back from a 5-day class on catabolism, and have been producing incredibly detailed and arcane diagrams that nobody else can fathom.   On March 27, with one week to go before analysis is to be complete, you have produced a sea of documents and diagrams but are no closer to a cogent analysis of the problem than you were on January 3. **** And then, a miracle happens.   **** On Saturday, April 1, you check your e-mail from home. You see a memo from your boss to BB. It states unequivocally that you are done with the analysis! You phone your boss and complain. "How could you have told BB that we were done with the analysis?" "Have you looked at a calendar lately?" he responds. "It's April 1!" The irony of that date does not escape you. "But we have so much more to think about. So much more to analyze! We haven't even decided whether to use <<extends>> or <<precedes>>!" "Where is your evidence that you are not done?" inquires your boss, impatiently. "Whaaa . . . ." But he cuts you off. "Analysis can go on forever; it has to be stopped at some point. And since this is the date it was scheduled to stop, it has been stopped. Now, on Monday, I want you to gather up all existing analysis materials and put them into a public folder. Release that folder to Prudence so that she can log it in the CM system by Monday afternoon. Then get busy and start designing."   As you hang up the phone, you begin to consider the benefits of keeping a bottle of bourbon in your bottom desk drawer. They threw a party to celebrate the on-time completion of the analysis phase. BB gave a colon-stirring speech on empowerment. And your boss, another 3 mm taller, congratulated his team on the incredible show of unity and teamwork. Finally, the CIO takes the stage to tell everyone that the SEI audit went very well and to thank everyone for studying and shredding the evaluation guides that were passed out. Level 3 now seems assured and will be awarded by June. (Scuttlebutt has it that managers at the level of BB and above are to receive significant bonuses once the SEI awards level 3.)   As the weeks flow by, you and your team work on the design of the system. Of course, you find that the analysis that the design is supposedly based on is flawedno, useless; no, worse than useless. But when you tell your boss that you need to go back and work some more on the analysis to shore up its weaker sections, he simply states, "The analysis phase is over. The only allowable activity is design. Now get back to it."   So, you and your team hack the design as best you can, unsure of whether the requirements have been properly analyzed. Of course, it really doesn't matter much, since the requirements document is still thrashing with weekly revisions, and the marketing department still refuses to meet with you.     The design is a nightmare. Your boss recently misread a book named The Finish Line in which the author, Mark DeThomaso, blithely suggested that design documents should be taken down to code-level detail. "If we are going to be working at that level of detail," you ask, "why don't we simply write the code instead?" "Because then you wouldn't be designing, of course. And the only allowable activity in the design phase is design!" "Besides," he continues, "we have just purchased a companywide license for Dandelion! This tool enables 'Round the Horn Engineering!' You are to transfer all design diagrams into this tool. It will automatically generate our code for us! It will also keep the design diagrams in sync with the code!" Your boss hands you a brightly colored shrinkwrapped box containing the Dandelion distribution. You accept it numbly and shuffle off to your cubicle. Twelve hours, eight crashes, one disk reformatting, and eight shots of 151 later, you finally have the tool installed on your server. You consider the week your team will lose while attending Dandelion training. Then you smile and think, "Any week I'm not here is a good week." Design diagram after design diagram is created by your team. Dandelion makes it very difficult to draw these diagrams. There are dozens and dozens of deeply nested dialog boxes with funny text fields and check boxes that must all be filled in correctly. And then there's the problem of moving classes between packages. At first, these diagram are driven from the use cases. But the requirements are changing so often that the use cases rapidly become meaningless. Debates rage about whether VISITOR or DECORATOR design patterns should be used. One developer refuses to use VISITOR in any form, claiming that it's not a properly object-oriented construct. Someone refuses to use multiple inheritance, since it is the spawn of the devil. Review meetings rapidly degenerate into debates about the meaning of object orientation, the definition of analysis versus design, or when to use aggregation versus association. Midway through the design cycle, the marketing folks announce that they have rethought the focus of the system. Their new requirements document is completely restructured. They have eliminated several major feature areas and replaced them with feature areas that they anticipate customer surveys will show to be more appropriate. You tell your boss that these changes mean that you need to reanalyze and redesign much of the system. But he says, "The analysis phase is system. But he says, "The analysis phase is over. The only allowable activity is design. Now get back to it."   You suggest that it might be better to create a simple prototype to show to the marketing folks and even some potential customers. But your boss says, "The analysis phase is over. The only allowable activity is design. Now get back to it." Hack, hack, hack, hack. You try to create some kind of a design document that might reflect the new requirements documents. However, the revolution of the requirements has not caused them to stop thrashing. Indeed, if anything, the wild oscillations of the requirements document have only increased in frequency and amplitude.   You slog your way through them.   On June 15, the Dandelion database gets corrupted. Apparently, the corruption has been progressive. Small errors in the DB accumulated over the months into bigger and bigger errors. Eventually, the CASE tool just stopped working. Of course, the slowly encroaching corruption is present on all the backups. Calls to the Dandelion technical support line go unanswered for several days. Finally, you receive a brief e-mail from Dandelion, informing you that this is a known problem and that the solution is to purchase the new version, which they promise will be ready some time next quarter, and then reenter all the diagrams by hand.   ****   Then, on July 1 another miracle happens! You are done with the design!   Rather than go to your boss and complain, you stock your middle desk drawer with some vodka.   **** They threw a party to celebrate the on-time completion of the design phase and their graduation to CMM level 3. This time, you find BB's speech so stirring that you have to use the restroom before it begins. New banners and plaques are all over your workplace. They show pictures of eagles and mountain climbers, and they talk about teamwork and empowerment. They read better after a few scotches. That reminds you that you need to clear out your file cabinet to make room for the brandy. You and your team begin to code. But you rapidly discover that the design is lacking in some significant areas. Actually, it's lacking any significance at all. You convene a design session in one of the conference rooms to try to work through some of the nastier problems. But your boss catches you at it and disbands the meeting, saying, "The design phase is over. The only allowable activity is coding. Now get back to it."   ****   The code generated by Dandelion is really hideous. It turns out that you and your team were using association and aggregation the wrong way, after all. All the generated code has to be edited to correct these flaws. Editing this code is extremely difficult because it has been instrumented with ugly comment blocks that have special syntax that Dandelion needs in order to keep the diagrams in sync with the code. If you accidentally alter one of these comments, the diagrams will be regenerated incorrectly. It turns out that "Round the Horn Engineering" requires an awful lot of effort. The more you try to keep the code compatible with Dandelion, the more errors Dandelion generates. In the end, you give up and decide to keep the diagrams up to date manually. A second later, you decide that there's no point in keeping the diagrams up to date at all. Besides, who has time?   Your boss hires a consultant to build tools to count the number of lines of code that are being produced. He puts a big thermometer graph on the wall with the number 1,000,000 on the top. Every day, he extends the red line to show how many lines have been added. Three days after the thermometer appears on the wall, your boss stops you in the hall. "That graph isn't growing quickly enough. We need to have a million lines done by October 1." "We aren't even sh-sh-sure that the proshect will require a m-million linezh," you blather. "We have to have a million lines done by October 1," your boss reiterates. His points have grown again, and the Grecian formula he uses on them creates an aura of authority and competence. "Are you sure your comment blocks are big enough?" Then, in a flash of managerial insight, he says, "I have it! I want you to institute a new policy among the engineers. No line of code is to be longer than 20 characters. Any such line must be split into two or more preferably more. All existing code needs to be reworked to this standard. That'll get our line count up!"   You decide not to tell him that this will require two unscheduled work months. You decide not to tell him anything at all. You decide that intravenous injections of pure ethanol are the only solution. You make the appropriate arrangements. Hack, hack, hack, and hack. You and your team madly code away. By August 1, your boss, frowning at the thermometer on the wall, institutes a mandatory 50-hour workweek.   Hack, hack, hack, and hack. By September 1st, the thermometer is at 1.2 million lines and your boss asks you to write a report describing why you exceeded the coding budget by 20 percent. He institutes mandatory Saturdays and demands that the project be brought back down to a million lines. You start a campaign of remerging lines. Hack, hack, hack, and hack. Tempers are flaring; people are quitting; QA is raining trouble reports down on you. Customers are demanding installation and user manuals; salespeople are demanding advance demonstrations for special customers; the requirements document is still thrashing, the marketing folks are complaining that the product isn't anything like they specified, and the liquor store won't accept your credit card anymore. Something has to give.    On September 15, BB calls a meeting. As he enters the room, his points are emitting clouds of steam. When he speaks, the bass overtones of his carefully manicured voice cause the pit of your stomach to roll over. "The QA manager has told me that this project has less than 50 percent of the required features implemented. He has also informed me that the system crashes all the time, yields wrong results, and is hideously slow. He has also complained that he cannot keep up with the continuous train of daily releases, each more buggy than the last!" He stops for a few seconds, visibly trying to compose himself. "The QA manager estimates that, at this rate of development, we won't be able to ship the product until December!" Actually, you think it's more like March, but you don't say anything. "December!" BB roars with such derision that people duck their heads as though he were pointing an assault rifle at them. "December is absolutely out of the question. Team leaders, I want new estimates on my desk in the morning. I am hereby mandating 65-hour work weeks until this project is complete. And it better be complete by November 1."   As he leaves the conference room, he is heard to mutter: "Empowermentbah!" * * * Your boss is bald; his points are mounted on BB's wall. The fluorescent lights reflecting off his pate momentarily dazzle you. "Do you have anything to drink?" he asks. Having just finished your last bottle of Boone's Farm, you pull a bottle of Thunderbird from your bookshelf and pour it into his coffee mug. "What's it going to take to get this project done? " he asks. "We need to freeze the requirements, analyze them, design them, and then implement them," you say callously. "By November 1?" your boss exclaims incredulously. "No way! Just get back to coding the damned thing." He storms out, scratching his vacant head.   A few days later, you find that your boss has been transferred to the corporate research division. Turnover has skyrocketed. Customers, informed at the last minute that their orders cannot be fulfilled on time, have begun to cancel their orders. Marketing is re-evaluating whether this product aligns with the overall goals of the company. Memos fly, heads roll, policies change, and things are, overall, pretty grim. Finally, by March, after far too many sixty-five hour weeks, a very shaky version of the software is ready. In the field, bug-discovery rates are high, and the technical support staff are at their wits' end, trying to cope with the complaints and demands of the irate customers. Nobody is happy.   In April, BB decides to buy his way out of the problem by licensing a product produced by Rupert Industries and redistributing it. The customers are mollified, the marketing folks are smug, and you are laid off.     Rupert Industries: Project Alpha   Your name is Robert. The date is January 3, 2001. The quiet hours spent with your family this holiday have left you refreshed and ready for work. You are sitting in a conference room with your team of professionals. The manager of the division called the meeting. "We have some ideas for a new project," says the division manager. Call him Russ. He is a high-strung British chap with more energy than a fusion reactor. He is ambitious and driven but understands the value of a team. Russ describes the essence of the new market opportunity the company has identified and introduces you to Jane, the marketing manager, who is responsible for defining the products that will address it. Addressing you, Jane says, "We'd like to start defining our first product offering as soon as possible. When can you and your team meet with me?" You reply, "We'll be done with the current iteration of our project this Friday. We can spare a few hours for you between now and then. After that, we'll take a few people from the team and dedicate them to you. We'll begin hiring their replacements and the new people for your team immediately." "Great," says Russ, "but I want you to understand that it is critical that we have something to exhibit at the trade show coming up this July. If we can't be there with something significant, we'll lose the opportunity."   "I understand," you reply. "I don't yet know what it is that you have in mind, but I'm sure we can have something by July. I just can't tell you what that something will be right now. In any case, you and Jane are going to have complete control over what we developers do, so you can rest assured that by July, you'll have the most important things that can be accomplished in that time ready to exhibit."   Russ nods in satisfaction. He knows how this works. Your team has always kept him advised and allowed him to steer their development. He has the utmost confidence that your team will work on the most important things first and will produce a high-quality product.   * * *   "So, Robert," says Jane at their first meeting, "How does your team feel about being split up?" "We'll miss working with each other," you answer, "but some of us were getting pretty tired of that last project and are looking forward to a change. So, what are you people cooking up?" Jane beams. "You know how much trouble our customers currently have . . ." And she spends a half hour or so describing the problem and possible solution. "OK, wait a second" you respond. "I need to be clear about this." And so you and Jane talk about how this system might work. Some of her ideas aren't fully formed. You suggest possible solutions. She likes some of them. You continue discussing.   During the discussion, as each new topic is addressed, Jane writes user story cards. Each card represents something that the new system has to do. The cards accumulate on the table and are spread out in front of you. Both you and Jane point at them, pick them up, and make notes on them as you discuss the stories. The cards are powerful mnemonic devices that you can use to represent complex ideas that are barely formed.   At the end of the meeting, you say, "OK, I've got a general idea of what you want. I'm going to talk to the team about it. I imagine they'll want to run some experiments with various database structures and presentation formats. Next time we meet, it'll be as a group, and we'll start identifying the most important features of the system."   A week later, your nascent team meets with Jane. They spread the existing user story cards out on the table and begin to get into some of the details of the system. The meeting is very dynamic. Jane presents the stories in the order of their importance. There is much discussion about each one. The developers are concerned about keeping the stories small enough to estimate and test. So they continually ask Jane to split one story into several smaller stories. Jane is concerned that each story have a clear business value and priority, so as she splits them, she makes sure that this stays true.   The stories accumulate on the table. Jane writes them, but the developers make notes on them as needed. Nobody tries to capture everything that is said; the cards are not meant to capture everything but are simply reminders of the conversation.   As the developers become more comfortable with the stories, they begin writing estimates on them. These estimates are crude and budgetary, but they give Jane an idea of what the story will cost.   At the end of the meeting, it is clear that many more stories could be discussed. It is also clear that the most important stories have been addressed and that they represent several months worth of work. Jane closes the meeting by taking the cards with her and promising to have a proposal for the first release in the morning.   * * *   The next morning, you reconvene the meeting. Jane chooses five cards and places them on the table. "According to your estimates, these cards represent about one perfect team-week's worth of work. The last iteration of the previous project managed to get one perfect team-week done in 3 real weeks. If we can get these five stories done in 3 weeks, we'll be able to demonstrate them to Russ. That will make him feel very comfortable about our progress." Jane is pushing it. The sheepish look on her face lets you know that she knows it too. You reply, "Jane, this is a new team, working on a new project. It's a bit presumptuous to expect that our velocity will be the same as the previous team's. However, I met with the team yesterday afternoon, and we all agreed that our initial velocity should, in fact, be set to one perfectweek for every 3 real-weeks. So you've lucked out on this one." "Just remember," you continue, "that the story estimates and the story velocity are very tentative at this point. We'll learn more when we plan the iteration and even more when we implement it."   Jane looks over her glasses at you as if to say "Who's the boss around here, anyway?" and then smiles and says, "Yeah, don't worry. I know the drill by now."Jane then puts 15 more cards on the table. She says, "If we can get all these cards done by the end of March, we can turn the system over to our beta test customers. And we'll get good feedback from them."   You reply, "OK, so we've got our first iteration defined, and we have the stories for the next three iterations after that. These four iterations will make our first release."   "So," says Jane, can you really do these five stories in the next 3 weeks?" "I don't know for sure, Jane," you reply. "Let's break them down into tasks and see what we get."   So Jane, you, and your team spend the next several hours taking each of the five stories that Jane chose for the first iteration and breaking them down into small tasks. The developers quickly realize that some of the tasks can be shared between stories and that other tasks have commonalities that can probably be taken advantage of. It is clear that potential designs are popping into the developers' heads. From time to time, they form little discussion knots and scribble UML diagrams on some cards.   Soon, the whiteboard is filled with the tasks that, once completed, will implement the five stories for this iteration. You start the sign-up process by saying, "OK, let's sign up for these tasks." "I'll take the initial database generation." Says Pete. "That's what I did on the last project, and this doesn't look very different. I estimate it at two of my perfect workdays." "OK, well, then, I'll take the login screen," says Joe. "Aw, darn," says Elaine, the junior member of the team, "I've never done a GUI, and kinda wanted to try that one."   "Ah, the impatience of youth," Joe says sagely, with a wink in your direction. "You can assist me with it, young Jedi." To Jane: "I think it'll take me about three of my perfect workdays."   One by one, the developers sign up for tasks and estimate them in terms of their own perfect workdays. Both you and Jane know that it is best to let the developers volunteer for tasks than to assign the tasks to them. You also know full well that you daren't challenge any of the developers' estimates. You know these people, and you trust them. You know that they are going to do the very best they can.   The developers know that they can't sign up for more perfect workdays than they finished in the last iteration they worked on. Once each developer has filled his or her schedule for the iteration, they stop signing up for tasks.   Eventually, all the developers have stopped signing up for tasks. But, of course, tasks are still left on the board.   "I was worried that that might happen," you say, "OK, there's only one thing to do, Jane. We've got too much to do in this iteration. What stories or tasks can we remove?" Jane sighs. She knows that this is the only option. Working overtime at the beginning of a project is insane, and projects where she's tried it have not fared well.   So Jane starts to remove the least-important functionality. "Well, we really don't need the login screen just yet. We can simply start the system in the logged-in state." "Rats!" cries Elaine. "I really wanted to do that." "Patience, grasshopper." says Joe. "Those who wait for the bees to leave the hive will not have lips too swollen to relish the honey." Elaine looks confused. Everyone looks confused. "So . . .," Jane continues, "I think we can also do away with . . ." And so, bit by bit, the list of tasks shrinks. Developers who lose a task sign up for one of the remaining ones.   The negotiation is not painless. Several times, Jane exhibits obvious frustration and impatience. Once, when tensions are especially high, Elaine volunteers, "I'll work extra hard to make up some of the missing time." You are about to correct her when, fortunately, Joe looks her in the eye and says, "When once you proceed down the dark path, forever will it dominate your destiny."   In the end, an iteration acceptable to Jane is reached. It's not what Jane wanted. Indeed, it is significantly less. But it's something the team feels that can be achieved in the next 3 weeks.   And, after all, it still addresses the most important things that Jane wanted in the iteration. "So, Jane," you say when things had quieted down a bit, "when can we expect acceptance tests from you?" Jane sighs. This is the other side of the coin. For every story the development team implements,   Jane must supply a suite of acceptance tests that prove that it works. And the team needs these long before the end of the iteration, since they will certainly point out differences in the way Jane and the developers imagine the system's behaviour.   "I'll get you some example test scripts today," Jane promises. "I'll add to them every day after that. You'll have the entire suite by the middle of the iteration."   * * *   The iteration begins on Monday morning with a flurry of Class, Responsibilities, Collaborators sessions. By midmorning, all the developers have assembled into pairs and are rapidly coding away. "And now, my young apprentice," Joe says to Elaine, "you shall learn the mysteries of test-first design!"   "Wow, that sounds pretty rad," Elaine replies. "How do you do it?" Joe beams. It's clear that he has been anticipating this moment. "OK, what does the code do right now?" "Huh?" replied Elaine, "It doesn't do anything at all; there is no code."   "So, consider our task; can you think of something the code should do?" "Sure," Elaine said with youthful assurance, "First, it should connect to the database." "And thereupon, what must needs be required to connecteth the database?" "You sure talk weird," laughed Elaine. "I think we'd have to get the database object from some registry and call the Connect() method. "Ah, astute young wizard. Thou perceives correctly that we requireth an object within which we can cacheth the database object." "Is 'cacheth' really a word?" "It is when I say it! So, what test can we write that we know the database registry should pass?" Elaine sighs. She knows she'll just have to play along. "We should be able to create a database object and pass it to the registry in a Store() method. And then we should be able to pull it out of the registry with a Get() method and make sure it's the same object." "Oh, well said, my prepubescent sprite!" "Hay!" "So, now, let's write a test function that proves your case." "But shouldn't we write the database object and registry object first?" "Ah, you've much to learn, my young impatient one. Just write the test first." "But it won't even compile!" "Are you sure? What if it did?" "Uh . . ." "Just write the test, Elaine. Trust me." And so Joe, Elaine, and all the other developers began to code their tasks, one test case at a time. The room in which they worked was abuzz with the conversations between the pairs. The murmur was punctuated by an occasional high five when a pair managed to finish a task or a difficult test case.   As development proceeded, the developers changed partners once or twice a day. Each developer got to see what all the others were doing, and so knowledge of the code spread generally throughout the team.   Whenever a pair finished something significant whether a whole task or simply an important part of a task they integrated what they had with the rest of the system. Thus, the code base grew daily, and integration difficulties were minimized.   The developers communicated with Jane on a daily basis. They'd go to her whenever they had a question about the functionality of the system or the interpretation of an acceptance test case.   Jane, good as her word, supplied the team with a steady stream of acceptance test scripts. The team read these carefully and thereby gained a much better understanding of what Jane expected the system to do. By the beginning of the second week, there was enough functionality to demonstrate to Jane. She watched eagerly as the demonstration passed test case after test case. "This is really cool," Jane said as the demonstration finally ended. "But this doesn't seem like one-third of the tasks. Is your velocity slower than anticipated?"   You grimace. You'd been waiting for a good time to mention this to Jane but now she was forcing the issue. "Yes, unfortunately, we are going more slowly than we had expected. The new application server we are using is turning out to be a pain to configure. Also, it takes forever to reboot, and we have to reboot it whenever we make even the slightest change to its configuration."   Jane eyes you with suspicion. The stress of last Monday's negotiations had still not entirely dissipated. She says, "And what does this mean to our schedule? We can't slip it again, we just can't. Russ will have a fit! He'll haul us all into the woodshed and ream us some new ones."   You look Jane right in the eyes. There's no pleasant way to give someone news like this. So you just blurt out, "Look, if things keep going like they're going, we're not going to be done with everything by next Friday. Now it's possible that we'll figure out a way to go faster. But, frankly, I wouldn't depend on that. You should start thinking about one or two tasks that could be removed from the iteration without ruining the demonstration for Russ. Come hell or high water, we are going to give that demonstration on Friday, and I don't think you want us to choose which tasks to omit."   "Aw forchrisakes!" Jane barely manages to stifle yelling that last word as she stalks away, shaking her head. Not for the first time, you say to yourself, "Nobody ever promised me project management would be easy." You are pretty sure it won't be the last time, either.   Actually, things went a bit better than you had hoped. The team did, in fact, have to drop one task from the iteration, but Jane had chosen wisely, and the demonstration for Russ went without a hitch. Russ was not impressed with the progress, but neither was he dismayed. He simply said, "This is pretty good. But remember, we have to be able to demonstrate this system at the trade show in July, and at this rate, it doesn't look like you'll have all that much to show." Jane, whose attitude had improved dramatically with the completion of the iteration, responded to Russ by saying, "Russ, this team is working hard, and well. When July comes around, I am confident that we'll have something significant to demonstrate. It won't be everything, and some of it may be smoke and mirrors, but we'll have something."   Painful though the last iteration was, it had calibrated your velocity numbers. The next iteration went much better. Not because your team got more done than in the last iteration but simply because the team didn't have to remove any tasks or stories in the middle of the iteration.   By the start of the fourth iteration, a natural rhythm has been established. Jane, you, and the team know exactly what to expect from one another. The team is running hard, but the pace is sustainable. You are confident that the team can keep up this pace for a year or more.   The number of surprises in the schedule diminishes to near zero; however, the number of surprises in the requirements does not. Jane and Russ frequently look over the growing system and make recommendations or changes to the existing functionality. But all parties realize that these changes take time and must be scheduled. So the changes do not cause anyone's expectations to be violated. In March, there is a major demonstration of the system to the board of directors. The system is very limited and is not yet in a form good enough to take to the trade show, but progress is steady, and the board is reasonably impressed.   The second release goes even more smoothly than the first. By now, the team has figured out a way to automate Jane's acceptance test scripts. The team has also refactored the design of the system to the point that it is really easy to add new features and change old ones. The second release was done by the end of June and was taken to the trade show. It had less in it than Jane and Russ would have liked, but it did demonstrate the most important features of the system. Although customers at the trade show noticed that certain features were missing, they were very impressed overall. You, Russ, and Jane all returned from the trade show with smiles on your faces. You all felt as though this project was a winner.   Indeed, many months later, you are contacted by Rufus Inc. That company had been working on a system like this for its internal operations. Rufus has canceled the development of that system after a death-march project and is negotiating to license your technology for its environment.   Indeed, things are looking up!

    Read the article

  • SQL SERVER – Signal Wait Time Introduction with Simple Example – Wait Type – Day 2 of 28

    - by pinaldave
    In this post, let’s delve a bit more in depth regarding wait stats. The very first question: when do the wait stats occur? Here is the simple answer. When SQL Server is executing any task, and if for any reason it has to wait for resources to execute the task, this wait is recorded by SQL Server with the reason for the delay. Later on we can analyze these wait stats to understand the reason the task was delayed and maybe we can eliminate the wait for SQL Server. It is not always possible to remove the wait type 100%, but there are few suggestions that can help. Before we continue learning about wait types and wait stats, we need to understand three important milestones of the query life-cycle. Running - a query which is being executed on a CPU is called a running query. This query is responsible for CPU time. Runnable – a query which is ready to execute and waiting for its turn to run is called a runnable query. This query is responsible for Signal Wait time. (In other words, the query is ready to run but CPU is servicing another query). Suspended – a query which is waiting due to any reason (to know the reason, we are learning wait stats) to be converted to runnable is suspended query. This query is responsible for wait time. (In other words, this is the time we are trying to reduce). In simple words, query execution time is a summation of the query Executing CPU Time (Running) + Query Wait Time (Suspended) + Query Signal Wait Time (Runnable). Again, it may be possible a query goes to all these stats multiple times. Let us try to understand the whole thing with a simple analogy of a taxi and a passenger. Two friends, Tom and Danny, go to the mall together. When they leave the mall, they decide to take a taxi. Tom and Danny both stand in the line waiting for their turn to get into the taxi. This is the Signal Wait Time as they are ready to get into the taxi but the taxis are currently serving other customer and they have to wait for their turn. In other word they are in a runnable state. Now when it is their turn to get into the taxi, the taxi driver informs them he does not take credit cards and only cash is accepted. Neither Tom nor Danny have enough cash, they both cannot get into the vehicle. Tom waits outside in the queue and Danny goes to ATM to fetch the cash. During this time the taxi cannot wait, they have to let other passengers get into the taxi. As Tom and Danny both are outside in the queue, this is the Query Wait Time and they are in the suspended state. They cannot do anything till they get the cash. Once Danny gets the cash, they are both standing in the line again, creating one more Signal Wait Time. This time when their turn comes they can pay the taxi driver in cash and reach their destination. The time taken for the taxi to get from the mall to the destination is running time (CPU time) and the taxi is running. I hope this analogy is bit clear with the wait stats. You can check the Signalwait stats using following query of Glenn Berry. -- Signal Waits for instance SELECT CAST(100.0 * SUM(signal_wait_time_ms) / SUM (wait_time_ms) AS NUMERIC(20,2)) AS [%signal (cpu) waits], CAST(100.0 * SUM(wait_time_ms - signal_wait_time_ms) / SUM (wait_time_ms) AS NUMERIC(20,2)) AS [%resource waits] FROM sys.dm_os_wait_stats OPTION (RECOMPILE); Higher the Signal wait stats are not good for the system. Very high value indicates CPU pressure. In my experience, when systems are running smooth and without any glitch the Signal wait stat is lower than 20%. Again, this number can be debated (and it is from my experience and is not documented anywhere). In other words, lower is better and higher is not good for the system. In future articles we will discuss in detail the various wait types and wait stats and their resolution. Read all the post in the Wait Types and Queue series. Reference: Pinal Dave (http://blog.SQLAuthority.com) Filed under: Pinal Dave, PostADay, SQL, SQL Authority, SQL DMV, SQL Performance, SQL Query, SQL Scripts, SQL Server, SQL Tips and Tricks, SQL Wait Stats, SQL Wait Types, T SQL, Technology

    Read the article

  • Integrate Nitro PDF Reader with Windows 7

    - by Matthew Guay
    Would you like a lightweight PDF reader that integrates nicely with Office and Windows 7?  Here we look at the new Nitro PDF Reader, a nice PDF viewer that also lets you create and markup PDF files. Adobe Reader is the de-facto PDF viewer, but it only lets you view PDFs and not much else.  Additionally, it doesn’t fully integrate with 64-bit editions of Vista and Windows 7.  There are many alternate PDF readers, but Nitro PDF Reader is a new entry into this field that offers more features than most PDF readers.  From the creators of the popular free PrimoPDF printer, the new Reader lets you create PDFs from a variety of file formats and markup existing PDFs with notes, highlights, stamps, and more in addition to viewing PDFs.  It also integrates great with Windows 7 using the Office 2010 ribbon interface. Getting Started Download the free Nitro PDF Reader (link below) and install as normal.  Nitro PDF Reader has separate versions for 32 & 64-bit editions of Windows, so download the correct one for your computer. Note:  Nitro PDF Reader is still in Beta testing, so only install if you’re comfortable with using beta software. On first run, Nitro PDF Reader will ask if you want to make it the default PDF viewer.  If you don’t want to, make sure to uncheck the box beside Always perform this check to keep it from opening this prompt every time you use it. It will also open an introductory PDF the first time you run it so you can quickly get acquainted with its features. Windows 7 Integration One of the first things you’ll notice is that Nitro PDF Reader integrates great with Windows 7.  The ribbon interface fits right in with native applications such as WordPad and Paint, as well as Office 2010. If you set Nitro PDF Reader as your default PDF viewer, you’ll see thumbnails of your PDFs in Windows Explorer. If you turn on the Preview Pane, you can read full PDFs in Windows Explorer.  Adobe Reader lets you do this in 32 bit versions, but Nitro PDF works in 64 bit versions too. The PDF preview even works in Outlook.  If you receive an email with a PDF attachment, you can select the PDF and view it directly in the Reading Pane.  Click the Preview file button, and you can uncheck the box at the bottom so PDFs will automatically open for preview if you want.   Now you can read your PDF attachments in Outlook without opening them separately.  This works in both Outlook 2007 and 2010. Edit your PDFs Adobe Reader only lets you view PDF files, and you can’t save data you enter in PDF forms.  Nitro PDF Reader, however, gives you several handy markup tools you can use to edit your PDFs.  When you’re done, you can save the final PDF, including information entered into forms. With the ribbon interface, it’s easy to find the tools you want to edit your PDFs. Here we’ve highlighted text in a PDF and added a note to it.  We can now save these changes, and they’ll look the same in any PDF reader, including Adobe Reader. You can also enter new text in PDFs.  This will open a new tab in the ribbon, where you can select basic font settings.  Select the Click To Finish button in the ribbon when you’re finished editing text.   Or, if you want to use the text or pictures from a PDF in another application, you can choose to extract them directly in Nitro PDF Reader.  Create PDFs One of the best features of Nitro PDF Reader is the ability to create PDFs from almost any file.  Nitro adds a new virtual printer to your computer that creates PDF files from anything you can print.  Print your file as normal, but select the Nitro PDF Creator (Reader) printer. Enter a name for your PDF, select if you want to edit the PDF properties, and click Create. If you choose to edit the PDF properties, you can add your name and information to the file, select the initial view, encrypt it, and restrict permissions. Alternately, you can create a PDF from almost any file by simply drag-and-dropping it into Nitro PDF Reader.  It will automatically convert the file to PDF and open it in a new tab in Nitro PDF. Now from the File menu you can send the PDF as an email attachment so anyone can view it. Make sure to save the PDF before closing Nitro, as it does not automatically save the PDF file.   Conclusion Nitro PDF Reader is a nice alternative to Adobe Reader, and offers some features that are only available in the more expensive Adobe Acrobat.  With great Windows 7 integration, including full support for 64-bit editions, Nitro fits in with the Windows and Office experience very nicely.  If you have tried out Nitro PDF Reader leave a comment and let us know what you think. Link Download Nitro PDF Reader Similar Articles Productive Geek Tips Install Adobe PDF Reader on Ubuntu EdgySubscribe to RSS Feeds in Chrome with a Single ClickChange Default Feed Reader in FirefoxFix for Windows Explorer Folder Pane in XP Becomes Grayed OutRemove "Please wait while the document is being prepared for reading" Message in Adobe Reader 8 TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips Xobni Plus for Outlook All My Movies 5.9 CloudBerry Online Backup 1.5 for Windows Home Server Snagit 10 tinysong gives a shortened URL for you to post on Twitter (or anywhere) 10 Superb Firefox Wallpapers OpenDNS Guide Google TV The iPod Revolution Ultimate Boot CD can help when disaster strikes

    Read the article

  • Remove Office 2010 Beta and Reinstall Office 2007

    - by Matthew Guay
    Have you tried out the Office 2010 beta, but want to go back to Office 2007?  Here’s a step-by-step tutorial on how to remove your Office 2010 beta and reinstall your Office 2007. The Office 2010 beta will expire on October 31, 2010, at which time you may see a dialog like the one below.  At that time, you will need to either upgrade to the final release of Office 2010, or reinstall your previous version of Office. Our computer was running the Office 2010 Home and Business Click to Run beta, and after uninstalling it we reinstalled Office 2007 Home and Student.  This was a Windows Vista computer, but the process will be exactly the same on Windows XP, Vista, or Windows 7.  Additionally, the process to reinstall Office 2007 will be exactly the same regardless of the edition of Office 2007 you’re using. However, please note that if you are running a different edition of Office 2010, especially the 64 bit version, the process may be slightly different.  We will cover this scenario in another article. Remove Office 2010 Click to Run Beta: To remove Office 2010 Click to Run Beta, open Control Panel and select Uninstall a Program. If your computer is running Windows 7, enter “Uninstall a program” in your Start menu search. Scroll down, select “Microsoft Office Click-to-Run 2010 (Beta)”, and click the Uninstall button on the toolbar.  Note that there will be two entries for Office, so make sure to select the “Click-to-Run” entry. This will automatically remove all of Office 2010 and its components.  Click Yes to confirm you want to remove it. Office 2010 beta uninstalled fairly quickly, and a reboot will be required.  Once your computer is rebooted, Office 2010 will be entirely removed. Reinstall Office 2007 Now, you’re to the easy part.  Simply insert your Office 2007 CD, and it should automatically startup the setup.  If not, open Computer and double-click on your CD drive.   Now, double-click on setup.exe to start the installation. Enter your product key, and click Continue…   Click Install Now, or click Customize if you want to change the default installation settings. Wait while Office 2007 installs…it takes around 15 to 20 minutes in our experience.  Once it’s finished  close the installer. Now, open one of the Office applications.  A popup will open asking you to activate Office.  Make sure you’re connected to the internet, and click next; otherwise, you can select to activate over the phone if you do not have internet access. This should only take a minute, and Office 2007 will be activated and ready to run. Everything should work just as it did before you installed Office 2010.  Enjoy! Office Updates Make sure to install the latest updates for Office 2007, as these are not included in your disk.  Check Windows Update (search for Windows Update in the Start menu search), and install all of the available updates for Office 2007, including Service Pack 2. Conclusion This is a great way to keep using Office even if you don’t decide to purchase Office 2010 after it is released.  Additionally, if you’re were using another version of Office, such as Office 2003, then reinstall it as normal after following the steps to remove Office 2010. Similar Articles Productive Geek Tips Add or Remove Apps from the Microsoft Office 2007 or 2010 SuiteDetect and Repair Applications In Microsoft Office 2007Save and Restore Your Microsoft Office SettingsDisable Office 2010 Beta Send-a-Smile from StartupHow to See the About Dialog and Version Information in Office 2007 TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips DVDFab 6 Revo Uninstaller Pro Registry Mechanic 9 for Windows PC Tools Internet Security Suite 2010 If Web Browsers Were Modes of Transportation Google Translate (for animals) Out of 100 Tweeters Roadkill’s Scan Port scans for open ports Out of band Security Update for Internet Explorer 7 Cool Looking Screensavers for Windows

    Read the article

  • C# 5 Async, Part 1: Simplifying Asynchrony – That for which we await

    - by Reed
    Today’s announcement at PDC of the future directions C# is taking excite me greatly.  The new Visual Studio Async CTP is amazing.  Asynchronous code – code which frustrates and demoralizes even the most advanced of developers, is taking a huge leap forward in terms of usability.  This is handled by building on the Task functionality in .NET 4, as well as the addition of two new keywords being added to the C# language: async and await. This core of the new asynchronous functionality is built upon three key features.  First is the Task functionality in .NET 4, and based on Task and Task<TResult>.  While Task was intended to be the primary means of asynchronous programming with .NET 4, the .NET Framework was still based mainly on the Asynchronous Pattern and the Event-based Asynchronous Pattern. The .NET Framework added functionality and guidance for wrapping existing APIs into a Task based API, but the framework itself didn’t really adopt Task or Task<TResult> in any meaningful way.  The CTP shows that, going forward, this is changing. One of the three key new features coming in C# is actually a .NET Framework feature.  Nearly every asynchronous API in the .NET Framework has been wrapped into a new, Task-based method calls.  In the CTP, this is done via as external assembly (AsyncCtpLibrary.dll) which uses Extension Methods to wrap the existing APIs.  However, going forward, this will be handled directly within the Framework.  This will have a unifying effect throughout the .NET Framework.  This is the first building block of the new features for asynchronous programming: Going forward, all asynchronous operations will work via a method that returns Task or Task<TResult> The second key feature is the new async contextual keyword being added to the language.  The async keyword is used to declare an asynchronous function, which is a method that either returns void, a Task, or a Task<T>. Inside the asynchronous function, there must be at least one await expression.  This is a new C# keyword (await) that is used to automatically take a series of statements and break it up to potentially use discontinuous evaluation.  This is done by using await on any expression that evaluates to a Task or Task<T>. For example, suppose we want to download a webpage as a string.  There is a new method added to WebClient: Task<string> WebClient.DownloadStringTaskAsync(Uri).  Since this returns a Task<string> we can use it within an asynchronous function.  Suppose, for example, that we wanted to do something similar to my asynchronous Task example – download a web page asynchronously and check to see if it supports XHTML 1.0, then report this into a TextBox.  This could be done like so: private async void button1_Click(object sender, RoutedEventArgs e) { string url = "http://reedcopsey.com"; string content = await new WebClient().DownloadStringTaskAsync(url); this.textBox1.Text = string.Format("Page {0} supports XHTML 1.0: {1}", url, content.Contains("XHTML 1.0")); } .csharpcode, .csharpcode pre { font-size: small; color: black; font-family: consolas, "Courier New", courier, monospace; background-color: #ffffff; /*white-space: pre;*/ } .csharpcode pre { margin: 0em; } .csharpcode .rem { color: #008000; } .csharpcode .kwrd { color: #0000ff; } .csharpcode .str { color: #006080; } .csharpcode .op { color: #0000c0; } .csharpcode .preproc { color: #cc6633; } .csharpcode .asp { background-color: #ffff00; } .csharpcode .html { color: #800000; } .csharpcode .attr { color: #ff0000; } .csharpcode .alt { background-color: #f4f4f4; width: 100%; margin: 0em; } .csharpcode .lnum { color: #606060; } Let’s walk through what’s happening here, step by step.  By adding the async contextual keyword to the method definition, we are able to use the await keyword on our WebClient.DownloadStringTaskAsync method call. When the user clicks this button, the new method (Task<string> WebClient.DownloadStringTaskAsync(string)) is called, which returns a Task<string>.  By adding the await keyword, the runtime will call this method that returns Task<string>, and execution will return to the caller at this point.  This means that our UI is not blocked while the webpage is downloaded.  Instead, the UI thread will “await” at this point, and let the WebClient do it’s thing asynchronously. When the WebClient finishes downloading the string, the user interface’s synchronization context will automatically be used to “pick up” where it left off, and the Task<string> returned from DownloadStringTaskAsync is automatically unwrapped and set into the content variable.  At this point, we can use that and set our text box content. There are a couple of key points here: Asynchronous functions are declared with the async keyword, and contain one or more await expressions In addition to the obvious benefits of shorter, simpler code – there are some subtle but tremendous benefits in this approach.  When the execution of this asynchronous function continues after the first await statement, the initial synchronization context is used to continue the execution of this function.  That means that we don’t have to explicitly marshal the call that sets textbox1.Text back to the UI thread – it’s handled automatically by the language and framework!  Exception handling around asynchronous method calls also just works. I’d recommend every C# developer take a look at the documentation on the new Asynchronous Programming for C# and Visual Basic page, download the Visual Studio Async CTP, and try it out.

    Read the article

  • OBIEE 11.1.1 - OBIEE 11g Full Sample App on VMware Player 4

    - by user809526
    The Full Sample App is designed to run on Virtual Box. Let's describe how to run it on VMware Player 4. Open Virtualization Format Tool http://communities.vmware.com/community/vmtn/server/vsphere/automationtools/ovf VMware Player Documentation https://www.vmware.com/support/pubs/player_pubs.html Full Sample App Deployment Guide sampleapp107-vbimage-deployguide-453583.pdf INSTALL VMplayer 4.0.0 as root LINUX # sh VMware-Player-4.0.0-471780.x86_64.bundle (A new VM is not needed and can be deleted later after that installation is completed. "I will install OS later" - blank hard disk Guest: linux, Red Hat Enterprise Linux 5-64bits => rename to RHEL target: eg /a/root/vmware/ Max disk size: 5 GB (will be deleted) Disk: Single file Dummy RHEL.vmk, RHEL.vmdk is generated. "Delete VM from Disk" in VM Player.) Copy Full Sample App files to target /a/root/vmware/ WARNING: Select a target eg /a/root/vmware/ with lots of free space, 95 GB. Check checksums (md5sum). Please do it! ff85c7eacf7fb8c382e98da875e879e1  Sampleapp_v107_GA-disk1.vmdk 973258cb3c7d64ab03ae853278cf2233  Sampleapp_v107_GA-disk2.vmdk e576be16e36d810479736bfb15d050f5  Sampleapp_v107_GA-disk3.vmdk 3455df77279e53e07d5fee6712f1597d  Sampleapp_v107_GA-disk4.vmdk OVF FILE   Sampleapp_v107_GA.ovf CONVERSION $ cd /a/root/vmware/ LINUX $ /usr/bin/ovftool -tt=ovf --compress=1 -dm=monolithicSparse Sampleapp_v107_GA.ovf .  [dot] Opening OVF source: Sampleapp_v107_GA.ovf Warning: No manifest file Opening OVF target: . Writing OVF package: Sampleapp_v107_GA/Sampleapp_v107_GA.ovf Disk Transfer Completed                   Completed successfully WINDOWS CYGWIN $ /cygdrive/c/VMwarePlayer/OVFTool/ovftool.exe -tt=ovf --compress=1 -dm=monolithicSparse Sampleapp_v107_GA.ovf .  [dot] Opening OVF source: Sampleapp_v107_GA.ovf Warning: No manifest file Opening OVF target: . Writing OVF package: Sampleapp_v107_GA\Sampleapp_v107_GA.ovf Disk Transfer Completed Completed successfully /a/root/vmware$ du -sk 49095328    .   [50 GB already occupied] IMPORT - First start of VM Player 4: /usr/bin/vmplayer "Open a Virtual Machine" Browse to /a/root/vmware/Sampleapp_v107_GA/Sampleapp_v107_GA.ovf [the new generated .ovf] "Import Virtual Machine" dialog Name: Sampleapp_v107_GA Location: /a/root/vmware/Sampleapp_v107_GA/storage [was /home/tdubois/vmware/Sampleapp_v107_GA] "Import" "The import failed because /a/root/vmware/Sampleapp_v107_GA/Sampleapp_v107_GA.ovf did not pass OVF specification conformance or virtual hardware compliance checks. Click Retry to relax OVF specification..." "Retry" ; Long import /a/root/vmware/Sampleapp_v107_GA/storage/Sampleapp_v107_GA.vmx and new .vmdk files are created. /a/root/vmware$ du -sk 95551384    .   [95 GB occupied] Full Sample App GUEST SETUP "Edit VM settings" min 3GB, 2+ processors, network bridged. For OBIEE + Essbase testing use 8 GB RAM hardware. At first time lauch of Full Sample App, leave OEL booting for several minutes undisturbed. Problem with X display server may occur [/usr/bin/Xorg ; man Xorg]. "Failed to start the X server.... Would you like to view the X server output to diagnose the problem?" "No" [tab key] "Would you like to try to configure the X server? Note that you will need the root password for this." "Yes" [oracle] X Display Settings 800x600 saved in /etc/X11/xorg.conf "Trying to restart the X server" Login as root/oracle in guest OEL. In guest OEL, Virtual Machine > Install VMware Tools... Extract archive VMwareTools-8.8.0-471268.tar.gz all files in writable local directory eg /root In Terminal run Perl script # cd /root/vmware-tools-distrib ; ./vmware-install.pl [keep all default answers] Set keyboard layout System > Preferences > Keyboard > Layouts Restart X server eg System > Log Out root... , relogin Modify X resolution System > Preferences > Screen Resolution Full Sample App OEL login: oracle/oracle ; root/oracle [default US keyboard layout] Credentials are described in the 'sampleapp107-vbimage-deployguide-453583.pdf' The large files in /a/root/vmware/ /a/root/vmware/Sampleapp_v107_GA/ may be removed. FAILURE REMARK: Adding the 4 original Sampleapp_v107_GA-disks[1234].vmdk to VM Player does NOT work as described below. "Edit VM settings" "Remove" "Hard Disk" "Edit VM settings" "Add" "Hard Disk" "Next" "Use an existing virtual disk" "Browse" "Finish" "Keep existing format" "Ok" for each 4 disks settings one by one. Start VM Player 4. "You do not have write access to a partition" Allow all Sampleapp_v107 OEL linux launches. OEL stalls silently after 'Checking filesystems'.

    Read the article

  • SQL SERVER – Single Wait Time Introduction with Simple Example – Wait Type – Day 2 of 28

    - by pinaldave
    In this post, let’s delve a bit more in depth regarding wait stats. The very first question: when do the wait stats occur? Here is the simple answer. When SQL Server is executing any task, and if for any reason it has to wait for resources to execute the task, this wait is recorded by SQL Server with the reason for the delay. Later on we can analyze these wait stats to understand the reason the task was delayed and maybe we can eliminate the wait for SQL Server. It is not always possible to remove the wait type 100%, but there are few suggestions that can help. Before we continue learning about wait types and wait stats, we need to understand three important milestones of the query life-cycle. Running - a query which is being executed on a CPU is called a running query. This query is responsible for CPU time. Runnable – a query which is ready to execute and waiting for its turn to run is called a runnable query. This query is responsible for Single Wait time. (In other words, the query is ready to run but CPU is servicing another query). Suspended – a query which is waiting due to any reason (to know the reason, we are learning wait stats) to be converted to runnable is suspended query. This query is responsible for wait time. (In other words, this is the time we are trying to reduce). In simple words, query execution time is a summation of the query Executing CPU Time (Running) + Query Wait Time (Suspended) + Query Single Wait Time (Runnable). Again, it may be possible a query goes to all these stats multiple times. Let us try to understand the whole thing with a simple analogy of a taxi and a passenger. Two friends, Tom and Danny, go to the mall together. When they leave the mall, they decide to take a taxi. Tom and Danny both stand in the line waiting for their turn to get into the taxi. This is the Signal Wait Time as they are ready to get into the taxi but the taxis are currently serving other customer and they have to wait for their turn. In other word they are in a runnable state. Now when it is their turn to get into the taxi, the taxi driver informs them he does not take credit cards and only cash is accepted. Neither Tom nor Danny have enough cash, they both cannot get into the vehicle. Tom waits outside in the queue and Danny goes to ATM to fetch the cash. During this time the taxi cannot wait, they have to let other passengers get into the taxi. As Tom and Danny both are outside in the queue, this is the Query Wait Time and they are in the suspended state. They cannot do anything till they get the cash. Once Danny gets the cash, they are both standing in the line again, creating one more Single Wait Time. This time when their turn comes they can pay the taxi driver in cash and reach their destination. The time taken for the taxi to get from the mall to the destination is running time (CPU time) and the taxi is running. I hope this analogy is bit clear with the wait stats. You can check the single wait stats using following query of Glenn Berry. -- Signal Waits for instance SELECT CAST(100.0 * SUM(signal_wait_time_ms) / SUM (wait_time_ms) AS NUMERIC(20,2)) AS [%signal (cpu) waits], CAST(100.0 * SUM(wait_time_ms - signal_wait_time_ms) / SUM (wait_time_ms) AS NUMERIC(20,2)) AS [%resource waits] FROM sys.dm_os_wait_stats OPTION (RECOMPILE); Higher the single wait stats are not good for the system. Very high value indicates CPU pressure. In my experience, when systems are running smooth and without any glitch the single wait stat is lower than 20%. Again, this number can be debated (and it is from my experience and is not documented anywhere). In other words, lower is better and higher is not good for the system. In future articles we will discuss in detail the various wait types and wait stats and their resolution. Read all the post in the Wait Types and Queue series. Reference: Pinal Dave (http://blog.SQLAuthority.com) Filed under: Pinal Dave, PostADay, SQL, SQL Authority, SQL DMV, SQL Performance, SQL Query, SQL Scripts, SQL Server, SQL Tips and Tricks, SQL Wait Stats, SQL Wait Types, T SQL, Technology

    Read the article

  • How to Assign a Static IP Address in XP, Vista, or Windows 7

    - by Mysticgeek
    When organizing your home network it’s easier to assign each computer it’s own IP address than using DHCP. Here we will take a look at doing it in XP, Vista, and Windows 7. If you have a home network with several computes and devices, it’s a good idea to assign each of them a specific address. If you use DHCP (Dynamic Host Configuration Protocol), each computer will request and be assigned an address every time it’s booted up. When you have to do troubleshooting on your network, it’s annoying going to each machine to figure out what IP they have. Using Static IPs prevents address conflicts between devices and allows you to manage them more easily. Assigning IPs to Windows is essentially the same process, but getting to where you need to be varies between each version. Windows 7 To change the computer’s IP address in Windows 7, type network and sharing into the Search box in the Start Menu and select Network and Sharing Center when it comes up.   Then when the Network and Sharing Center opens, click on Change adapter settings. Right-click on your local adapter and select Properties. In the Local Area Connection Properties window highlight Internet Protocol Version 4 (TCP/IPv4) then click the Properties button. Now select the radio button Use the following IP address and enter in the correct IP, Subnet mask, and Default gateway that corresponds with your network setup. Then enter your Preferred and Alternate DNS server addresses. Here we’re on a home network and using a simple Class C network configuration and Google DNS. Check Validate settings upon exit so Windows can find any problems with the addresses you entered. When you’re finished click OK. Now close out of the Local Area Connections Properties window. Windows 7 will run network diagnostics and verify the connection is good. Here we had no problems with it, but if you did, you could run the network troubleshooting wizard. Now you can open the command prompt and do an ipconfig  to see the network adapter settings have been successfully changed.   Windows Vista Changing your IP from DHCP to a Static address in Vista is similar to Windows 7, but getting to the correct location is a bit different. Open the Start Menu, right-click on Network, and select Properties. The Network and Sharing Center opens…click on Manage network connections. Right-click on the network adapter you want to assign an IP address and click Properties. Highlight Internet Protocol Version 4 (TCP/IPv4) then click the Properties button. Now change the IP, Subnet mask, Default Gateway, and DNS Server Addresses. When you’re finished click OK. You’ll need to close out of Local Area Connection Properties for the settings to go into effect. Open the Command Prompt and do an ipconfig to verify the changes were successful.   Windows XP In this example we’re using XP SP3 Media Center Edition and changing the IP address of the Wireless adapter. To set a Static IP in XP right-click on My Network Places and select Properties. Right-click on the adapter you want to set the IP for and select Properties. Highlight Internet Protocol (TCP/IP) and click the Properties button. Now change the IP, Subnet mask, Default Gateway, and DNS Server Addresses. When you’re finished click OK. You will need to close out of the Network Connection Properties screen before the changes go into effect.   Again you can verify the settings by doing an ipconfig in the command prompt. In case you’re not sure how to do this, click on Start then Run.   In the Run box type in cmd and click OK. Then at the prompt type in ipconfig and hit Enter. This will show the IP address for the network adapter you changed.   If you have a small office or home network, assigning each computer a specific IP address makes it a lot easier to manage and troubleshoot network connection problems. Similar Articles Productive Geek Tips Change Ubuntu Desktop from DHCP to a Static IP AddressChange Ubuntu Server from DHCP to a Static IP AddressVista Breadcrumbs for Windows XPCreate a Shortcut or Hotkey for the Safely Remove Hardware DialogCreate a Shortcut or Hotkey to Eject the CD/DVD Drive TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips HippoRemote Pro 2.2 Xobni Plus for Outlook All My Movies 5.9 CloudBerry Online Backup 1.5 for Windows Home Server Nice Websites To Watch TV Shows Online 24 Million Sites Windows Media Player Glass Icons (icons we like) How to Forecast Weather, without Gadgets Outlook Tools, one stop tweaking for any Outlook version Zoofs, find the most popular tweeted YouTube videos

    Read the article

  • Share a Printer on Your Network from Vista or XP to Windows 7

    - by Mysticgeek
    The other day we looked at sharing a printer between Windows 7 machines, but you may only have one Windows 7 machine and the printer is connected to a Vista or XP computer. Today we show you how to share a printer from either Vista or XP to Windows 7. We previously showed you how to share files and printers between Windows 7 and XP. But what if you have a printer connected to an XP or Vista machine in another room, and you want to print to it from Windows 7? This guide will walk you through the process. Note: In these examples we’re using 32-bit versions of Windows 7, Vista, and XP on a basic home network. We are using an HP PSC 1500 printer, but keep in mind every printer is different so finding and installing the correct drivers will vary. Share a Printer from Vista To share the printer on a Vista machine click on Start and enter printers into the search box and hit Enter. Right-click on the printer you want to share and select Sharing from the context menu. Now in Printer Properties, select the Sharing tab, mark the box next to Share this printer, and give the printer a name. Make sure the name is something simple with no spaces then click Ok. Share a Printer from XP To share a printer from XP click on Start then select Printers and Faxes. In the Printers and Faxes window right-click on the printer to share and select Sharing. In the Printer Properties window select the Sharing tab and the radio button next to Share this printer and give it a short name with no spaces then click Ok. Add Printer to Windows 7 Now that we have the printer on Vista or XP set up to be shared, it’s time to add it to Windows 7. Open the Start Menu and click on Devices and Printers. In Devices and Printers click on Add a printer. Next click on Add a network, wireless or Bluetooth printer. Windows 7 will search for the printer on your network and once its been found click Next. The printer has been successfully added…click Next. Now you can set it as the default printer and send a test page to verify everything works. If everything is successful, close out of the add printer screens and you should be good to go.   Alternate Method If the method above doesn’t work, you’ll can try the following for either XP or Vista. In our example, when trying to add the printer connected to our XP machine, it wasn’t recognized automatically. If you’re search pulls up nothing then click on The printer that I want isn’t listed. In the Add Printer window under Find a printer by name or TCP/IP address click the radio button next to Select a shared printer by name. You can either type in the path to the printer or click on Browse to find it. In this instance we decided to browse to it and notice we have 5 computers found on the network. We want to be able to print to the XPMCE computer so we double-click on that. Type in the username and password for that computer… Now we see the printer and can select it. The path to the printer is put into the Select a shared printer by name field. Wait while Windows connects to the printer and installs it… It’s successfully added…click Next. Now you can set it as the default printer or not and print a test page to make sure everything works successfully. Now when we go back to Devices and Printers under Printers and Faxes, we see the HP printer on XPMCE. Conclusion Sharing a printer from one machine to another can sometimes be tricky, but the method we used here in our setup worked well. Since the printer we used is fairly new, there wasn’t a problem with locating any drivers for it. Windows 7 includes a lot of device drivers already so you may be surprised on what it’s able to install. Your results may vary depending on your type of printer, Windows version, and network setup. This should get you started configuring the machines on your network—hopefully with good results.  If you you have two Windows 7 computers, then sharing a printer or files is easy through the Homegroup feature. You can also share a printer between Windows 7 machines on the same network but not Homegroup. Similar Articles Productive Geek Tips Share a Printer Between Windows 7 Machines Not in the Same HomegroupShare Files and Printers between Windows 7 and XPHow To Share Files and Printers Between Windows 7 and VistaEnable Mapping to \HostnameC$ Share on Windows 7 or VistaUse the Homegroup Feature in Windows 7 to Share Printers and Files TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips Revo Uninstaller Pro Registry Mechanic 9 for Windows PC Tools Internet Security Suite 2010 PCmover Professional Enable Check Box Selection in Windows 7 OnlineOCR – Free OCR Service Betting on the Blind Side, a Vanity Fair article 30 Minimal Logo Designs that Say More with Less LEGO Digital Designer – Free Create a Personal Website Quickly using Flavors.me

    Read the article

  • Share a Printer on Your Network from Vista or XP to Windows 7

    - by Mysticgeek
    The other day we looked at sharing a printer between Windows 7 machines, but you may only have one Windows 7 machine and the printer is connected to a Vista or XP computer. Today we show you how to share a printer from either Vista or XP to Windows 7. We previously showed you how to share files and printers between Windows 7 and XP. But what if you have a printer connected to an XP or Vista machine in another room, and you want to print to it from Windows 7? This guide will walk you through the process. Note: In these examples we’re using 32-bit versions of Windows 7, Vista, and XP on a basic home network. We are using an HP PSC 1500 printer, but keep in mind every printer is different so finding and installing the correct drivers will vary. Share a Printer from Vista To share the printer on a Vista machine click on Start and enter printers into the search box and hit Enter. Right-click on the printer you want to share and select Sharing from the context menu. Now in Printer Properties, select the Sharing tab, mark the box next to Share this printer, and give the printer a name. Make sure the name is something simple with no spaces then click Ok. Share a Printer from XP To share a printer from XP click on Start then select Printers and Faxes. In the Printers and Faxes window right-click on the printer to share and select Sharing. In the Printer Properties window select the Sharing tab and the radio button next to Share this printer and give it a short name with no spaces then click Ok. Add Printer to Windows 7 Now that we have the printer on Vista or XP set up to be shared, it’s time to add it to Windows 7. Open the Start Menu and click on Devices and Printers. In Devices and Printers click on Add a printer. Next click on Add a network, wireless or Bluetooth printer. Windows 7 will search for the printer on your network and once its been found click Next. The printer has been successfully added…click Next. Now you can set it as the default printer and send a test page to verify everything works. If everything is successful, close out of the add printer screens and you should be good to go.   Alternate Method If the method above doesn’t work, you’ll can try the following for either XP or Vista. In our example, when trying to add the printer connected to our XP machine, it wasn’t recognized automatically. If you’re search pulls up nothing then click on The printer that I want isn’t listed. In the Add Printer window under Find a printer by name or TCP/IP address click the radio button next to Select a shared printer by name. You can either type in the path to the printer or click on Browse to find it. In this instance we decided to browse to it and notice we have 5 computers found on the network. We want to be able to print to the XPMCE computer so we double-click on that. Type in the username and password for that computer… Now we see the printer and can select it. The path to the printer is put into the Select a shared printer by name field. Wait while Windows connects to the printer and installs it… It’s successfully added…click Next. Now you can set it as the default printer or not and print a test page to make sure everything works successfully. Now when we go back to Devices and Printers under Printers and Faxes, we see the HP printer on XPMCE. Conclusion Sharing a printer from one machine to another can sometimes be tricky, but the method we used here in our setup worked well. Since the printer we used is fairly new, there wasn’t a problem with locating any drivers for it. Windows 7 includes a lot of device drivers already so you may be surprised on what it’s able to install. Your results may vary depending on your type of printer, Windows version, and network setup. This should get you started configuring the machines on your network—hopefully with good results.  If you you have two Windows 7 computers, then sharing a printer or files is easy through the Homegroup feature. You can also share a printer between Windows 7 machines on the same network but not Homegroup. Similar Articles Productive Geek Tips Share a Printer Between Windows 7 Machines Not in the Same HomegroupShare Files and Printers between Windows 7 and XPHow To Share Files and Printers Between Windows 7 and VistaEnable Mapping to \HostnameC$ Share on Windows 7 or VistaUse the Homegroup Feature in Windows 7 to Share Printers and Files TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips Revo Uninstaller Pro Registry Mechanic 9 for Windows PC Tools Internet Security Suite 2010 PCmover Professional Enable Check Box Selection in Windows 7 OnlineOCR – Free OCR Service Betting on the Blind Side, a Vanity Fair article 30 Minimal Logo Designs that Say More with Less LEGO Digital Designer – Free Create a Personal Website Quickly using Flavors.me

    Read the article

  • UCM 11g is 4 days old!

    - by kyle.hatlestad
    Ok...so I missed posting a blog entry when UCM 11g and the entire ECM suite released on Tuesday. Hopefully you've already seen the announcements on any number of the Oracle ECM blogs out there such as ECM Alerts, Fusion ECM, bex huff, or C4. So I won't bore you with the same talking points like 179 million check-ins per day or 124 web site page hits per second. Instead, I thought I'd show some screenshots of the new features in UCM and URM 11g. WebLogic Server and Enterprise Manager So probably the biggest change in 11g is UCM and URM now run on top of the WebLogic Server application server. This is a huge step as ECM is now on a standard platform with the rest of Oracle Fusion Middleware which makes installation, configuration, and integration consistent among all the products. From a feature perspective, it's also beneficial because it's now integrated with Oracle Enterprise Manager. Enterprise Manager provides a lot of provisioning control over servers as well as performance monitoring and access to logs and debugging information. Desktop Integration Suite Desktop Integration Suite got a complete overhaul for 11g. It exposes a lot more features within Windows Explorer such as saved searches, workflow queue, and checked-out items. It also now support metadata pop-up screens to let users fill in additional metadata when they drag-n-drop files in! And the integration within Office applications has changed significantly by introducing a dedicated UCM menu to do open, save, compare, etc. Site Studio for External Applications In UCM Site Studio 10gR4, a major architectural shift was introduced which brought several new objects such as elements, region definitions, region templates, and placeholder definitions. This truly separated the content from the display and from the definition. It also allowed separation of the content from needing to be rendered on a complete Site Studio page. Well, the new Site Studio for External Applications takes advantage of that architecture and introduces pre-built tags and plug-ins to JDeveloper to allow to go from simply adding a content area to your web application page to building an entire web site, just like you would have done in Site Studio Designer. In addition to these changes, enhancements to the core Site Studio have been added as well. One of the big ones is called Designer Mode which allows power-users to bypass the standard rules defined by the placeholder definition or template and perform any number of additional actions. This reduces the need to go back to Site Studio Designer or JDeveloper to make more advanced changes to the site. Dashboards As part of the updated records management functionality in both UCM and URM, users can now set a dashboard view on their home page to surface common functions in a single view. It has pre-built "portlets" users can choose from to display and organize they way they want. Behind the scenes, these dashboards are stored as Content Folios. So the dashboards themselves are content items that can be revisioned and shared between users. And new dashboard portlets can be easily added (like the User Profile one in the screenshots) by getting a copy of an existing one, modifying the display, and then checking it in as a new one to select from. URM Interface Enhancements URM includes several new UI and usability enhancements in 11g. There is a new view for physical records, a place to configure "favorite" items to quickly get to, and new placement of the records management menu. BI Publisher Reports Records management in UCM and URM now offer reports generated through embedded BI Publisher. Templates are controlled by rich text files checked directly into the repository, so they can be easily modified. Other Features A new Inbound Refinery conversion option is available that does native Microsoft Office HTML conversion. If your IBR is on Windows and you have the native applications loaded, the IBR can use them to produce HTML. A new GUI template editor for Dynamic Converter is available. It's written in Java so is available through all the supported browsers and platforms. The original ActiveX based editor is also still available. The Component Manager interface has changed to help provide an easier and more descriptive way to enable core components that are installed along with UCM. All of the supported components are immediately available to turn on and do not have to be installed separately as in previous versions. My Downloads is located in the My Content Server menu and provides for easy download of client installs including Desktop Integration Suite and Site Studio Designer. Well, hopefully that gives you a taste for some of the new things in 11g. We're all pretty excited here at Oracle about all the new changes and enhancements. Over the next few months I hope to highlight some of these features more in-depth, so keep your eye out for those posts.

    Read the article

  • SQL SERVER – Database Dynamic Caching by Automatic SQL Server Performance Acceleration

    - by pinaldave
    My second look at SafePeak’s new version (2.1) revealed to me few additional interesting features. For those of you who hadn’t read my previous reviews SafePeak and not familiar with it, here is a quick brief: SafePeak is in business of accelerating performance of SQL Server applications, as well as their scalability, without making code changes to the applications or to the databases. SafePeak performs database dynamic caching, by caching in memory result sets of queries and stored procedures while keeping all those cache correct and up to date. Cached queries are retrieved from the SafePeak RAM in microsecond speed and not send to the SQL Server. The application gets much faster results (100-500 micro seconds), the load on the SQL Server is reduced (less CPU and IO) and the application or the infrastructure gets better scalability. SafePeak solution is hosted either within your cloud servers, hosted servers or your enterprise servers, as part of the application architecture. Connection of the application is done via change of connection strings or adding reroute line in the c:\windows\system32\drivers\etc\hosts file on all application servers. For those who would like to learn more on SafePeak architecture and how it works, I suggest to read this vendor’s webpage: SafePeak Architecture. More interesting new features in SafePeak 2.1 In my previous review of SafePeak new I covered the first 4 things I noticed in the new SafePeak (check out my article “SQLAuthority News – SafePeak Releases a Major Update: SafePeak version 2.1 for SQL Server Performance Acceleration”): Cache setup and fine-tuning – a critical part for getting good caching results Database templates Choosing which database to cache Monitoring and analysis options by SafePeak Since then I had a chance to play with SafePeak some more and here is what I found. 5. Analysis of SQL Performance (present and history): In SafePeak v.2.1 the tools for understanding of performance became more comprehensive. Every 15 minutes SafePeak creates and updates various performance statistics. Each query (or a procedure execute) that arrives to SafePeak gets a SQL pattern, and after it is used again there are statistics for such pattern. An important part of this product is that it understands the dependencies of every pattern (list of tables, views, user defined functions and procs). From this understanding SafePeak creates important analysis information on performance of every object: response time from the database, response time from SafePeak cache, average response time, percent of traffic and break down of behavior. One of the interesting things this behavior column shows is how often the object is actually pdated. The break down analysis allows knowing the above information for: queries and procedures, tables, views, databases and even instances level. The data is show now on all arriving queries, both read queries (that can be cached), but also any types of updates like DMLs, DDLs, DCLs, and even session settings queries. The stats are being updated every 15 minutes and SafePeak dashboard allows going back in time and investigating what happened within any time frame. 6. Logon trigger, for making sure nothing corrupts SafePeak cache data If you have an application with many parts, many servers many possible locations that can actually update the database, or the SQL Server is accessible to many DBAs or software engineers, each can access some database directly and do some changes without going thru SafePeak – this can create a potential corruption of the data stored in SafePeak cache. To make sure SafePeak cache is correct it needs to get all updates to arrive to SafePeak, and if a DBA will access the database directly and do some changes, for example, then SafePeak will simply not know about it and will not clean SafePeak cache. In the new version, SafePeak brought a new feature called “Logon Trigger” to solve the above challenge. By special click of a button SafePeak can deploy a special server logon trigger (with a CLR object) on your SQL Server that actually monitors all connections and informs SafePeak on any connection that is coming not from SafePeak. In SafePeak dashboard there is an interface that allows to control which logins can be ignored based on login names and IPs, while the rest will invoke cache cleanup of SafePeak and actually locks SafePeak cache until this connection will not be closed. Important to note, that this does not interrupt any logins, only informs SafePeak on such connection. On the Dashboard screen in SafePeak you will be able to see those connections and then decide what to do with them. Configuration of this feature in SafePeak dashboard can be done here: Settings -> SQL instances management -> click on instance -> Logon Trigger tab. Other features: 7. User management ability to grant permissions to someone without changing its configuration and only use SafePeak as performance analysis tool. 8. Better reports for analysis of performance using 15 minute resolution charts. 9. Caching of client cursors 10. Support for IPv6 Summary SafePeak is a great SQL Server performance acceleration solution for users who want immediate results for sites with performance, scalability and peak spikes challenges. Especially if your apps are packaged or 3rd party, since no code changes are done. SafePeak can significantly increase response times, by reducing network roundtrip to the database, decreasing CPU resource usage, eliminating I/O and storage access. SafePeak team provides a free fully functional trial www.safepeak.com/download and actually provides a one-on-one assistance during such trial. Reference: Pinal Dave (http://blog.SQLAuthority.com) Filed under: About Me, Pinal Dave, PostADay, SQL, SQL Authority, SQL Performance, SQL Query, SQL Server, SQL Tips and Tricks, SQL Utility, T SQL, Technology

    Read the article

  • MySQL 5.5 brings in new ways to authenticate users

    - by Georgi Kodinov
    Ever wanted to use your server's OS for authenticating MySQL users ? Or the corporate LDAP repository ? Unfortunately options like the above are plentiful nowadays. And providing hard-coded support for protocol X or service Y is not the best possible idea. MySQL 5.5 has taken the step into the right direction by providing an infrastructure allowing one to make the server understand different authentication protocols by creating a set of simple plugins (one for the client and one for the server). So now you can easily extend MySQL to search for and authenticate users in your favorite user directory. In fact the API supplied is so versatile that we took the possibility to re-design the current "native" authentication mechanism into a built-in always-on plugin ! OK, let me give you an example: Imagine we have a bunch of users defined in your OS, e.g. we have a user joro with his respective password. And we have a MySQL instance running on the same computer. It would not be unexpected to need to let joro access and/or modify MySQL data. The first step is to define him as a MySQL user. And there's a problem right there : MySQL's CREATE USER joro@localhost IDENTIFIED BY 'joros_password' statement needs a password. And this is a password in no way related to the password that joro have set up in the OS. What's worse : if joro changes his OS password this will in no way be reflected in MySQL. So he'll need to change his MySQL password in a separate step. Not very convenient, specially when you have a lot of users. This is a laborious setup for joro's DBA as well : he'll have to disable his access in both MySQL and the OS should he decides that joro's out of the "nice" list. Now mysql 5.5 to the rescue: Imagine that the smart DBA has created a MySQL server plugin that will check if the name of the user logging in is a valid and enabled OS name and if the password supplied to the mysql client matches the OS and has called this plugin 'auth_os'. Now all that's left to do is to define joro as a MySQL user that will be authenticated externally. This is done by the following command : CREATE USER 'joro'@'localhost' IDENTIFIED WITH 'auth_os'; Now joro can login to MySQL using his current OS password. Note : joro is still a valid MySQL user, so you can grant privileges to him just like you would for all other users. What's better: you can have users that authenticate using different mechanisms in the same server. So you can e.g. safely experiment with external authentication for selected users while keeping your current user base operational. What happens under the hood when joro logs in ? The server will find out by the user definition that it needs to use a non-default authentication and will ask the client to "switch" to using the appropriate client-side plugin (if of course the client is not already using it). If the client can't do this (e.g. because it's an old client or doesn't have the necessary plugin available) the server will reject the login. Otherwise the server will let the server-side plugin decide (while possibly talking to the client side plugin and the OS user directory) if this is a valid login or not. If it is the login process will continue as usual, while if it's not the login will get rejected. There's a lot more that MySQL 5.5 can do for you than just the simple case above. Stay tuned for more advanced use cases like mapping groups of external users to a single MySQL user (so you won't have to have 1-to-1 mapping between your external user directory and your mysql user repository) or ways to control the process as a DBA. Or you can simply skip ahead and read the relevant topics from MySQL's excellent online documentation. Or take a look at the example plugins in plugin/auth. Or take a look at the test suite in mysql-test/t/plugin_auth.test. Changelog entry: http://dev.mysql.com/doc/refman/5.5/en/news-5-5-7.html Primary new sections: Pluggable authentication Proxy users Client plugin C API functions Revised sections: New PROXY privilege New proxies_priv grant table Passwords might be external New external_user and proxy_user system variables New --default-auth and --plugin-dir mysql options New MYSQL_DEFAULT_AUTH and MYSQL_PLUGIN_DIR options for mysql_options() CREATE USER has IDENTIFIED WITH clause to specify auth plugin GRANT has PROXY privilege, IDENTIFIED WITH clause to specify auth plugin The data structure for writing client plugins

    Read the article

  • Create an iTunes Account without a credit card

    - by Matthew Guay
    iTunes Store offers a large variety of free content, but to download it you have to have an account. Usually you have to enter your credit card information to sign up, but here’s an easy way to get an iTunes account for free downloads without entering any payment info. Although iTunes Store is known for paid downloads of movies, music, and more, it also has a treasure trove of free media.  Some of it, including Podcasts and iTunes U educational content do not require an account to download.  However, any other free content, including free iPhone/iPod Touch apps and free or promotional music, videos, and TV Shows all require an account to download.  If you try to download a free movie or music download, you will be required to enter payment information. Even though your card will not be charged, it will be kept on file so you can be charged if you download a for-pay item.  However, if you only plan to download free items, it may be preferable to not have your account linked to a credit card. The following steps will get you an account without entering your credit card info. Getting Started First, make sure you have iTunes installed.  If you don’t already have it, download and install it (link below) with the default settings. Now open iTunes, and click the iTunes Store link on the left. Click the App Store link on the top of this page. Select a free app to download.  A simple way to do this is to scroll down to the Top Free Apps box on the right side, hover your mouse over the first item, and click on the Free button that appears when you hover over it. A popup will open asking you to sign in with your Apple ID.  Click “Create New Account”. Click Continue to create your account. Check the box to accept the Store Terms and Conditions, and click Continue.   Enter your email address, password, security question, and date of birth, and uncheck the boxes to get email if you don’t want it…then click Continue. Now, you will be asked to provide a payment method.  Notice now that the last option says None!  Click that bullet option… Then enter your billing address.  Simply enter your normal billing address, even though you are not entering a payment method.  Click Continue and your account will be created! If you get the Address Verification screen just verify your county and click Done. An email will be sent to you to verify your account… Click on the link in your email to verify your account, iTunes will launch and you’re prompted to enter in the Apple ID and Password you just created. Your account is successfully created! Now you can easily download any free media from iTunes.  Keep an eye on the Free on iTunes box on the bottom of the iTunes Store page for interesting downloads, or if you have an iPhone or iPod Touch, watch the popular Free downloads on the Apps page. And of course there is always great content on iTunes U to grab free as well. Purchasing for-pay media If you want to purchase an item on the iTunes store later, simply click on the item to download as normal.  Click Buy to proceed with the purchase. iTunes will prompt you that you need to enter payment information to complete the purchase.  Enter your Apple ID email and password, and then add the payment information as prompted.   Remove Payment Information from an iTunes Account If you’ve already entered payment information into your iTunes account, and would like to remove it, click Store in the top iTunes menu, and select View My Account. Enter your Apple ID email and password, and click View Account.   This will open your account information.  Click the Edit Payment Information button.   Now, click the None button to remove your payment information.  Click Done to save the changes. Your account will now prompt you to enter payment information if you try to make a purchase.  You could repeat these steps after making a purchase if you do not want iTunes to keep your payment info on file. Conclusion This is a great way to make an iTunes account without entering your credit card, or to remove your credit card info from your account.  Parents may especially enjoy this tip, as they can have an iTunes account on their kids computer or iPod Touch without worrying about them spending money with it. Links Download iTunes Similar Articles Productive Geek Tips Quick Tip: Switch Between Signatures in Outlook 2007 the Easy WayRedeem Pre-paid Zune Card Points for Zune Marketplace MediaCreate An Electronic Business Card In Outlook 2007Understanding Windows Vista Aero Glass RequirementsSpeed up Your Windows Vista Computer with ReadyBoost TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips Revo Uninstaller Pro Registry Mechanic 9 for Windows PC Tools Internet Security Suite 2010 PCmover Professional Draw Online using Harmony How to Browse Privately in Firefox Kill Processes Quickly with Process Assassin Need to Come Up with a Good Name? Try Wordoid StockFox puts a Lightweight Stock Ticker in your Statusbar Explore Google Public Data Visually

    Read the article

  • Connecting to DB2 from SSIS

    - by Christopher House
    The project I'm currently working on involves moving various pieces of data from a legacy DB2 environment to some SQL Server and flat file locations.  Most of the data flows are real time, so they were a natural fit for the client's MQSeries on their iSeries servers and BizTalk to handle the messaging.  Some of the data flows, however, are daily batch type transmissions.  For the daily batch transmissions, it was decided that we'd use SSIS to pull the data direct from DB2 to either a SQL Server or flat file.  I'm not at all an SSIS guy, I've done a bit here and there, but mainly for situations were we needed to move data from a dev environment to QA, mostly informal stuff like that.  And, as much as I'm not an SSIS guy, I'm even less a DB2/iSeries guy.  Prior to this engagement, my knowledge of DB2 was limited to the fact that it's an IBM product and that it was probably a DBMS flatform (that's what the DB in DB2 means, right?).   One of my first goals when I came onto this project was to develop of POC SSIS package to pull some data from DB2 and dump it to a flat file.  It sounded like a pretty straight forward task.  As always, the devil is in the details.  Configuring the DB2 connection manager took a bit of trial and error.  As such, I thought I'd post my experiences here in hopes that they might save someone the efforts I went through.  That being said, please keep in mind, as I pointed out, I'm not at all a DB2 guy, so my terminology and explanations may not be 100% spot on. Before you get started, you need to figure out how you're going to connect to DB2.  From the research I did, it looks like there are a few options.  IBM has both an OLE DB and .Net data provider which can be found here.  I installed their client access tools and tried to use both the .Net and OLE DB providers but I received an error message from both when attempting to connect to the iSeries that indicated I needed a license for a product called DB2 Connect.  I inquired with one of my client's iSeries resources about a license for this product and it appears they didn't have one, so that meant the IBM drivers were out.  The other option that I found quite a bit of discussion around was Microsoft's OLE DB Provider for DB2.  This driver is part of the feature pack for SQL Server 2008 Enterprise Edition and can be downloaded here. As it turns out, I already had Microsoft's driver installed on my dev VM, which stuck me as odd since I hadn't installed it.  I discovered that the driver is installed with the BizTalk adapter pack for host systems, which was also installed on my VM.  However, it looks like the version used by the adapter pack is newer than the version provided in the SQL Server feature pack.   Once you get the driver installed, create a connection manager in your package just like you normally would and select the Microsoft OLE DB Provider for DB2 from the list of available drivers. After you select the driver, you'll need to enter in your host name, login credentials and initial catalog. A couple of things to note here.  First, the Initial catalog needs to be the same as your host name.  Not sure why that is, but trust me, it just does.  Second, for credentials, in my environment, we're using what the client's iSeries people refer to as "profiles".  I guess this is similar to SQL auth in the SQL Server world.  In other words, they've given me a username and password for connecting to DB, so I've entered it here. Next, click the Data Links button.  On the Data Links screen, enter your package collection on the first tab. Package collection is one of those DB2 concepts I'm still trying to figure out.  From the little bit I've read, packages are used to control SQL compilation and each DB2 connection needs one.  The package collection, I believe, controls where your package is created.  One of the iSeries folks I've been working with told me that I should always use QGPL for my package collection, as QGPL is "general purpose" and doesn't require any additional authority. Next click the ellipsis next to the Network drop-down.  Here you'll want to enter your host name again. Again, not sure why you need to do this, but trust me, my connection wouldn't work until I entered my hostname here. Finally, go to the Advanced tab, select your DBMS platform and check Process binary as character. My environment is DB2 on the iSeries and iSeries is the replacement for AS/400, so I selected DB2/AS400 for my platform.  Process binary as character was necessary to handle some of the DB2 data types.  I had a few columns that showed all their data as "System.Byte[]".  Checking Process binary as character resolved this. At this point, you should be good to go.  You can go back to the Connection tab on the Data Links dialog to perform a couple of tests to validate your configuration.  The Test Connection button is obvious, this just verifies you can connect to the host using the configuration data you've entered.  The Packages button will attempt to connect to the host and create the packages required to execute queries. This isn't meant to be a comprehensive look SSIS and DB2, these are just some of the notes I've come up with since I've started working with DB2 and SSIS.  I'm sure as I continue developing my packages, I'll find more quirks and will post them here.

    Read the article

  • 6 Interesting Facts About NASA’s Mars Rover ‘Curiosity’

    - by Gopinath
    Humans quest for exploring the surrounding planets to see whether we can live there or not is taking new shape today. NASA’s Mars probing robot, Curiosity, blasted off today on its 9 months journey to reach Mars and explore it for the possibilities of life there. Scientist says that Curiosity is one most advanced rover ever launched to probe life on other planets. Here is the launch video and some analysis by a news reporter Lets look at the 6 interesting facts about the mission 1. It’s as big as a car Curiosity is the biggest ever rover ever launched by NASA to probe life on outer planets. It’s as big as a car and almost double the size of its predecessor rover Spirit. The length of Curiosity is around 9 feet 10 inches(3 meters), width is 9 feet 1 inch (2.8 meters) and height is 7 feet (2.1 meters). 2. Powered by Plutonium – Lasts 24×7 for 23 months The earlier missions of NASA to explore Mars are powered by Solar power and that hindered capabilities of the rovers to move around when the Sun is hiding. Due to dependency of Sun the earlier rovers were not able to traverse the places where there is no Sun light. Curiosity on the other hand is equipped with a radioisotope power system that generates electricity from the heat emitted by plutonium’s radioactive decay. The plutonium weighs around 10 pounds and can generate power required for operating the rover close to 23 weeks. The best part of the new power system is, Curiosity can roam around in darkness, light and all year around. 3. Rocket powered backpack for a science fiction style landing The Curiosity is so heavy that NASA could not use parachute and balloons to air-drop the rover on the surface of Mars like it’s previous missions. They are trying out a new science fiction style air-dropping mechanism that is similar to sky crane heavy-lift helicopter. The landing of the rover begins first with entry into the Mars atmosphere protected by a heat shield. At about 6 miles to the surface, the heat shield is jettisoned and a parachute is deployed to glide the rover smoothly. When the rover touches 3 miles above the surface, the parachute is jettisoned and the eight motors rocket backpack is used for a smooth and impact free landing as shown in the image. Here is an animation created by NASA on the landing sequence. If you are interested in getting more detailed information about the landing process check this landing sequence picture available on NASA website 4. Equipped with Star Wars style laser gun Hollywood movie directors and novelist always imagined aliens coming to earth with spaceships full of laser guns and blasting the objects which comes on their way. With Curiosity the equations are going to change. It has a powerful laser gun equipped in one of it’s arms to beam laser on rocks to vaporize them. This is not part of any assault mission Curiosity is expected to carry out, the laser gun is will be used to carry out experiments to detect life and understand nature. 5. Most sophisticated laboratory powered by 10 instruments Around 10 state of art instruments are part of Curiosity rover and the these 10 instruments form a most advanced rover based lab ever built by NASA. There are instruments to cut through rocks to examine them and other instruments will search for organic compounds. Mounted cameras can study targets from a distance, arm mounted instruments can study the targets they touch. Microscopic lens attached to the arm can see and magnify tiny objects as tiny as 12.5 micro meters. 6. Rover Carrying 1.24 million names etched on silicon Early June 2009 NASA launched a campaign called “Send Your Name to Mars” and around 1.24 million people registered their names through NASA’s website. All those 1.24 million names are etched on Silicon chips mounted onto Curiosity’s deck. If you had registered your name in the campaign may be your name is going to reach Mars soon. Curiosity On Web If you wish to follow the mission here are few links to help you NASA’s Curiosity Web Page Follow Curiosity on Facebook Follow @MarsCuriosity on Twitter Artistic Gallery Image of Mars Rover Curiosity A printable sheet of Curiosity Mission [pdf] Images credit: NASA This article titled,6 Interesting Facts About NASA’s Mars Rover ‘Curiosity’, was originally published at Tech Dreams. Grab our rss feed or fan us on Facebook to get updates from us.

    Read the article

  • 8 Things You Can Do In Android’s Developer Options

    - by Chris Hoffman
    The Developer Options menu in Android is a hidden menu with a variety of advanced options. These options are intended for developers, but many of them will be interesting to geeks. You’ll have to perform a secret handshake to enable the Developer Options menu in the Settings screen, as it’s hidden from Android users by default. Follow the simple steps to quickly enable Developer Options. Enable USB Debugging “USB debugging” sounds like an option only an Android developer would need, but it’s probably the most widely used hidden option in Android. USB debugging allows applications on your computer to interface with your Android phone over the USB connection. This is required for a variety of advanced tricks, including rooting an Android phone, unlocking it, installing a custom ROM, or even using a desktop program that captures screenshots of your Android device’s screen. You can also use ADB commands to push and pull files between your device and your computer or create and restore complete local backups of your Android device without rooting. USB debugging can be a security concern, as it gives computers you plug your device into access to your phone. You could plug your device into a malicious USB charging port, which would try to compromise you. That’s why Android forces you to agree to a prompt every time you plug your device into a new computer with USB debugging enabled. Set a Desktop Backup Password If you use the above ADB trick to create local backups of your Android device over USB, you can protect them with a password with the Set a desktop backup password option here. This password encrypts your backups to secure them, so you won’t be able to access them if you forget the password. Disable or Speed Up Animations When you move between apps and screens in Android, you’re spending some of that time looking at animations and waiting for them to go away. You can disable these animations entirely by changing the Window animation scale, Transition animation scale, and Animator duration scale options here. If you like animations but just wish they were faster, you can speed them up. On a fast phone or tablet, this can make switching between apps nearly instant. If you thought your Android phone was speedy before, just try disabling animations and you’ll be surprised how much faster it can seem. Force-Enable FXAA For OpenGL Games If you have a high-end phone or tablet with great graphics performance and you play 3D games on it, there’s a way to make those games look even better. Just go to the Developer Options screen and enable the Force 4x MSAA option. This will force Android to use 4x multisample anti-aliasing in OpenGL ES 2.0 games and other apps. This requires more graphics power and will probably drain your battery a bit faster, but it will improve image quality in some games. This is a bit like force-enabling antialiasing using the NVIDIA Control Panel on a Windows gaming PC. See How Bad Task Killers Are We’ve written before about how task killers are worse than useless on Android. If you use a task killer, you’re just slowing down your system by throwing out cached data and forcing Android to load apps from system storage whenever you open them again. Don’t believe us? Enable the Don’t keep activities option on the Developer options screen and Android will force-close every app you use as soon as you exit it. Enable this app and use your phone normally for a few minutes — you’ll see just how harmful throwing out all that cached data is and how much it will slow down your phone. Don’t actually use this option unless you want to see how bad it is! It will make your phone perform much more slowly — there’s a reason Google has hidden these options away from average users who might accidentally change them. Fake Your GPS Location The Allow mock locations option allows you to set fake GPS locations, tricking Android into thinking you’re at a location where you actually aren’t. Use this option along with an app like Fake GPS location and you can trick your Android device and the apps running on it into thinking you’re at locations where you actually aren’t. How would this be useful? Well, you could fake a GPS check-in at a location without actually going there or confuse your friends in a location-tracking app by seemingly teleporting around the world. Stay Awake While Charging You can use Android’s Daydream Mode to display certain apps while charging your device. If you want to force Android to display a standard Android app that hasn’t been designed for Daydream Mode, you can enable the Stay awake option here. Android will keep your device’s screen on while charging and won’t turn it off. It’s like Daydream Mode, but can support any app and allows users to interact with them. Show Always-On-Top CPU Usage You can view CPU usage data by toggling the Show CPU usage option to On. This information will appear on top of whatever app you’re using. If you’re a Linux user, the three numbers on top probably look familiar — they represent the system load average. From left to right, the numbers represent your system load over the last one, five, and fifteen minutes. This isn’t the kind of thing you’d want enabled most of the time, but it can save you from having to install third-party floating CPU apps if you want to see CPU usage information for some reason. Most of the other options here will only be useful to developers debugging their Android apps. You shouldn’t start changing options you don’t understand. If you want to undo any of these changes, you can quickly erase all your custom options by sliding the switch at the top of the screen to Off.     

    Read the article

  • Install SharePoint 2013 on a two server farm

    - by sreejukg
    When SharePoint 2010 was released, I published an article on how to install SharePoint on a two server farm. You can find that article from the below link. http://weblogs.asp.net/sreejukg/archive/2010/09/28/install-sharepoint-2010-in-a-farm-environment.aspx Now it is the time for SharePoint 2013. SharePoint 2013 brings lots of improvements to the topologies, but still supports two-server architecture. Be noted that “two-server architecture” is meant for small implementations with limited service applications. Refer the below link to understand more about the SharePoint architecture http://technet.microsoft.com/en-us/sharepoint/fp123594.aspx A two tier farm consists of a database server and a web/application server as follows. In this article I am going to explain how to install SharePoint in a two server farm. I prepared 2 servers, both of them joined to a domain(SP2013Domain), and in one server I installed SQL Server 2012 (Server name: SP2013_DB). Now I am going to install SharePoint 2013 in the second server (Server Name: SP2013). The following domain accounts are created for the installation.   User Account Purpose Server roles required SQLService - SQL Server service account - This account is used as the service account for SQL Server. - domain user account / local account spSetup - You will be running SharePoint setup and SharePoint products and configuration wizard using this account. -domain user account - Member of the Administrators group on each server on which Setup is run(In our case SP2013) - SQL Server login on the computer running SQL Server - Member of the Server admin SQL Server security role spDataaccess - Configure and manage server farm. This - Application pool identity for central admin website - Microsoft SharePoint Foundation Workflow Timer Service Domain user account (Other permissions will be set to this account automatically)   The above are the minimum list of accounts needed for SharePoint 2013 installation. Now you need additional accounts for services, application pool identities for web applications etc. Refer the service accounts requirements for SharePoint from the below link. http://technet.microsoft.com/en-us/library/cc263445.aspx In order to install SharePoint 2013 login to the server using setup account(spsetup). Now run the setup from the installation media. First you need to install the pre-requisites. During the installation process, the server may restart several times. The installation wizard will guide you through the installation. In the next step, you need to agree on the terms and conditions as usual. Once you click next, the installation will start immediately. The installation wizard will let you know the progress of the installation. During the installation you may receive notifications to restart the server, you need to just click the finish button so that the system will be restarted. Once all the pre-requisites are installed, you will get the success message as below. Click finish to close the dialog. Now from the media, run the setup again and this time you choose install SharePoint server. In the next screen, you need to enter the product key, and then click continue. Now you need to agree on the terms and conditions for SharePoint 2013, and click continue. Choose the file location as per your policies and click on the install now button. You will see the installation progress. Once completed, you will see the installation completed dialog. Make sure you select the run products and configuration wizard option and click close. From the start screen, click next to start the configuration wizard. You will receive warning telling you some of the services will be stopped during the installation. Select “create new server farm” radio button and click next. In the next step, you need to enter the configuration database settings. Enter the database server details and then specify the database access account. You need to specify the farm account(spdataaccess). The wizard will grant additional privileges to the account as needed. In the next step you need to specify the passphrase, you need to note this as you need this passphrase if you add additional server to the farm. In the next step, you need to enter the central administration website port and security settings. You can choose a port or just keep it as suggested by the wizard. Click next, you will see the summary of what you have been selected. Verify the selected settings and if you want to change any, just click back and change them, or click continue to start the configuration. The configuration may take some time, you can view the progress, in case of any error, you will get the log file, you need to fix any error and again start the configuration wizard. Once the configuration successful, you will see the success message. Just click finish. Now you can browse the central administration website. It is good to check the health analyzer to review whether there are any errors/warnings. No warnings/errors indicate a good installation. Two-Server architecture is the least configuration for production environments. For small firms with less number of employees can implement SharePoint 2013 using this topology and as the workload increases, they can add more servers to the farm without reconstructing everything.

    Read the article

  • How to Collect Debug Info for Oracle SQL Developer

    - by thatjeffsmith
    In a perfect world, there would be no software bugs. Developers would always test their code. QA would find any scenarios and bugs the developers hadn’t already thought of. Regression tests would be complete and flawless. But alas, we can only afford to pay mere humans here, so we will have bugs from time to time. Or sometimes you are trying to do something the software wasn’t designed for, or perhaps your machine has exhausted it’s resources trying to build the un-buildable. When you run into problems, you will need help. Developers need your help so they can help you. Surprisingly enough, feedback like this isn’t very helpful: Your program isn’t working. How can I make it work? When you are ready to work with us on the SQL Developer OTN forum, you will most likely be asked to run SQL Developer and capture the output from the command console. In case you need help with this, ere’s a step-by-step process you can follow in Windows 7 (should work in XP too.) Open a windows command window Start – Run – CMD Once it’s open, click on the window icon and select ‘Defaults.’ Change the default buffer size to be something bigger, much bigger. Set the CMD window default buffer size HIGHER Note: you only need to do this once. Navigate to your SQL Developer Installation Folder Instead of running the ‘sqldeveloper.exe’ file in the root directory, we are going to go several sub-directories down. Find the ‘bin’ sub-directory and run the ‘sqldeveloper.exe’ there. When you do this, a CMD window will open, and then you’ll see the SQL Developer application load. The SQL Developer bin directory - run the tool from here and get a logging window Use SQL Developer as normal, until it ‘breaks’ or ‘hangs’ Now, you are ready to grab the nitty-gritty information that MIGHT tell the developer what is going wrong or happening in your scenario. Click back into the CMD window Send a Ctrl+Break or a Ctrl+Pause. If you on a newer laptop that doesn’t have this key, be sure to check the ‘Fn’ subset of keys. If you need to map the BREAK or PAUSE buttons, this article might help. You can also try the on-screen keyboard in windows – just type ‘OSK’ in your START – RUN prompt. Copy the logging information from the command window – all of it We need this information, help us get it! Open a case with Oracle Support or Start a Thread on the Forums Or email me. If you’re on my blog reading this, it’s the least I can do to help Now, before you hit ‘Send’ or ‘Post’ or ‘Submit’ – be sure to add a brief description of what you were doing in the application when you ran into the problem. Even if you were doing ‘nothing,’ let us know how many connections you had open, what windows were active, etc. The more you can tell us, the higher your odds go up to getting a quick fix or at least an answer as to what is happening. Also include the following information: The version of SQL Developer you are running The version of the JDK you are using The OS you are using The version of Oracle you are connected to Now, don’t be surprised if you get asked to upgrade to a supported configuration, say ‘version 3.1 and the 1.6 JDK.’ Supporting older versions of software is fun, and while we enjoy a challenge, it may be easier for you to upgrade your way out of the problem at hand.

    Read the article

< Previous Page | 762 763 764 765 766 767 768 769 770 771 772 773  | Next Page >