Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 347/1407 | < Previous Page | 343 344 345 346 347 348 349 350 351 352 353 354  | Next Page >

  • Information About Mambo and Joomla

    JOOMLA and MAMBO was originally developed by a team called Mambo. In 2005, the main developers of Mambo left the team and build the JOOMLA system. Regardless of the history of these two systems, they have turn into a leading hosting system in the industry. These two CMS platform software is the most easiest to use and manage content management that is why it is the most preferred CMS software by most web developer.

    Read the article

  • Upgrade from 12.04 to 13.04? [duplicate]

    - by user12008
    This question already has an answer here: Can I skip over releases when upgrading? 15 answers I have Kubuntu 12.04, and would like to upgrade, but Muon Software Updates tells me that "The software on this computer is up to date". What can I make to make it see new version of the distribution? In shell, do-release-upgrade, also says: No new release found.

    Read the article

  • Is the using of dirname(__FILE__) a good practice?

    - by webose
    looking at the code of Joomla I see that in the first line of the index, it defines the base path of installation with the dirname(FILE) is this a font of possible risk for the site, I mean if a non controlled error message show the internal path of the Joomla directory, because of, for example a failed include, can it be used to perform some kind of attack to the site ? If yes, is it convenient to use this function ? Any idea is welcome. Thanks

    Read the article

  • Bordeaux 2.0.4 - Hands on Review

    <b>Thoughts on Technology:</b> "I think Crossover is fantastic software, but with Cedega pretty much being dead where is the choice in commercial Wine software? Lesser known than the two previously mentioned is Bordeaux."

    Read the article

  • Wubi and Vista 64 bits can't work

    - by Daok
    First of all, I have posted this issue at Ubuntu Forum without success yet. Hello, I have downloaded "kubuntu-9.10-desktop-amd64.iso" and I have mounted it on my Windows Vista 64 bits Ultimate. I have downloaded wubi 9.10. The problem is when installing, it crash after few time. Here is the log file: 11-26 21:07 INFO root: === wubi 9.10ubuntu1 rev160 === 11-26 21:07 DEBUG root: Logfile is c:\users\patrick\appdata\local\temp\wubi-9.10ubuntu1-rev160.log 11-26 21:07 DEBUG root: sys.argv = ['main.pyo', '--exefile="Z:\\wubi.exe"'] 11-26 21:07 DEBUG CommonBackend: data_dir=C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\data 11-26 21:07 DEBUG WindowsBackend: 7z=C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\bin\7z.exe 11-26 21:07 DEBUG CommonBackend: Fetching basic info... 11-26 21:07 DEBUG CommonBackend: original_exe=Z:\wubi.exe 11-26 21:07 DEBUG CommonBackend: platform=win32 11-26 21:07 DEBUG CommonBackend: osname=nt 11-26 21:07 DEBUG CommonBackend: language=fr_CA 11-26 21:07 DEBUG CommonBackend: encoding=cp1252 11-26 21:07 DEBUG WindowsBackend: arch=amd64 11-26 21:07 DEBUG CommonBackend: Parsing isolist=C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\data\isolist.ini 11-26 21:07 DEBUG CommonBackend: Adding distro Xubuntu-i386 11-26 21:07 DEBUG CommonBackend: Adding distro Xubuntu-amd64 11-26 21:07 DEBUG CommonBackend: Adding distro Kubuntu-amd64 11-26 21:07 DEBUG CommonBackend: Adding distro Mythbuntu-i386 11-26 21:07 DEBUG CommonBackend: Adding distro Ubuntu-amd64 11-26 21:07 DEBUG CommonBackend: Adding distro Ubuntu-i386 11-26 21:07 DEBUG CommonBackend: Adding distro Mythbuntu-amd64 11-26 21:07 DEBUG CommonBackend: Adding distro Kubuntu-i386 11-26 21:07 DEBUG CommonBackend: Adding distro KubuntuNetbook-i386 11-26 21:07 DEBUG CommonBackend: Adding distro UbuntuNetbookRemix-i386 11-26 21:07 DEBUG WindowsBackend: Fetching host info... 11-26 21:07 DEBUG WindowsBackend: registry_key=Software\Microsoft\Windows\CurrentVersion\Uninstall\Wubi 11-26 21:07 DEBUG WindowsBackend: windows version=vista 11-26 21:07 DEBUG WindowsBackend: windows_version2=Windows (TM) Vista Ultimate 11-26 21:07 DEBUG WindowsBackend: windows_sp=None 11-26 21:07 DEBUG WindowsBackend: windows_build=6002 11-26 21:07 DEBUG WindowsBackend: gmt=-5 11-26 21:07 DEBUG WindowsBackend: country=CA 11-26 21:07 DEBUG WindowsBackend: timezone=America/Montreal 11-26 21:07 DEBUG WindowsBackend: windows_username=Patrick 11-26 21:07 DEBUG WindowsBackend: user_full_name=Patrick 11-26 21:07 DEBUG WindowsBackend: user_directory=C:\Users\Patrick 11-26 21:07 DEBUG WindowsBackend: windows_language_code=1036 11-26 21:07 DEBUG WindowsBackend: windows_language=French 11-26 21:07 DEBUG WindowsBackend: processor_name=Intel(R) Core(TM)2 Quad CPU Q6600 @ 2.40GHz 11-26 21:07 DEBUG WindowsBackend: bootloader=vista 11-26 21:07 DEBUG WindowsBackend: system_drive=Drive(C: hd 239816.335938 mb free ntfs) 11-26 21:07 DEBUG WindowsBackend: drive=Drive(C: hd 239816.335938 mb free ntfs) 11-26 21:07 DEBUG WindowsBackend: drive=Drive(D: cd 0.0 mb free ) 11-26 21:07 DEBUG WindowsBackend: drive=Drive(E: hd 483619.367188 mb free ntfs) 11-26 21:07 DEBUG WindowsBackend: drive=Drive(G: hd 84606.9375 mb free fat32) 11-26 21:07 DEBUG WindowsBackend: drive=Drive(Z: cd 0.0 mb free cdfs) 11-26 21:07 DEBUG WindowsBackend: uninstaller_path=C:\ubuntu\uninstall-wubi.exe 11-26 21:07 DEBUG WindowsBackend: previous_target_dir=C:\ubuntu 11-26 21:07 DEBUG WindowsBackend: previous_distro_name=Kubuntu 11-26 21:07 DEBUG WindowsBackend: keyboard_id=269029385 11-26 21:07 DEBUG WindowsBackend: keyboard_layout=ca 11-26 21:07 DEBUG WindowsBackend: keyboard_variant= 11-26 21:07 DEBUG CommonBackend: python locale=('fr_CA', 'cp1252') 11-26 21:07 DEBUG CommonBackend: locale=fr_CA.UTF-8 11-26 21:07 DEBUG WindowsBackend: total_memory_mb=4095.99999905 11-26 21:07 DEBUG CommonBackend: Searching ISOs on USB devices 11-26 21:07 DEBUG CommonBackend: Searching for local CDs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Ubuntu Netbook Remix CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Kubuntu Netbook CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Ubuntu Netbook Remix CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Kubuntu Netbook CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Ubuntu Netbook Remix CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Kubuntu Netbook CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Ubuntu Netbook Remix CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Kubuntu Netbook CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether Z:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: parsing info from str=Kubuntu 9.10 "Karmic Koala" - Release amd64 (20091027) 11-26 21:07 DEBUG Distro: parsed info={'name': 'Kubuntu', 'subversion': 'Release', 'version': '9.10', 'build': '20091027', 'codename': 'Karmic Koala', 'arch': 'amd64'} 11-26 21:07 DEBUG Distro: wrong name: Kubuntu != Ubuntu 11-26 21:07 DEBUG Distro: checking whether Z:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: wrong name: Kubuntu != Ubuntu 11-26 21:07 DEBUG Distro: checking whether Z:\ is a valid Ubuntu Netbook Remix CD 11-26 21:07 DEBUG Distro: wrong name: Kubuntu != Ubuntu Netbook Remix 11-26 21:07 DEBUG Distro: checking whether Z:\ is a valid Kubuntu CD 11-26 21:07 INFO Distro: Found a valid CD for Kubuntu: Z:\ 11-26 21:07 INFO root: Running the CD menu... 11-26 21:07 DEBUG WindowsFrontend: __init__... 11-26 21:07 DEBUG WindowsFrontend: on_init... 11-26 21:07 INFO WinuiPage: appname=wubi, localedir=C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\translations, languages=['fr_CA', 'fr'] 11-26 21:07 INFO WinuiPage: appname=wubi, localedir=C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\translations, languages=['fr_CA', 'fr'] 11-26 21:07 INFO root: CD menu finished 11-26 21:07 INFO root: Already installed, running the uninstaller... 11-26 21:07 INFO root: Running the uninstaller... 11-26 21:07 INFO CommonBackend: This is the uninstaller running 11-26 21:07 INFO WinuiPage: appname=wubi, localedir=C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\translations, languages=['fr_CA', 'fr'] 11-26 21:07 INFO root: Received settings 11-26 21:07 INFO WinuiPage: appname=wubi, localedir=C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\translations, languages=['fr_CA', 'fr'] 11-26 21:07 DEBUG TaskList: # Running tasklist... 11-26 21:07 DEBUG TaskList: ## Running Sauvegarder l'ISO... 11-26 21:07 DEBUG TaskList: ## Finished Sauvegarder l'ISO 11-26 21:07 DEBUG TaskList: ## Running Supprimer l'entrée pour le programme d'amorçage... 11-26 21:07 DEBUG WindowsBackend: Could not find bcd id 11-26 21:07 DEBUG WindowsBackend: undo_bootini C: 11-26 21:07 DEBUG WindowsBackend: undo_configsys Drive(C: hd 239816.335938 mb free ntfs) 11-26 21:07 DEBUG WindowsBackend: undo_bootini E: 11-26 21:07 DEBUG WindowsBackend: undo_configsys Drive(E: hd 483619.367188 mb free ntfs) 11-26 21:07 DEBUG WindowsBackend: undo_bootini G: 11-26 21:07 DEBUG WindowsBackend: undo_configsys Drive(G: hd 84606.9375 mb free fat32) 11-26 21:07 DEBUG TaskList: ## Finished Supprimer l'entrée pour le programme d'amorçage 11-26 21:07 DEBUG TaskList: ## Running Supprimer le répertoire cible... 11-26 21:07 DEBUG CommonBackend: Deleting C:\ubuntu 11-26 21:07 DEBUG TaskList: ## Finished Supprimer le répertoire cible 11-26 21:07 DEBUG TaskList: ## Running Supprimer la clé du registre... 11-26 21:07 DEBUG TaskList: ## Finished Supprimer la clé du registre 11-26 21:07 DEBUG TaskList: # Finished tasklist 11-26 21:07 INFO root: Almost finished uninstalling 11-26 21:07 INFO root: Finished uninstallation 11-26 21:07 DEBUG CommonBackend: Fetching basic info... 11-26 21:07 DEBUG CommonBackend: original_exe=Z:\wubi.exe 11-26 21:07 DEBUG CommonBackend: platform=win32 11-26 21:07 DEBUG CommonBackend: osname=nt 11-26 21:07 DEBUG WindowsBackend: arch=amd64 11-26 21:07 DEBUG CommonBackend: Parsing isolist=C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\data\isolist.ini 11-26 21:07 DEBUG CommonBackend: Adding distro Xubuntu-i386 11-26 21:07 DEBUG CommonBackend: Adding distro Xubuntu-amd64 11-26 21:07 DEBUG CommonBackend: Adding distro Kubuntu-amd64 11-26 21:07 DEBUG CommonBackend: Adding distro Mythbuntu-i386 11-26 21:07 DEBUG CommonBackend: Adding distro Ubuntu-amd64 11-26 21:07 DEBUG CommonBackend: Adding distro Ubuntu-i386 11-26 21:07 DEBUG CommonBackend: Adding distro Mythbuntu-amd64 11-26 21:07 DEBUG CommonBackend: Adding distro Kubuntu-i386 11-26 21:07 DEBUG CommonBackend: Adding distro KubuntuNetbook-i386 11-26 21:07 DEBUG CommonBackend: Adding distro UbuntuNetbookRemix-i386 11-26 21:07 DEBUG WindowsBackend: Fetching host info... 11-26 21:07 DEBUG WindowsBackend: registry_key=Software\Microsoft\Windows\CurrentVersion\Uninstall\Wubi 11-26 21:07 DEBUG WindowsBackend: windows version=vista 11-26 21:07 DEBUG WindowsBackend: windows_version2=Windows (TM) Vista Ultimate 11-26 21:07 DEBUG WindowsBackend: windows_sp=None 11-26 21:07 DEBUG WindowsBackend: windows_build=6002 11-26 21:07 DEBUG WindowsBackend: gmt=-5 11-26 21:07 DEBUG WindowsBackend: country=CA 11-26 21:07 DEBUG WindowsBackend: timezone=America/Montreal 11-26 21:07 DEBUG WindowsBackend: windows_username=Patrick 11-26 21:07 DEBUG WindowsBackend: user_full_name=Patrick 11-26 21:07 DEBUG WindowsBackend: user_directory=C:\Users\Patrick 11-26 21:07 DEBUG WindowsBackend: windows_language_code=1036 11-26 21:07 DEBUG WindowsBackend: windows_language=French 11-26 21:07 DEBUG WindowsBackend: processor_name=Intel(R) Core(TM)2 Quad CPU Q6600 @ 2.40GHz 11-26 21:07 DEBUG WindowsBackend: bootloader=vista 11-26 21:07 DEBUG WindowsBackend: system_drive=Drive(C: hd 240512.851563 mb free ntfs) 11-26 21:07 DEBUG WindowsBackend: drive=Drive(C: hd 240512.851563 mb free ntfs) 11-26 21:07 DEBUG WindowsBackend: drive=Drive(D: cd 0.0 mb free ) 11-26 21:07 DEBUG WindowsBackend: drive=Drive(E: hd 483523.867188 mb free ntfs) 11-26 21:07 DEBUG WindowsBackend: drive=Drive(G: hd 84445.65625 mb free fat32) 11-26 21:07 DEBUG WindowsBackend: drive=Drive(Z: cd 0.0 mb free cdfs) 11-26 21:07 DEBUG WindowsBackend: uninstaller_path=None 11-26 21:07 DEBUG WindowsBackend: previous_target_dir=None 11-26 21:07 DEBUG WindowsBackend: previous_distro_name=None 11-26 21:07 DEBUG WindowsBackend: keyboard_id=269029385 11-26 21:07 DEBUG WindowsBackend: keyboard_layout=ca 11-26 21:07 DEBUG WindowsBackend: keyboard_variant= 11-26 21:07 DEBUG WindowsBackend: total_memory_mb=4095.99999905 11-26 21:07 DEBUG CommonBackend: Searching ISOs on USB devices 11-26 21:07 DEBUG CommonBackend: Searching for local CDs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Ubuntu Netbook Remix CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Kubuntu Netbook CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Ubuntu Netbook Remix CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Kubuntu Netbook CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether D:\ is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain D:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Ubuntu Netbook Remix CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Kubuntu Netbook CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether E:\ is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain E:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Ubuntu Netbook Remix CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Kubuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Kubuntu Netbook CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Xubuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether G:\ is a valid Mythbuntu CD 11-26 21:07 DEBUG Distro: does not contain G:\casper\filesystem.squashfs 11-26 21:07 DEBUG Distro: checking whether Z:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: wrong name: Kubuntu != Ubuntu 11-26 21:07 DEBUG Distro: checking whether Z:\ is a valid Ubuntu CD 11-26 21:07 DEBUG Distro: wrong name: Kubuntu != Ubuntu 11-26 21:07 DEBUG Distro: checking whether Z:\ is a valid Ubuntu Netbook Remix CD 11-26 21:07 DEBUG Distro: wrong name: Kubuntu != Ubuntu Netbook Remix 11-26 21:07 DEBUG Distro: checking whether Z:\ is a valid Kubuntu CD 11-26 21:07 INFO Distro: Found a valid CD for Kubuntu: Z:\ 11-26 21:07 INFO root: Running the installer... 11-26 21:07 INFO WinuiPage: appname=wubi, localedir=C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\translations, languages=['fr_CA', 'fr'] 11-26 21:07 INFO WinuiPage: appname=wubi, localedir=C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\translations, languages=['fr_CA', 'fr'] 11-26 21:07 DEBUG WinuiInstallationPage: target_drive=C:, installation_size=17000MB, distro_name=Kubuntu, language=en_US, locale=en_US.UTF-8, username=patrick 11-26 21:07 INFO root: Received settings 11-26 21:07 INFO WinuiPage: appname=wubi, localedir=C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\translations, languages=['en_US', 'en'] 11-26 21:07 DEBUG TaskList: # Running tasklist... 11-26 21:07 DEBUG TaskList: ## Running select_target_dir... 11-26 21:07 INFO WindowsBackend: Installing into C:\ubuntu 11-26 21:07 DEBUG TaskList: ## Finished select_target_dir 11-26 21:07 DEBUG TaskList: ## Running create_dir_structure... 11-26 21:07 DEBUG CommonBackend: Creating dir C:\ubuntu 11-26 21:07 DEBUG CommonBackend: Creating dir C:\ubuntu\disks 11-26 21:07 DEBUG CommonBackend: Creating dir C:\ubuntu\install 11-26 21:07 DEBUG CommonBackend: Creating dir C:\ubuntu\install\boot 11-26 21:07 DEBUG CommonBackend: Creating dir C:\ubuntu\disks\boot 11-26 21:07 DEBUG CommonBackend: Creating dir C:\ubuntu\disks\boot\grub 11-26 21:07 DEBUG CommonBackend: Creating dir C:\ubuntu\install\boot\grub 11-26 21:07 DEBUG TaskList: ## Finished create_dir_structure 11-26 21:07 DEBUG TaskList: ## Running uncompress_target_dir... 11-26 21:07 DEBUG TaskList: ## Finished uncompress_target_dir 11-26 21:07 DEBUG TaskList: ## Running create_uninstaller... 11-26 21:07 DEBUG WindowsBackend: Copying uninstaller Z:\wubi.exe -> C:\ubuntu\uninstall-wubi.exe 11-26 21:07 DEBUG registry: Setting registry key -2147483646 Software\Microsoft\Windows\CurrentVersion\Uninstall\Wubi UninstallString C:\ubuntu\uninstall-wubi.exe 11-26 21:07 DEBUG registry: Setting registry key -2147483646 Software\Microsoft\Windows\CurrentVersion\Uninstall\Wubi InstallationDir C:\ubuntu 11-26 21:07 DEBUG registry: Setting registry key -2147483646 Software\Microsoft\Windows\CurrentVersion\Uninstall\Wubi DisplayName Kubuntu 11-26 21:07 DEBUG registry: Setting registry key -2147483646 Software\Microsoft\Windows\CurrentVersion\Uninstall\Wubi DisplayIcon C:\ubuntu\Kubuntu.ico 11-26 21:07 DEBUG registry: Setting registry key -2147483646 Software\Microsoft\Windows\CurrentVersion\Uninstall\Wubi DisplayVersion 9.10ubuntu1-rev160 11-26 21:07 DEBUG registry: Setting registry key -2147483646 Software\Microsoft\Windows\CurrentVersion\Uninstall\Wubi Publisher Kubuntu 11-26 21:07 DEBUG registry: Setting registry key -2147483646 Software\Microsoft\Windows\CurrentVersion\Uninstall\Wubi URLInfoAbout http://www.kubuntu.org 11-26 21:07 DEBUG registry: Setting registry key -2147483646 Software\Microsoft\Windows\CurrentVersion\Uninstall\Wubi HelpLink http://www.ubuntu.com/support 11-26 21:07 DEBUG TaskList: ## Finished create_uninstaller 11-26 21:07 DEBUG TaskList: ## Running copy_installation_files... 11-26 21:07 DEBUG WindowsBackend: Copying C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\data\custom-installation -> C:\ubuntu\install\custom-installation 11-26 21:07 DEBUG WindowsBackend: Copying C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\winboot -> C:\ubuntu\winboot 11-26 21:07 DEBUG WindowsBackend: Copying C:\Users\Patrick\AppData\Local\Temp\pyl5A09.tmp\data\images\Kubuntu.ico -> C:\ubuntu\Kubuntu.ico 11-26 21:07 DEBUG TaskList: ## Finished copy_installation_files 11-26 21:07 DEBUG TaskList: ## Running get_iso... 11-26 21:07 DEBUG TaskList: New task copy_file 11-26 21:07 DEBUG TaskList: ### Running copy_file... 11-26 21:09 DEBUG TaskList: ### Finished copy_file 11-26 21:09 ERROR TaskList: [Errno 22] Invalid argument Traceback (most recent call last): File "\lib\wubi\backends\common\tasklist.py", line 197, in __call__ File "\lib\wubi\backends\common\utils.py", line 209, in copy_file IOError: [Errno 22] Invalid argument 11-26 21:09 DEBUG TaskList: # Cancelling tasklist 11-26 21:09 DEBUG TaskList: New task check_iso 11-26 21:09 ERROR root: [Errno 22]

    Read the article

  • How do I parse file paths separated by a space in a string?

    - by user1130637
    Background: I am working in Automator on a wrapper to a command line utility. I need a way to separate an arbitrary number of file paths delimited by a single space from a single string, so that I may remove all but the first file path to pass to the program. Example input string: /Users/bobby/diddy dum/ding.mp4 /Users/jimmy/gone mia/come back jimmy.mp3 ... Desired output: /Users/bobby/diddy dum/ding.mp4 Part of the problem is the inflexibility on the Automator end of things. I'm using an Automator action which returns unescaped POSIX filepaths delimited by a space (or comma). This is unfortunate because: 1. I cannot ensure file/folder names will not contain either a space or comma, and 2. the only inadmissible character in Mac OS X filenames (as far as I can tell) is :. There are options which allow me to enclose the file paths in double or single quotes, or angle brackets. The program itself accepts the argument of the aforementioned input string, so there must be a way of separating the paths. I just do not have a keen enough eye to see how to do it with sed or awk. At first I thought I'll just use sed to replace every [space]/ with [newline]/ and then trim all but the first line, but that leaves the loophole open for folders whose names end with a space. If I use the comma delimiter, the same happens, just for a comma instead. If I encapsulate in double or single quotation marks, I am opening another can of worms for filenames with those characters. The image/link is the relevant part of my Automator workflow. -- UPDATE -- I was able to achieve what I wanted in a rather roundabout way. It's hardly elegant but here is working generalized code: path="/Users/bobby/diddy dum/ding.mp4 /Users/jimmy/gone mia/come back jimmy.mp3" # using colon because it's an inadmissible Mac OS X # filename character, perfect for separating # also, unlike [space], multiple colons do not collapse IFS=: # replace all spaces with colons colpath=$(echo "$path" | sed 's/ /:/g') # place words from colon-ized file path into array # e.g. three spaces -> three colons -> two empty words j=1 for word in $colpath do filearray[$j]="$word" j=$j+1 done # reconstruct file path word by word # after each addition, check file existence # if non-existent, re-add lost [space] and continue until found name="" for seg in "${filearray[@]}" do name="$name$seg" if [[ -f "$name" ]] then echo "$name" break fi name="$name " done All this trouble because the default IFS doesn't count "emptiness" between the spaces as words, but rather collapses them all.

    Read the article

  • filtering itunes library items by file location

    - by Cawas
    3 answers and unfortunately no solution yet. The Problem I've got way more than 1000 duplicated items in my iTunes Library pointing to a non-existant place (the "where" under "get info" window), along with other duplicated items and other MIAs (Missing In Action). Is there any simple way to just delete all of them and only them? From the library, of course. By that I mean some MIAs are pointing to /Volumes while some are pointing to .../music/Music/... or just .../music/.... I want to delete all pointing to /Volumes as to later I'll recover the rest. Check the image below. Some Background I tried searching for a specific key word on the path and creating smart play list, but with no result. Being able to just sort all library by path would be a perfect solution! I believe old iTunes could do that. PowerTunes can do it (sort by path) but I can't do anything with its list. I would also welcome any program able to handle this, then import and properly export back the iTunes library. Since this seems to just not be clear enough... AppleScript doesn't work That's because AppleScript just can't gather the missing info anywhere in iTunes Library. Maybe we could use AppleScript by opening the XML file, but that's a whole nother issue. Here's a quote from my conversation with Doug the man himself Adams last december: I don't think you do understand. There is no way to get the path to the file of a dead track because iTunes has "forgotten" it. That is, by definition, what a dead track is. Doug On Dec 21, 2010, at 7:08 AM, Caue Rego wrote: yes I understand that and have seem the script. but I'm not looking for the file. just the old broken path reference to it. Sent from my iPhone On 21/12/2010, at 10:00, Doug Adams wrote: You cannot locate missing files of dead tracks because, by definition, a dead track is one that doesn't have any file information. If you look at "Super Remove Dead Tracks", you will notice it looks for tracks that have "missing value" for the location property.

    Read the article

  • Suggestions for splitting server roles amongst Hyper-V virtual servers / RAID6 or RAID10? / AppAssure

    - by Anon
    We have 2 Hyper-V hosts at present running 1 virtual server that was converted from a physical box running all roles. My plan is to split the roles over various virtual machines, upgrading to the latest software versions as I go, and use the backup server as a standby in case the main server fails. AppAssure backup software has a feature called Virtual Standby, so the VHD's can be ready to be fired up on the backup server if necessary. Off-site backups will be done via external USB drive for now. I'm just seeking some input/suggestions into how I'm planning to split the roles out amongst various virtual servers. Also, I'm curious how to setup the storage on the servers. We do not have any NAS's, SAN'S or any budget for this. What would the best RAID level be to use? I'm thinking either RAID6 (which is currently used) however I'm concerned about the write speeds, or RAID10 but again I'm worried that I can only lose 1 drive (from the same mirror) as opposed to any 2 with RAID6. I realise I have a hot swap for this, but what if a further drive fails during a rebuild? Is the write penalty of RAID6 worth the extra reliability over RAID10? Or will it be too slow with all the roles I am planning, therefore RAID10 is my only real option? The reason for the needed redundancy is I am the only technician and I'm not always on-site. Options I've considered: 1) 5 drives in RAID6 set, 200gb for host OS, rest for VM storage. 1 drive for hot swap - this is how it is currently setup 2) 4 drives in RAID10 set, 200gb for host OS, rest for VM storage. 2 drives for hot swap 3) 4 drives in RAID10 set for VM storage, 2 drives in RAID1 set for host OS. No drives for hot swap - While this is probably the best option with the amount of drives I have, I don't like the idea of having no hot swap 4) 3 drives in RAID6 set for VM storage, 2 drives in RAID1 set for host OS. 1 drive for hot swap All options give us enough storage capacity for our files, etc. We don't have any budget for extra drives or extra hot swap HD chassis for the servers. We have about 70 clients and about 150 users. MAIN SERVER Intel Xeon 5520 @ 2.27 GHz (2 processors) 16GB RAM 6 x 1TB Seagate Barracuda ES.2 Enterprise SATA drives Intel SRCSATAWB RAID controller Virtual machine workload using Hyper-V on Windows Server 2008 R2: DC01 - Active Directory Domain Controller / DNS server / Global catalog - 1GB RAM DC02 - Active Directory Domain Controller / DNS server / Global catalog - 1GB RAM Member Server - DHCP server, File server, Print server - 1GB RAM SCCM Member Server - 4GB RAM Third Party Software Member Server - A/V server, Ticketing software, etc - 4GB RAM Exchange 2007 - 4GB RAM - however we are probably migrating to a hosted solution, therefore freeing up resources BACKUP SERVER Intel Xeon E5410 @ 2.33GHz (2 processors) 16GB RAM 6 x 2TB WD RE4 SATA drives Intel SRCSASRB RAID controller Virtual machine workload using Hyper-V on Windows Server 2008 R2: AppAssure backup software - 8GB RAM

    Read the article

  • Recommendations or advice for shared computer control

    - by Telemachus
    Basic scenario: we are a school (overwhelmingly Mac, some Windows machines via BootCamp), and we are considering using DeepFreeze to guard the state of our shared machines. We have roughly 250 machines that are either shared laptops (which move around quite a bit) or common desktops in public spaces. Obviously, we spend a lot of time maintaining the machines and trying to reverse the inevitable drift as people make changes to the computers. We would like to control the integrity of the build we initially put onto the machines without handcuffing users and especially without using Mac's Parental Control software. (We've had nothing but bad experiences with it.) We've been testing DeepFreeze, and so far it's very impressive. But I'm curious to hear if people who have used DeepFreeze or any similar software have any advice or tips. To get things started, I will post my own pros and cons. Pros: The state of the machine is frozen in our chosen state. All changes made to the machine after that disappear upon restart. (This frozen state really appears to cover everything. I have yet to do something to a test machine that isn't instantly healed.) Tons of trivial but time-consuming maintenance is gone in an instant. Also, lots of not-so-trivial breakage should be avoided. There are good options, however, that allow you to create storage spaces either globally or per user. (Otherwise, stored files disappear upon reboot. For some machines, this is a good option itself. Simply warn people: save externally or else; this machine is a kiosk, not your storage space.) Cons: Anytime we actually need to make a change (upgrade basic software, add a printer or an airport permanently, add new software), the process is a bit more complex. Reboot into a special mode (thaw state), make changes, reboot back into frozen mode. If (when?) we forget this, we will end up making changes that disappear after the next reboot. Users will forget to save files correctly (in the right place or externally), and we will have loud, unpleasant conversations explaining that we can't recover the document they worked on all afternoon yesterday. The machine rebooted. The file is gone. These are my initial thoughts, but I would love to hear from other people who have experience with DeepFreeze or any similar software. What should we be careful about? Do the pros outweigh the cons? What gains or problems am I not seeing? Thanks.

    Read the article

  • 2nd Year College - Learning - Microsoft Server Products

    - by Ryan
    As the title says, I just finished my first year of college (majoring in Software Engineering). Fortunately my school likes Microsoft enough, and I can get pretty much anything I want that Microsoft sells. I also can get IBM Websphere and the like for free as well. Earlier this year, I set up an oldish computer (2.6 Pentium D, x64) to run ubuntu server headless. I'm predominately a Java developer, so Apache, Maven, Nexus, Sonar, SVN, etc made it onto the machine. It worked really well for personal and school projects, especially team projects (quick ramp up). Anyways, I started to pick up C# to complement my Java knowledge (don't judge me :P), and am interested in working with some of the associated Microsoft equivalents. The machine currently has the Ubuntu install, as well as Windows 7 Ultimate. I do all of my actual development work off my laptop, also running Windows 7 Ultimate. I was wondering what software you would recommend putting on the machine. I’m not actually serving anything off the machine itself, but in Ubuntu I had it doing integration tests with Hudson on every commit, and profiling my applications, etc, etc. The machine would be running headless, and I would remote into it. Here is what I am currently leaning towards / wondering about: Windows 7 Ultimate vs Windows Server 2008 (R2) (no one is really clear why I should go with one over the other) Windows Team Foundation Sharepoint (Never used it before, kind of meh about it) IBM Websphere or Glassfish (Some Java EE web server) SQL Server 2008 A DVCS In order to better control product conflicts / limit resource use, I’m wondering if I should install things into virtual machines (I can get VmWare or Microsoft Virtualization Products) I also plan on installing everything I had running under Linux (it’s almost entirely Java based development software, so it’ll run on both, only reason I went with ubuntu during the year was because the apache build seemed better). I’m primarily looking to become familiar with enterprise software development tools, as well as get something functional that will help my development process. (IE, I’ll still use project and assign tasks even though I might be the only one to assign tasks to, just to practice doing so). Is there any other software / configuration details I should explore? Opinions on my current list? I primarily use C#, Java, and PHP. I'm familiar with ruby, and python as well. Thanks!

    Read the article

  • "log on as a batch job" user rights removed by what GPO?

    - by LarsH
    I am not much of a server administrator, but get my feet wet when I have to. Right now I'm running some COTS software on a Windows 2008 Server machine. The software installer creates a few user accounts for running its processes, and then gives those users the right to "log on as a batch job". Every so often (e.g. yesterday at 2:52pm and this morning at 7:50am), those rights disappear. The software then stops working. I can verify that the user rights are gone by using secedit /export /cfg e:\temp\uraExp.inf /areas USER_RIGHTS and I have a script that does this every 30 seconds and logs the results with a timestamp, so I know when the rights disappear. What I see from the export is that in the "good" state, i.e. after I install the software and it's working correctly, the line for SeBatchLogonRight from the secedit export includes the user accounts created by the software. But every few hours (sometimes more), those user accounts are removed from that line. The same thing can be seen by using the GUI tool Local Security Policy > Security Settings > Local Policies > User Rights Assignment > Log on as a batch job: in the "good" state, that policy includes the needed user accounts, and in the bad state, the policy does not. Based on the above-mentioned logging script and the timestamps at which the user rights are being removed, I can see clearly that some GPOs are causing the change. The GPO Operational log shows GPOs being processed at exactly the right times. E.g.: Starting Registry Extension Processing. List of applicable GPOs: (Changes were detected.) Local Group Policy I have run GPOs on demand using gpupdate /force, and was able to verify that this caused the User Rights to be removed. We have looked over local group policies till our eyes are crossed, trying to figure out which one might be stripping these User Rights to "log on as a batch job." We have not configured any local group policies on this machine, that we know of; so is there a default local group policy that might typically do such a thing? Are there typical domain policies that would do this? I have been working with our IT staff colleagues to troubleshoot the problem, but none of them are really GPO experts... They wear many hats, and they do what they need to do in order to keep most things running. Any suggestions would be greatly appreciated!

    Read the article

  • Trouble creating FTP in Server 2008

    - by Saariko
    I have been trying to create an FTP server on my new Server 2008. I have been following both (very detailed and highly published here guides) For setting up using IIS Manager http://learn.iis.net/page.aspx/321/configure-ftp-with-iis-7-manager-authentication/ and For anonymous FTP http://www.trainsignaltraining.com/windows-server-2008-ftp-iis7 I am able to log as an anonymous user. My need is to use a named user, so I need to use the IIS Manager. I get error 530 when trying to log as a user. Connected to 127.0.0.1. 220 Microsoft FTP Service User (127.0.0.1:(none)): ftpmanager 331 Password required for ftpmanager. Password: 530-User cannot log in. Win32 error: Logon failure: unknown user name or bad password. Error details: Filename: Error: 530 End Login failed. ftp> I can not learn from this message anything. My password is set to: 1234 (so I don't think I make a mistake here - testing purposes only ofc) Thank you. Note - I went over other posts on SE that I read, and couldn't get the result: IIS7 Windows Server 2008 FTP -> Response: 530 User cannot log in. FTP Error 530, User cannot log in, home directory inaccessible. Having trouble setting up FTP server on Windows Server 2008 EDIT I think I found some errors with the physical path. Going to Basic settings, and Test Connection on the physical path, gave me the following error: The server is configured to use pass-through authentication with a built-in account to access the specified physical path. However, IIS Manager cannot verify whether the built-in account has access. Make sure that the application pool identity has Read access to the physical path. If this server is joined to a domain, and the application pool identity is NetworkService or LocalSystem, verify that \$ has Read access to the physical path. Then test these settings again. I am not sure which/whom should get access to the Root folder !? I want to point out, I managed to login with a domain user (change authorization and authentication methods) but this is NOT the requested solution. I checked to make sure that the FTP, folders, access is working properly. I am bit lost here. ==== More tries: I have enabled another Allow rule for ALL Users. I still get the same error. It seems that it doesn't matter if i use a correct or wrong password, I still get Error 530.

    Read the article

  • Unknown problem causing major computer failure, Booting problem with windows 7, mainly with 0x0000000A

    - by ken
    Where do I begin? OS=Windows 7 I think it all started when I ran an installation file. I suspect it may have been a virus (even though AVG scan didnt pick anything up). The installation failed, computer crashed then restarted. In the middle of the reboot, I get BSOD. Normal boot up doesnt work so I use safe mode. Method 1: Not a problem I thought cos I will do what I normally do and that was to recover from my image file. Unfortunately, my Acronis software cant recover in safe mode. Method 2: I created a bootable disc for the Acronis recovery software. Managed to boot to Acronis and started the recovery from image file. This fail with some error message (did not manage to record). Something to do with not be able to copy to $AVG folder. Method 3: At this stage, assumed it was still a virus causing the problem so decided to format that partition to remove everything and hopefully the virus too. Had a lot of problems trying to bypass the system to allow me to format but (i think- more on this later) I managed to do that. Image was recovered, thought problem was resolved. Tried to boot windows but new error: Boot Manager is missing. Read up on this and managed to copy the Boot Manager from my Laptop's Manufacturer's partition (partition contains factory setup image file). Windows loaded but new BSOD with 0x000000A problem. Method 4: Attempted to reinstall factory settings but this failed cos i suspect by formating the partition, I may have removed the recovery software. Tried to create a bootable dvd of factory setting but machine is so bad it continues to crash. Bootable dvd method failed. Method 5:Spent alot of time reading up on this error, even installed a software to help scan and fix the problem. Scan failed and software required money! Anyway, lots of BSOD with different error message like 0x00000001A and 0x0000000D1. Error message changes with some reboots. Method 6: Found a hotfix from the windows site to fix 0x0000000A problem, great I thought! In safe mode, I cant install the file cos of error:0x8007043c. Tried to then install the fix in normal mode but installation just hangs. Returned to safe mode and followed advice to bypass 0x8007043c by changing the BITS status (read here: http://www.vistaheads.com/forums/microsoft-public-windowsupdate/181931-error-number-0x8007043c-windows-update.html). However, my machine at this time is so flaky that it hangs everytime i right mouse click the computer icon. I am at my wits end. Ya help or ideas? Cheers

    Read the article

  • How to stretch the image from one screen to two screens

    - by wxiiir
    I want to be able to stretch the image from one monitor to a second monitor even if i have to use some software to do it. For example i want the top half of the image that is now shown on my first monitor to occupy the whole second monitor and i want the bottom half to occupy the whole first monitor, or the other way around i don't really care as long as it works. I would be cool to know how to do the same stuff but to the left half and right half. I know that image pixels would have twice the lenght or height this way but i don't really care about it as long as it works so basically i want the stuff to show on both monitors but with the same pixels as before. I have a hd4870 and windows7 and hd4000 family doesnt support having two monitors behaving like a large one, only hd5000 upwards, this would solve my problems without any of the drawbacks but it just can't be done (or maybe it can via software but i'm just too tired of searching). A solution to make almost any graphic card have two monitors behaving like a large one is matrox dualhead2go but that's just as expensive as a good hd5000 card so it's not worth it. thanks in advance EDIT I guess that nobody so far was able to fully comprehend my problem that was very explicitly written but i will elaborate some more. My hd4870 can have 2 monitors working with it but some stuff like games won't run on both monitors, which sucks. There are some ways to circumvent this problem and two of them are perfect or almost perfect but expensive and the third would be a software solution that would make it possible. The first one is to have and hd5000 family video card which will work just fine with both monitors. The second is to have a matrox dualhead2go that will make my hd4870 detect my two monitors as a large monitor. The third is to have a software that makes my two displays be detected as a large display and then captures the output of the video card, splits the images and renders them as 2d images to both monitors OR a simpler one but that would make outputted pixels double the width or height would be to capture the output of the graphics card to one screen, split it in two and enlarge it to fit both monitors and then output it to the monitors. p.s. By capturing the output of the video card i mean just make the video card process the stuff in a certain way. Making the video card detect two monitors as a large one via software may be a bit impossible or impracticable but stretching the output as a 2d image from one to both monitors for some coders should be a walk in the park so it would be likely that such program would exist or that some widespread softwares for dual monitor would have such function in them.

    Read the article

  • OEM sound card with no drivers or support

    - by randy
    I thought my sound card was going out so I bought a sound card online. Everything seemed to work ok, I do have sound. But after a few months, I noticed the extra software that downloaded with the sound card drivers didn't work. I ended up contacting creative and after a month of e-mail support, they asked for the serial number and/or model number. Their reply back was I had purchased an OEM sound card and they could not provide support for that, and informed me that that is why their drivers and software didn't work. They informed me that I had to contact the company that distributed the sound card and install their software. Is there anything I can do to find out who distributed this sound card, or is there anything I can do to get other features to work? I have 4 speakers and a sub but only 2 speakers produce sound. The only control I have is the volume. Creative's driver update program will find my sound card, download updates and even added software, but if I try to click on a downloaded program like Creative's Toolbox or Media Center, I get an error that it cannot find the devise. That is why I contacted creative in the first place. EDIT Thanks for the responses everyone. Here's an update. I thought I'd go thru my old computer stuff for my classes at school. I have a lot of old stuff saved, boxes and cables and stuff. I found the box the sound card came in. It looks like a box you'd buy at the store, like Best Buy or CompUSA. I worked with creative for such a long time, it went past the point of being able to return it to the junk online store this shipped from. The box did have an install CD, so I thought I'd start over to reinstall the drivers and software that shipped with the card. I noticed that the install would uninstall a program, then reinstall it. so I thought things were working out. But no good. Everything still works but the programs were still bad. I'd get an error trying to load them - not found. I'll look on the card the next time I get a chance and see if I can spot any kind of name on it.

    Read the article

  • setsockopt EOPNOTSUPP (Operation not supported)

    - by brant
    When I strace my MySQL process, I keep finding the same error over and over: setsockopt(240, SOL_IP, IP_TOS, [8], 4) = -1 EOPNOTSUPP (Operation not supported) futex(0x87ab944, FUTEX_WAKE_OP_PRIVATE, 1, 1, 0x87ab940, {FUTEX_OP_SET, 0, FUTEX_OP_CMP_GT, 1}) = 1 futex(0x87ab260, FUTEX_WAKE_PRIVATE, 1) = 1 select(13, [10 12], NULL, NULL, NULL) = 1 (in [12]) fcntl64(12, F_SETFL, O_RDWR|O_NONBLOCK) = 0 accept(12, {sa_family=AF_FILE, path="\246\32629iE"...}, [2]) = 803 fcntl64(12, F_SETFL, O_RDWR) = 0 getsockname(803, {sa_family=AF_FILE, path="/var/lib/mysql\1"...}, [28]) = 0 fcntl64(803, F_SETFL, O_RDONLY) = 0 fcntl64(803, F_GETFL) = 0x2 (flags O_RDWR) fcntl64(803, F_SETFL, O_RDWR|O_NONBLOCK) = 0 setsockopt(803, SOL_IP, IP_TOS, [8], 4) = -1 EOPNOTSUPP (Operation not supported) futex(0x87ab944, FUTEX_WAKE_OP_PRIVATE, 1, 1, 0x87ab940, {FUTEX_OP_SET, 0, FUTEX_OP_CMP_GT, 1}) = 1 futex(0x87ab260, FUTEX_WAKE_PRIVATE, 1) = 1 select(13, [10 12], NULL, NULL, NULL) = 1 (in [12]) fcntl64(12, F_SETFL, O_RDWR|O_NONBLOCK) = 0 accept(12, {sa_family=AF_FILE, path="\246\32629iE"...}, [2]) = 240 fcntl64(12, F_SETFL, O_RDWR) = 0 getsockname(240, {sa_family=AF_FILE, path="/var/lib/mysql\1"...}, [28]) = 0 fcntl64(240, F_SETFL, O_RDONLY) = 0 fcntl64(240, F_GETFL) = 0x2 (flags O_RDWR) fcntl64(240, F_SETFL, O_RDWR|O_NONBLOCK) = 0 setsockopt(240, SOL_IP, IP_TOS, [8], 4) = -1 EOPNOTSUPP (Operation not supported) When I look for running mysql processes I don't see anything out of the ordinary. I figured it might be someplace in my code, so I modified .htaccess to spit out a 502 error to prevent it from loading anything. The error still shows up, just less frequently. There have been quite a few threads that talk about this error, but no real answer as to how to solve it. my.conf, as per request: [mysqld] #skip-networking #log-slow-queries #safe-show-database #local-infile = 0 log-slow-queries = /var/log/mysql-slow.log max_connections = 200 query_cache_limit = 128643200 key_buffer_size = 1200144000 low_priority_updates = 1 concurrent_insert = 2 thread_cache_size = 7 query_cache_size = 662144000 table_cache = 1600 table_definition_cache = 1024 long_query_time = 2.5 open_files_limit = 2647 max_connect_errors=999999999

    Read the article

  • "file not found" error while commiting

    - by AntonAL
    I have a working copy, checked out from SVN repository. When i'm trying to commit, i get following error: svn: File not found: revision 57, path '/trunk/path/to/my/file/logo-mini.jpg' I've found this file in the repo and noticed, that it has only one revision - 58. I don't understand, why SVN complains about this file, when it is presented and why it points to revision 57 instead of 58 ? I've also renamed the grand-grand-grand-parent folder of this file. Possible, this is an issue ... Update Detailed error description, that i've got from Cornerstone app (Mac OS X): Description : Could not find the specified file. Suggestion : Check that the path you have specified is correct. Technical Information ===================== Error : V4FileNotFoundError Exception : ZSVNNoSuchEntryException Causal Information ================== Description : Commit failed (details follow): Status : 160013 File : subversion/libsvn_client/commit.c, 867 Description : File not found: revision 57, path '/trunk/assets/themes/base/article-content/images/logo-mini.jpg' Status : 160013 File : subversion/libsvn_fs_fs/tree.c, 663 So, i've renamed "/trunk/assets/themes directory" to "/trunk/assets/skins", while improving project structure. I've tried following: updating /trunk/assets/themes directory cleaning deleting from filesytem and checking out again reverting entire /trunk/assets/themes directory to the HEAD revision. Even this does't helps. Still getting the same error. I've got no results.

    Read the article

  • Cisco AnyConnect on IOS 12.4(20)T

    - by natacado
    There are plenty of tutorials on setting up AnyConnect on an ASA unit, and a handful of links noting that IOS 12.4(15) and later support AnyConnect, but I can't seem to find any good documentation about how to setup AnyConnect on IOS; most tutorials assume you only want a clientless VPN on IOS. the best I've found is this document on Cisco's site, but it's not working for me in practice - see below. This is all on a Cisco 881W: router#show version | include Version Cisco IOS Software, C880 Software (C880DATA-UNIVERSALK9-M), Version 12.4(20)T1, RELEASE SOFTWARE (fc3) ROM: System Bootstrap, Version 12.4(15r)XZ2, RELEASE SOFTWARE (fc1) The old SSL VPN Client seems to install just fine: router#show webvpn install status svc SSLVPN Package SSL-VPN-Client version installed: CISCO STC win2k+ 1.0.0 1,1,4,176 Thu 08/16/2007 12:37:00.43 However, when I install the AnyConnect client, after authenticating it hangs for a while during the self-update process, and stops with an error that the "AnyConnect package unavailable or corrupted." When I try to install the AnyConnect package on the router, I'm told that it's an invalid archive: router(config)#webvpn install svc flash:/webvpn/anyconnect-win-2.3.2016-k9.pkg SSLVPN Package SSL-VPN-Client (seq:2): installed Error: Invalid Archive Does anyone have a good sample on how to get the 2.x AnyConnect clients working with a Cisco device running IOS?

    Read the article

  • AclPermissionsFacet fault install SQL-2008-R2

    - by photo_tom
    While attempting to do an installation repair of SQL-2008R2, I'm failing the pre-check rules. Module that is failing is AclPermissionsFacet - with this message "The SQL Server registry keys from a prior installation cannot be modified. To continue, see SQL Server Setup documentation about how to fix registry keys." In the log file "Detail_GlobalRules.txt", I've been able to find the following error messages - 2010-09-05 07:24:39 Slp: Could not open sub key key HKEY_LOCAL_MACHINE\Software\Microsoft\Microsoft SQL Server\MSSQL10.MSSQLSERVER\MSSearch. 2010-09-05 07:24:39 Slp: Could not open sub key key HKEY_LOCAL_MACHINE\Software\Microsoft\Microsoft SQL Server\MSSQL10.MSSQLSERVER\SQLServerSCP. 2010-09-05 07:24:39 Slp: Could not open sub key key HKEY_LOCAL_MACHINE\Software\Microsoft\Microsoft SQL Server\MSSQL10.MSSQLSERVER\MSSQLServer. 2010-09-05 07:24:39 Slp: Could not open sub key key HKEY_LOCAL_MACHINE\Software\Microsoft\Microsoft SQL Server\MSSQL10.MSSQLSERVER\SQLServerAgent. When I look at these keys in the registry, all of their permissions are blank. My problem is that I cannot find any good information on how to reset these keys. This is on my new home dev and I think during the migration from my previous machine, these settings got corrupted on my new box. In reviewing the web, there doesn't seem to be good infomration. And what there is suggests using subinacl.exe. But after trying it and seeing it is an XP based program, I'm at a loss on how to continue. Configuration - Windows 7/64bit Home Edition, SQL2008R2, 6gb ram. Suggestions? Su

    Read the article

  • Do we need to explicitly pass php.ini's location to php-fpm?

    - by F21
    I am seeing a strange issue where my php.ini is not used if I do not explicitly pass it to php-fpm when starting it. This is the upstart script I am using: start on (filesystem and net-device-up IFACE=lo) stop on runlevel [016] pre-start script mkdir -p /run/php end script expect fork respawn exec /usr/local/php/sbin/php-fpm --fpm-config /etc/php/php-fpm.conf If PHP is started with the above, my php.ini is never used, even though it is in Configuration File (php.ini) Path. This is the relevant part from phpinfo(): Configuration File (php.ini) Path /etc/php/ Loaded Configuration File (none) Scan this dir for additional .ini files (none) Additional .ini files parsed (none) If I modify the last line of the upstart script to point php-fpm to php.ini explicitly: exec /usr/local/php/sbin/php-fpm --fpm-config /etc/php/php-fpm.conf -c /etc/php/php.ini Then we see that the php.ini is loaded: Configuration File (php.ini) Path /etc/php/ Loaded Configuration File /etc/php/php.ini Scan this dir for additional .ini files (none) Additional .ini files parsed (none) Why is this the case? Is this a quirk in php-fpm? Minor update: This also seems to be a problem for php5-fpm installed using apt-get. I did a test install in a Ubuntu Server 12.04 virtual machine by running the following: sudo apt-get install nginx php5-fpm PHP-FPM and nginx were started after installation and everything seemed fine. I then uncommented php's settings in nginx's configuration and placed a test phpinfo() file to inspect PHP's settings. The relevant bits are: Configuration File (php.ini) Path /etc/php5/fpm Loaded Configuration File (none) Scan this dir for additional .ini files /etc/php5/fpm/conf.d Additional .ini files parsed /etc/php5/fpm/conf.d/10-pdo.ini I noted that no php.ini was loaded either. However, if I go to /etc/php5/fpm, I can see that a php.ini exists. I also checked the start up scripts for PHP-FPM and the -c parameter was not used to link the ini file to PHP. This can potentially be confusing for people who would expect php.ini to be loaded automatically by PHP-FPM.

    Read the article

  • SharePoint threw "Unknown SQL Exception 206 occured." Anyone familiar with this?

    - by dalehhirt
    Our SharePoint instance threw the following errors when attempting to access data through a Content Query Tool: 04/02/2010 10:45:06.12 w3wp.exe (0x062C) 0x1734 Windows SharePoint Services Database 5586 Critical Unknown SQL Exception 206 occured. Additional error information from SQL Server is included below. Operand type clash: uniqueidentifier is incompatible with datetime 04/02/2010 10:45:06.25 w3wp.exe (0x062C) 0x1734 Office Server Office Server General 900n Critical A runtime exception was detected. Details follow. Message: Operand type clash: uniqueidentifier is incompatible with datetime Techinal Details: System.Data.SqlClient.SqlException: Operand type clash: uniqueidentifier is incompatible with datetime at System.Data.SqlClient.SqlConnection.OnError(SqlException exception, Boolean breakConnection) at System.Data.SqlClient.SqlInternalConnection.OnError(SqlException exception, Boolean breakConnection) at System.Data.SqlClient.TdsParser.ThrowExceptionAndWarning(TdsParserStateObject stateObj) at System.Data.SqlClient.TdsParser.Run(RunBehavior runBehavior, SqlCommand cmdHandler, SqlDataReader dataStream, BulkCopySimpleResultSet bulkCopyHandler, TdsParserStateObject stateObj) at System.Data.SqlClient.SqlDataReader.ConsumeMetaData(... 04/02/2010 10:45:06.25* w3wp.exe (0x062C) 0x1734 Office Server Office Server General 900n Critical ...) at System.Data.SqlClient.SqlDataReader.get_MetaData() at System.Data.SqlClient.SqlCommand.FinishExecuteReader(SqlDataReader ds, RunBehavior runBehavior, String resetOptionsString) at System.Data.SqlClient.SqlC 04/02/2010 10:45:06.25 w3wp.exe (0x062C) 0x1734 CMS Publishing 8vyd Exception (Watson Reporting Cancelled) System.Data.SqlClient.SqlException: Operand type clash: uniqueidentifier is incompatible with datetime at System.Data.SqlClient.SqlConnection.OnError(SqlException exception, Boolean breakConnection) at System.Data.SqlClient.SqlInternalConnection.OnError(SqlException exception, Boolean breakConnection) at System.Data.SqlClient.TdsParser.ThrowExceptionAndWarning(TdsParserStateObject stateObj) at System.Data.SqlClient.TdsParser.Run(RunBehavior runBehavior, SqlCommand cmdHandler, SqlDataReader dataStream, BulkCopySimpleResultSet bulkCopyHandler, TdsParserStateObject stateObj) at System.Data.SqlClient.SqlDataReader.ConsumeMetaData() at System.Data.SqlClient.SqlDataReader.get_MetaData() at System.Data.SqlClient.SqlCommand.FinishExecuteRead... 04/02/2010 10:45:06.25* w3wp.exe (0x062C) 0x1734 CMS Publishing 8vyd Exception ...er(SqlDataReader ds, RunBehavior runBehavior, String resetOptionsString) at System.Data.SqlClient.SqlCommand.RunExecuteReaderTds(CommandBehavior cmdBehavior, RunBehavior runBehavior, Boolean returnStream, Boolean async) at System.Data.SqlClient.SqlCommand.RunExecuteReader(CommandBehavior cmdBehavior, RunBehavior runBehavior, Boolean returnStream, String method, DbAsyncResult result) at System.Data.SqlClient.SqlCommand.RunExecuteReader(CommandBehavior cmdBehavior, RunBehavior runBehavior, Boolean returnStream, String method) at System.Data.SqlClient.SqlCommand.ExecuteReader(CommandBehavior behavior, String method) at System.Data.SqlClient.SqlCommand.ExecuteReader(CommandBehavior behavior) at Microsoft.SharePoint.Utilities.SqlSession.ExecuteReader(SqlCommand command, ... 04/02/2010 10:45:06.25* w3wp.exe (0x062C) 0x1734 CMS Publishing 8vyd Exception ...CommandBehavior behavior) at Microsoft.SharePoint.SPSqlClient.ExecuteQuery(Boolean& bSucceed) at Microsoft.SharePoint.Library.SPRequestInternalClass.CrossListQuery(String bstrUrl, String bstrXmlWebs, String bstrXmlLists, String bstrXmlQuery, ISP2DSafeArrayWriter pCallback, Object& pvarColumns) at Microsoft.SharePoint.Library.SPRequest.CrossListQuery(String bstrUrl, String bstrXmlWebs, String bstrXmlLists, String bstrXmlQuery, ISP2DSafeArrayWriter pCallback, Object& pvarColumns) at Microsoft.SharePoint.SPWeb.GetSiteData(SPSiteDataQuery query) at Microsoft.SharePoint.Publishing.CachedArea.GetCrossListQuery(SPSiteDataQuery query, SPWeb currentContext) at Microsoft.SharePoint.Publishing.CrossListQueryCache.GetSiteData(CachedArea cachedArea, SPWeb web, SPSiteDataQuery qu... 04/02/2010 10:45:06.25* w3wp.exe (0x062C) 0x1734 CMS Publishing 8vyd Exception ...ery) 04/02/2010 10:45:06.25 w3wp.exe (0x062C) 0x1734 CMS Publishing 78ed Warning Error occured while processing a Content Query Web Part. Performing the following query ' 04/02/2010 10:45:06.25* w3wp.exe (0x062C) 0x1734 CMS Publishing 78ed Warning ...ue" Type="Number"/ The farm is MOSS 2007 with SQL Server 2005 backend. Any ideas are welcomed. Dale

    Read the article

  • Outlook close to tray

    - by David Lay
    Ok, I'm stuck using outlook in the office (but they let me use 2010 betas which are awsome, btw) and one thing I'll allways rant about outlook in any version is that when I press the X button it goes away. I mean, I know the X button is supposed to close the app, it's the standard and all that, but email is (sadly) very critical, as well as meeting requests and reminders, outlook should not be closed so freaking easily. I mean, Live Messenger is not so critical but it has this feature built in and on by default. Is there a way to close outlook to the tray, addons, vba, settings, reghack, anything? I know there is minimize to tray and I've been searching the web but could not find anything usefull.

    Read the article

  • How do you host multiple public facing websites on a VPS?

    - by pedroarvy
    We host about 30 websites using typical shared hosting plans using ASP.NET and SQL 2000/2005/2008. I am now wondering about hosting all of these websites using our own virtual private server. This is clearly cheaper but comes with a lot of questions I need answers to: Is the risk of having to keep this VPS server up and running worth it? Until now, the host provider has managed the server and we have not had to worry about crashes, downtime, software patches etc. We are not server administrators, we are programmers, so this is not really our expertise. On the other hand, it may not be hard to learn. When we make a website live, we log in to a domain management control panel and change the primary and secondary name servers to point to our shared web host: Eg ns1.sharedwebhost.com and ns2.sharedwebhost.com These name servers are going to have to change when we have a VPS. I don’t understand anything about how to set this up. Is there some useful info anyone could direct me to? Or is there software we need to install to make the primary and secondary name servers work on our VPS? The control panel we have for shared hosting comes with DNS management like this: http://www.yart.com.au/stackoverflow/dns.png What software would I need to install to create this for each site we host at a VPS? The control panel we have for shared hosting also comes with a POP email interface that allows email addresses to be added easily by our customers. Is this something that can be easily set up at a VPS so clients can manage their own email addresses? Is there software we need to install to make this work?

    Read the article

  • Blue screen of death while installing any Adobe Air application

    - by Gaurav Sharma
    Whenever I try to install an Air application I get a Blue Screen and then my system restarts. I cannot even take a screenshot of it. This happens with every air application I try to install. I also searched for the same on Adobe forums and found the same problem being faced by someone else. His problem was resolved by uninstalling a software named "Folder Lock". I searched my hard disk for this software and found one, so I deleted that software (shift+delete) and removed all it's traces from registry too but that still doesn't solved the problem. I also tried disabling the antivirus software and then install the air application but this also didn't helped. Here is the screenshot of the BSOD. I was able to install air applications earlier, but now I can't. Anybody having same sort of problem. One colleague of mine is also having the same problem. Please help me out. My system's config is as follows: Windows XP Home sp3 Flash Builder 4, with SDK 4.1, 3.5 installed in it. Adobe Air v 2.5 1.5 GB RAM 1.66 MHz processor Thanks

    Read the article

< Previous Page | 343 344 345 346 347 348 349 350 351 352 353 354  | Next Page >