Search Results

Search found 12423 results on 497 pages for 'get proactive customer adoption team'.

Page 41/497 | < Previous Page | 37 38 39 40 41 42 43 44 45 46 47 48  | Next Page >

  • What would be the most efficient use of e-mail addresses for ecommerce

    - by user18323
    I am not sure if this is exactly the right section. What do you find the most efficient, clear and reachable use of e-mail addresses to use for the customer? I thought a standard 'sales, 'support' might work but it might look a little samey. Do users respond well when e-mails are replied by staff with named e-mail addresses such as [email protected] or a generic one? I am currently developing a small scale ecommerce website to gain some hands on insight into web retail. Any additional advice would be brilliant.

    Read the article

  • Help me come up with my new job title

    - by Seva Alekseyev
    Hi all, I used to be a technical lead in a group of 3-5 programmers. Tech lead's responsibilities here would include thinking of/designing overall solution architecture, coding, refactoring, being the first to dive into the next big thing, reviewing others' code, sitting on customer meetings and answering endless questions from the rest of the team. Now I'm moving on to a branch-level position (in a branch of ~60 people), which entails pretty much the same, sans maybe the coding/refactoring part. Still kinda a tech lead, but the title "tech lead" is already being used and means something else - a group-level tech lead. Please help me come up with a good job title. I need something for my e-mail signature and, eventually, resume.

    Read the article

  • TFS 2010 Basic Concepts

    - by jehan
    v\:* {behavior:url(#default#VML);} o\:* {behavior:url(#default#VML);} w\:* {behavior:url(#default#VML);} .shape {behavior:url(#default#VML);} Normal 0 false false false false EN-US X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} Here, I’m going to discuss some key Architectural changes and concepts that have taken place in TFS 2010 when compared to TFS 2008. In TFS 2010 Installation, First you need to do the Installation and then you have to configure the Installation Feature from the available features. This is bit similar to SharePoint Installation, where you will first do the Installation and then configure the SharePoint Farms. 1) Installation Features available in TFS2010: a) Basic: It is the most compact TFS installation possible. It will install and configure Source Control, Work Item tracking and Build Services only. (SharePoint and Reporting Integration will not be possible). b) Standard Single Server: This is suitable for Single Server deployment of TFS. It will install and configure Windows SharePoint Services for you and will use the default instance of SQL Server. c) Advanced: It is suitable, if you want use Remote Servers for SQL Server Databases, SharePoint Products and Technologies and SQL Server Reporting Services. d) Application Tier Only: If you want to configure high availability for Team Foundation Server in a Load Balanced Environment (NLB) or you want to move Team Foundation Server from one server to other or you want to restore TFS. e) Upgrade: If you want to upgrade from a prior version of TFS. Note: One more important thing to know here about  TFS 2010 Basic is that,  it can be installed on Client Operations Systems(Windows 7 and Windows Vista SP3), Where as  earlier you cannot Install previous version of TFS (2008 and 2005) on client OS. 2) Team Project Collections: Connect to TFS dialog box in TFS 2008:  In TFS 2008, the TFS Server contains a set of Team Projects and each project may or may not be independent of other projects and every checkin gets a ever increasing  changeset ID  irrespective of the team project in which it is checked in and the same applies to work items  also, who also gets unique Work Item Ids.The main problem with this approach was that there are certain things which were impossible to do; those were required as per the Application Development Process. a)      If something has gone wrong in one team project and now you want to restore it back to earlier state where it was working properly then it requires you to restore the Database of Team Foundation Server from the backup you have taken as per your Maintenance plans and because of this the other team projects may lose out on the work which is not backed up. b)       Your company had a merge with some other company and now you have two TFS servers. One TFS Server which you are working on and other TFS server which other company was working and now after the merge you want to integrate the team projects from two TFS servers into one, which is almost impossible to achieve in TFS 2008. Though you can create the Team Projects in one server manually (In Source Control) which you want to integrate from the other TFS Server, but will lose out on History of Change Sets and Work items and others which are very important. There were few more issues of this sort, which were difficult to resolve in TFS 2008. To resolve issues related to above kind of scenarios which were mainly related TFS Maintenance, Integration, migration and Security,  Microsoft has come up with Team Project Collections concept in TFS 2010.This concept is similar to SharePoint Site Collections and if you are familiar with SharePoint Architecture, then it will help you to understand TFS 2010 Architecture easily. Connect to TFS dialog box in TFS 2010: In above dialog box as you can see there are two Team Project Collections, each team project can contain any number of team projects as you can see on right side it shows the two Team Projects in Team Project Collection (Default Collection) which I have chosen. Note: You can connect to only one Team project Collection at a time using an instance of  TFS Team Explorer. How does it work? To introduce Team Project Collections, changes have been done in reorganization of TFS databases. TFS 2008 was composed of 5-7 databases partitioned by subsystem (each for Version Control, Work Item Tracking, Build, Integration, Project Management...) New TFS 2010 database architecture: TFS_Config: It’s the root database and it contains centralized TFS configuration data, including the list of all team projects exist in TFS server. TFS_Warehouse: The data warehouse contains all the reporting data of served by this server (farm). TFS_* : This contains individual team project collection data. This database contains all the operational data of team project collection regardless of subsystem.In additional to this, you will have databases for SharePoint and Report Server. 3) TFS Farms:  As TFS 2010 is more flexible to configure as multiple Application tiers and multiple Database tiers, so it will be more appropriate to call as TFS Farm if you going for multi server installation of TFS. NLB support for TFS application tiers – With TFS 2010: you can configure multiple TFS application tier machines to serve the same set of Team Project Collections. The primary purpose of NLB support is to enable a cleaner and more complete high availability than in TFS 2008. Even if any application tier in the farm fails then farm will automatically continue to work with hardly any indication to end users of a problem. SQL data tiers: With 2010 you can configure many SQL Servers. Each Database can be configured to be on any SQL Server because each Team Project Collection is an independent database. This feature can also be used to load balance databases across SQL Servers.These new capabilities will significantly change the way enterprises manage their TFS installations in the future. With Team Project Collections and TFS farms, you can create a single, arbitrarily large TFS installation. You can grow it incrementally by adding ATs and SQL Servers as needed.

    Read the article

  • Project Management Helps AmeriCares Deliver International Aid

    - by Sylvie MacKenzie, PMP
    Excerpt from PROFIT - ORACLE - by Alison Weiss Handle with Care Sound project management helps AmeriCares bring international aid to those in need. The stakes are always high for AmeriCares. On a mission to restore health and save lives during times of disaster, the nonprofit international relief and humanitarian aid organization delivers donated medicines, medical supplies, and humanitarian aid to people in the U.S. and around the globe. Founded in 1982 with the express mission of responding as quickly and efficiently as possible to help people in need, the Stamford, Connecticut-based AmeriCares has delivered more than US$10.5 billion in aid to 147 countries over the past three decades. Launch the Slideshow “It’s critically important to us that we steward all the donations and that the medical supplies and medicines get to people as quickly as possible with no loss,” says Kate Sears, senior vice president for finance and technology at AmeriCares. “Whether we’re shipping IV solutions to victims of cholera in Haiti or antibiotics to Somali famine victims, we need to get the medicines there sooner because it means more people will be helped and lives improved or even saved.” Ten years ago, the tracking systems used by AmeriCares associates were paper-based. In recent years, staff started using spreadsheets, but the tracking processes were not standardized between teams. “Every team was tracking completely different information,” says Megan McDermott, senior associate, Sub-Saharan Africa partnerships, at AmeriCares. “It was just a few key things. For example, we tracked the date a shipment was supposed to arrive and the date we got reports from our partner that a hospital received aid on their end.” While the data was accurate, much detail was being lost in the process. AmeriCares management knew it could do a better job of tracking this enterprise data and in 2011 took a significant step by implementing Oracle’s Primavera P6 Professional Project Management. “It’s a comprehensive solution that has helped us improve the monitoring and controlling processes. It has allowed us to do our distribution better,” says Sears. In addition, the implementation effort has been a change agent, helping AmeriCares leadership rethink project management across the entire organization. Initially, much of the focus was on standardizing processes, but staff members also learned the importance of thinking proactively to prevent possible problems and evaluating results to determine if goals and objectives are truly being met. Such data about process efficiency and overall results is critical not only to AmeriCares staff but also to the donors supporting the organization’s life-saving missions. Efficiency Saves Lives One of AmeriCares’ core operations is to gather product donations from the private sector, establish where the most-urgent needs are, and solicit monetary support to send the aid via ocean cargo or airlift to welfare- and health-oriented nongovernmental organizations, hospitals, health networks, and government ministries based in areas in need. In 2011 alone, AmeriCares sent more than 3,500 shipments to 95 countries in response to both ongoing humanitarian needs and more than two dozen emergencies, including deadly tornadoes and storms in the U.S. and the devastating tsunami in Japan. When it comes to nonprofits in general, donors want to know that the charitable organizations they support are using funds wisely. Typically, nonprofits are evaluated by donors in terms of efficiency, an area where AmeriCares has an excellent reputation: 98 percent of expenses go directly to supporting programs and less than 2 percent represent administrative and fundraising costs. Donors, however, should look at more than simple efficiency, says Peter York, senior partner and chief research and learning officer at TCC Group, a nonprofit consultancy headquartered in New York, New York. They should also look at whether organizations have the systems in place to sustain their missions and continue to thrive. An expert on nonprofit organizational management, York has spent years studying sustainable charitable organizations. He defines them as nonprofits that are able to achieve the ongoing financial support to stay relevant and continue doing core mission work. In his analysis of well over 2,500 larger nonprofits, York has found that many are not sustaining, and are actually scaling back in size. “One of the biggest challenges of nonprofit sustainability is the general public’s perception that every dollar donated has to go only to the delivery of service,” says York. “What our data shows is that there are some fundamental capacities that have to be there in order for organizations to sustain and grow.” York’s research highlights the importance of data-driven leadership at successful nonprofits. “You’ve got to have the tools, the systems, and the technologies to get objective information on what you do, the people you serve, and the results you’re achieving,” says York. “If leaders don’t have the knowledge and the data, they can’t make the strategic decisions about programs to take organizations to the next level.” Historically, AmeriCares associates have used time-tested and cost-effective strategies to ship and then track supplies from donation to delivery to their destinations in designated time frames. When disaster strikes, AmeriCares ships by air and generally pulls out all the stops to deliver the most urgently needed aid within the first few days and weeks. Then, as situations stabilize, AmeriCares turns to delivering sea containers for the postemergency and ongoing aid so often needed over the long term. According to McDermott, getting a shipment out the door is fairly complicated, requiring as many as five different AmeriCares teams collaborating together. The entire process can take months—from when products are received in the warehouse and deciding which recipients to allocate supplies to, to getting customs and governmental approvals in place, actually shipping products, and finally ensuring that the products are received in-country. Delivering that aid is no small affair. “Our volume exceeds half a billion dollars a year worth of donated medicines and medical supplies, so it’s a sizable logistical operation to bring these products in and get them out to the right place quickly to have the most impact,” says Sears. “We really pride ourselves on our controls and efficiencies.” Adding to that complexity is the fact that the longer it takes to deliver aid, the more dire the human need can be. Any time AmeriCares associates can shave off the complicated aid delivery process can translate into lives saved. “It’s really being able to track information consistently that will help us to see where are the bottlenecks and where can we work on improving our processes,” says McDermott. Setting a Standard Productivity and information management improvements were key objectives for AmeriCares when staff began the process of implementing Oracle’s Primavera solution. But before configuring the software, the staff needed to take the time to analyze the systems already in place. According to Greg Loop, manager of database systems at AmeriCares, the organization received guidance from several consultants, including Rich D’Addario, consulting project manager in the Primavera Global Business Unit at Oracle, who was instrumental in shepherding the critical requirements-gathering phase. D’Addario encouraged staff to begin documenting shipping processes by considering the order in which activities occur and which ones are dependent on others to get accomplished. This exercise helped everyone realize that to be more efficient, they needed to keep track of shipments in a more standard way. “The staff didn’t recognize formal project management methodology,” says D’Addario. “But they did understand what the most important things are and that if they go wrong, an entire project can go off course.” Before, if a boatload of supplies was being sent to Haiti and there was a problem somewhere, a lot of time was taken up finding out where the problem was—because staff was not tracking things in a standard way. As a result, even more time was needed to find possible solutions to the problem and alert recipients that the aid might be delayed. “For everyone to put on the project manager hat and standardize the way every single thing is done means that now the whole organization is on the same page as to what needs to occur from the time a hurricane hits Haiti and when a boat pulls in to unload supplies,” says D’Addario. With so much care taken to put a process foundation firmly in place, configuring the Primavera solution was actually quite simple. Specific templates were set up for different types of shipments, and dashboards were implemented to provide executives with clear overviews of every project in the system. AmeriCares’ Loop reports that system planning, refining, and testing, followed by writing up documentation and training, took approximately four months. The system went live in spring 2011 at AmeriCares’ Connecticut headquarters. While the nonprofit has an international presence, with warehouses in Europe and offices in Haiti, India, Japan, and Sri Lanka, most donated medicines come from U.S. entities and are shipped from the U.S. out to the rest of the world. In addition, all shipments are tracked from the U.S. office. AmeriCares doesn’t expect the Primavera system to take months off the shipping time, especially for sea containers. However, any time saved is still important because it will allow aid to be delivered to people more quickly at a lower overall cost. “If we can trim a day or two here or there, that can translate into lives that we’re saving, especially in emergency situations,” says Sears. A Cultural Change Beyond the measurable benefits that come with IT-driven process improvement, AmeriCares management is seeing a change in culture as a result of the Primavera project. One change has been treating every shipment of aid as a project, and everyone involved with facilitating shipments as a project manager. “This is a revolutionary concept for us,” says McDermott. “Before, we were used to thinking we were doing logistics—getting a container from point A to point B without looking at it as one project and really understanding what it meant to manage it.” AmeriCares staff is also happy to report that collaboration within the organization is much more efficient. When someone creates a shipment in the Primavera system, the same shared template is used, which means anyone can log in to the system to see the status of a shipment. Knowledgeable staff can access a shipment project to help troubleshoot a problem. Management can easily check the status of projects across the organization. “Dashboards are really useful,” says McDermott. “Instead of going into the details of each project, you can just see the high-level real-time information at a glance.” The new system is helping team members focus on proactively managing shipments rather than simply reacting when problems occur. For example, when a container is shipped, documents must be included for customs clearance. Now, the shipping template has built-in reminders to prompt team members to ask for copies of these documents from freight forwarders and to follow up with partners to discover if a shipment is on time. In the past, staff may not have worked on securing these documents until they’d been notified a shipment had arrived in-country. Another benefit of capturing and adopting best practices within the Primavera system is that staff training is easier. “Capturing the processes in documented steps and milestones allows us to teach new staff members how to do their jobs faster,” says Sears. “It provides them with the knowledge of their predecessors so they don’t have to keep reinventing the wheel.” With the Primavera system already generating positive results, management is eager to take advantage of advanced capabilities. Loop is working on integrating the company’s proprietary inventory management system with the Primavera system so that when logistics or warehousing operators input data, the information will automatically go into the Primavera system. In the past, this information had to be manually keyed into spreadsheets, often leading to errors. Mining Historical Data Another feature on the horizon for AmeriCares is utilizing Primavera P6 Professional Project Management reporting capabilities. As the system begins to include more historical data, management soon will be able to draw on this information to conduct analysis that has not been possible before and create customized reports. For example, at the beginning of the shipment process, staff will be able to use historical data to more accurately estimate how long the approval process should take for a particular country. This could help ensure that food and medicine with limited shelf lives do not get stuck in customs or used beyond their expiration dates. The historical data in the Primavera system will also help AmeriCares with better planning year to year. The nonprofit’s staff has always put together a plan at the beginning of the year, but this has been very challenging simply because it is impossible to predict disasters. Now, management will be able to look at historical data and see trends and statistics as they set current objectives and prepare for future need. In addition, this historical data will provide AmeriCares management with the ability to review year-end data and compare actual project results with goals set at the beginning of the year—to see if desired outcomes were achieved and if there are areas that need improvement. It’s this type of information that is so valuable to donors. And, according to York, project management software can play a critical role in generating the data to help nonprofits sustain and grow. “It is important to invest in systems to help replicate, expand, and deliver services,” says York. “Project management software can help because it encourages nonprofits to examine program or service changes and how to manage moving forward.” Sears believes that AmeriCares donors will support the return on investment the organization will achieve with the Primavera solution. “It won’t be financial returns, but rather how many more people we can help for a given dollar or how much more quickly we can respond to a need,” says Sears. “I think donors are receptive to such arguments.” And for AmeriCares, it is all about the future and increasing results. The project management environment currently may be quite simple, but IT staff plans to expand the complexity and functionality as the organization grows in its knowledge of project management and the goals it wants to achieve. “As we use the system over time, we’ll continue to refine our best practices and accumulate more data,” says Sears. “It will advance our ability to make better data-driven decisions.”

    Read the article

  • BeansBinding Across Modules in a NetBeans Platform Application

    - by Geertjan
    Here's two TopComponents, each in a different NetBeans module. Let's use BeansBinding to synchronize the JTextField in TC2TopComponent with the data published by TC1TopComponent and received in TC2TopComponent by listening to the Lookup. The key to getting to the solution is to have the following in TC2TopComponent, which implements LookupListener: private BindingGroup bindingGroup = null; private AutoBinding binding = null; @Override public void resultChanged(LookupEvent le) { if (bindingGroup != null && binding != null) { bindingGroup.getBinding("customerNameBinding").unbind(); } if (!result.allInstances().isEmpty()){ Customer c = result.allInstances().iterator().next(); // put the customer into the lookup of this topcomponent, // so that it will remain in the lookup when focus changes // to this topcomponent: ic.set(Collections.singleton(c), null); bindingGroup = new BindingGroup(); binding = Bindings.createAutoBinding( // a two-way binding, i.e., a change in // one will cause a change in the other: AutoBinding.UpdateStrategy.READ_WRITE, // source: c, BeanProperty.create("name"), // target: jTextField1, BeanProperty.create("text"), // binding name: "customerNameBinding"); bindingGroup.addBinding(binding); bindingGroup.bind(); } } I must say that this solution is preferable over what I've been doing prior to getting to this solution: I would get the customer from the resultChanged, set a class-level field to that customer, add a document listener (or action listener, which is invoked when Enter is pressed) on the text field and, when a change is detected, set the new value on the customer. All that is not needed with the above bit of code. Then, in the node, make sure to use canRename, setName, and getDisplayName, so that when the user presses F2 on a node, the display name can be changed. In other words, when the user types something different in the node display name after pressing F2, the underlying customer name is changed, which happens, in the first place, because the customer name is bound to the text field's value, so that the text field's value will also change once enter is pressed on the changed node display name. Also set a PropertyChangeListener on the node (which implies you need to add property change support to the customer object), so that when the customer object changes (which happens, in the second place, via a change in the value of the text field, as defined in the binding defined above), the node display name is updated. In other words, there's still a bit of plumbing you need to include. But less than before and the nasty class-level field for storing the customer in the TC2TopComponent is no longer needed. And a listener on the text field, with a property change listener implented on the TC2TopComponent, isn't needed either. On the other hand, it's more code than I was using before and I've had to include the BeansBinding JAR, which adds a bit of overhead to my application, without much additional functionality over what I was doing originally. I'd lean towards not doing things this way. Seems quite expensive for essentially replacing a listener on a text field and a property change listener implemented on the TC2TopComponent for being notified of changes to the customer so that the text field can be updated. On the other other hand, it's kind of nice that all this listening-related code is centralized in one place now. So, here's a nice improvement over the above. Instead of listening for a customer, listen for a node, from which the customer can be obtained. Then, bind the node display name to the text field's value, so that when the user types in the text field, the node display name is updated. That saves you from having to listen in the node for changes to the customer's name. In addition to that binding, keep the previous binding, because the previous binding connects the customer name to the text field, so that when the customer display name is changed via F2 on the node, the text field will be updated. private BindingGroup bindingGroup = null; private AutoBinding nodeUpdateBinding; private AutoBinding textFieldUpdateBinding; @Override public void resultChanged(LookupEvent le) { if (bindingGroup != null && textFieldUpdateBinding != null) { bindingGroup.getBinding("textFieldUpdateBinding").unbind(); } if (bindingGroup != null && nodeUpdateBinding != null) { bindingGroup.getBinding("nodeUpdateBinding").unbind(); } if (!result.allInstances().isEmpty()) { Node n = result.allInstances().iterator().next(); Customer c = n.getLookup().lookup(Customer.class); ic.set(Collections.singleton(n), null); bindingGroup = new BindingGroup(); nodeUpdateBinding = Bindings.createAutoBinding( AutoBinding.UpdateStrategy.READ_WRITE, n, BeanProperty.create("name"), jTextField1, BeanProperty.create("text"), "nodeUpdateBinding"); bindingGroup.addBinding(nodeUpdateBinding); textFieldUpdateBinding = Bindings.createAutoBinding( AutoBinding.UpdateStrategy.READ_WRITE, c, BeanProperty.create("name"), jTextField1, BeanProperty.create("text"), "textFieldUpdateBinding"); bindingGroup.addBinding(textFieldUpdateBinding); bindingGroup.bind(); } } Now my node has no property change listener, while the customer has no property change support. As in the first bit of code, the text field doesn't have a listener either. All that listening is taken care of by the BeansBinding code.  Thanks to Toni for help with this, though he can't be blamed for anything that is wrong with it, only thanked for anything that is right with it. 

    Read the article

  • Programmatically use a server as the Build Server for multiple Project Collections

    Important: With this post you create an unsupported scenario by Microsoft. It will break your support for this server with Microsoft. So handle with care. I am the administrator an a TFS environment with a lot of Project Collections. In the supported configuration of Microsoft 2010 you need one Build Controller per Project Collection, and it is not supported to have multiple Build Controllers installed. Jim Lamb created a post how you can modify your system to change this behaviour. But since I have so many Project Collections, I automated this with the API of TFS. When you install a new build server via the UI, you do the following steps Register the build service (with this you hook the windows server into the build server environment) Add a new build controller Add a new build agent So in pseudo code, the code would look like foreach (projectCollection in GetAllProjectCollections) {       CreateNewWindowsService();       RegisterService();       AddNewController();       AddNewAgent(); } The following code fragements show you the most important parts of the method implementations. Attached is the full project. CreateNewWindowsService We create a new windows service with the SC command via the Diagnostics.Process class:             var pi = new ProcessStartInfo("sc.exe")                         {                             Arguments =                                 string.Format(                                     "create \"{0}\" start= auto binpath= \"C:\\Program Files\\Microsoft Team Foundation Server 2010\\Tools\\TfsBuildServiceHost.exe              /NamedInstance:{0}\" DisplayName= \"Visual Studio Team Foundation Build Service Host ({1})\"",                                     serviceHostName, tpcName)                         };            Process.Start(pi);             pi.Arguments = string.Format("failure {0} reset= 86400 actions= restart/60000", serviceHostName);            Process.Start(pi); RegisterService The trick in this method is that we set the NamedInstance static property. This property is Internal, so we need to set it through reflection. To get information on these you need nice Microsoft friends and the .Net reflector .             // Indicate which build service host instance we are using            typeof(BuildServiceHostUtilities).Assembly.GetType("Microsoft.TeamFoundation.Build.Config.BuildServiceHostProcess").InvokeMember("NamedInstance",              System.Reflection.BindingFlags.NonPublic | System.Reflection.BindingFlags.SetProperty | System.Reflection.BindingFlags.Static, null, null, new object[] { serviceName });             // Create the build service host            serviceHost = buildServer.CreateBuildServiceHost(serviceName, endPoint);            serviceHost.Save();             // Register the build service host            BuildServiceHostUtilities.Register(serviceHost, user, password); AddNewController and AddNewAgent Once you have the BuildServerHost, the rest is pretty straightforward. There are methods on the BuildServerHost to modify the controllers and the agents                 controller = serviceHost.CreateBuildController(controllerName);                 agent = controller.ServiceHost.CreateBuildAgent(agentName, buildDirectory, controller);                controller.AddBuildAgent(agent); You have now seen the highlights of the application. If you need it and want to have sample information when you work in this area, download the app TFS2010_RegisterBuildServerToTPCs

    Read the article

  • La "taxe Google" reportée pour un délai d'au moins six mois, malgré son adoption lundi par la commission mixte paritaire

    La "taxe Google" reportée pour un délai d'au moins six mois, malgré son adoption lundi par la commission mixte paritaire Mise à jour du 15.12.2010 par Katleen Lundi soir, la "taxe Google" a été adoptée par la Commission Mixte Paritaire (composée de 7 sénateurs et 7 députés), qui l'a un peu remodelée en favorisant le texte du Sénat plutôt que celui de l'Assemblée. Ceci a crée un fort mouvement de contestation auprès des professionnels français de la publicité en ligne, qui seront les premiers touchés et directement ponctionnés par cet impôt spécifique. « Une telle taxe ferait mécaniquement baisser les recettes des acteurs français installés en France et retarderait ...

    Read the article

  • What happens with project backlog if sprint due date is missed?

    - by nikita
    Suppose that I have project backlog item with effort of 40 hours. My sprint is 40 hours (1 week) and I have one developer in team. So developer creates child task to pending backlog and estimates work to 40 hours. At the end of the sprint developer didn't succeed in resolving his task. Suppose that developer works only and only 40 hours per week. On the next week there would be new backlog items and new sprint. What should I do with backlog item and velocity graph? Obviously backlog item is not resolved on that sprint. Should I estimate the remaining work and subtract it from effort , so that now I see that our velocity is, say, 38hr per 40hr sprint?

    Read the article

  • Should a domain expert make class diagrams?

    - by Matthieu
    The domain expert in our team uses UML class diagrams to model the domain model. As a result, the class diagrams are more of technical models rather than domain models (it serves of some sort of technical specifications for developpers because they don't have to do any conception, they just have to implement the model). In the end, the domain expert ends up doing the job of the architect/technical expert right? Is it normal for a domain expert (not a developer or technical profile) to do class diagrams? If not, what kind of modeling should he be using?

    Read the article

  • Are programmers tied to their code?

    - by Jason
    Assuming you are working for a company or in a team of developers, is the code bound to the person who did it? When someone develops a particular functionnality or an area of the application, is this person the only one who can, is allowed or is just able to make changes to it? I personnally think that a well-done piece of code or program should be easily modified by any programmers, but what about what you see in your environment? At my work, I'd say that the majority of the code can be modified by anyone (that's what coding standards are for right?). There are some things though that are 'property' of some coworkers like the module that handles the pay or some important functionality of the production module (we are developing an ERP system). What about your work place? Am I the only one living this?

    Read the article

  • TFS: Work Items values from External Databases

    - by javarg
    A common question in TFS forums is how to populate list items from external sources in Work Items. Well, there is not a specific functionality to integrate Work Items with external databases or systems when designing them. Actually, you will need to associate your Work Items fields with Global Lists and then have some automated process update this global list regularly. Download this ImportGlobalList.zip file. I’ve put together a simple class (TfsGlobalList) that you can use to update global list items from a .NET application. You could for example, create a simple Console App and schedule it using Windows Scheduler. This App would query a database and then update a TFS Global List using the provided code. Note: the provided code must be run under an account with modify Global List permissions in TFS. Note: remember to refresh Team Explorer in order to see updates in Work Item field values. Enjoy!  

    Read the article

  • Is listing developer's full names in splash screen or about box still a widely spread and desirable practice?

    - by Pierre 303
    Just like in the closing credits of movies, some software vendors list the full names of the team that worked on the piece of software you are using. They are usually displayed in the splash screen (Photoshop) ... or in the about box (Traktor). In the demoscene, it is a mandatory practice, like in the movie industry. How do you see that in your own software? Is there any reason why not doing it? Is there any reason encouraging companies to do it?

    Read the article

  • Are developers expected to have skills of business analysts?

    - by T. Webster
    Our business analyst has left the team. We are now expected to do the work which was previously done by the business analyst, and the management thinks that a task which is done in three months by a business analyst can be done in one month by a developer. My experience is in programming only, and I'm not familiar to the business intelligence tools. To me this seems like maybe an unfair comparison or expectation, and might even trivialize the role of a business analyst. Has anyone else encountered this situation? How to deal with it?

    Read the article

  • Is hierarchical product backlog a good idea in TFS 2012-2013?

    - by Matías Fidemraizer
    I'd like to validate I'm not in the wrong way. My team project is using Visual Studio Scrum 2.x. Since each area/product has a lot of kind of requirements (security, user interface, HTTP/REST services...), I tried to manage this creating "parent backlogs" which are "open forever" and they contain generic requirements. Those parent backlogs have other "open forever" backlogs, and/or sprint backlogs. For example: HTTP/REST Services (forever) ___ Profiles API (forever) ________ POST profile (forever) _______________ We need a basic HTTP/REST profiles' API to register new user profiles (sprint backlog) Is it the right way of organizing the product backlog? Note: I know there're different points of view and that would be right for some and wrong for others. I'm looking for validation about if this is a possible good practice on TFS with Visual Studio Scrum.

    Read the article

  • What can I do to encourage teams to lighten up? [closed]

    - by Rahul
    I work with a geographically distributed team (different timezones) with people from various cultures and background. Some of us have never met each other in person but we communicate with each other over phone, chat and email almost on an hourly basis. Most of our meetings and discussions are dead serious and boring. What's worse, any attempt at humor is not very well received because of cultural differences. I feel that we are all taking our work a bit too seriously. We don't shy away from painful arguments, nasty emails and heated discussions when things go wrong but never attempt to develop camaraderie or friendships in better times. I would like to know your experiences with such situations and what, if anything, did you do to lighten things up at workplace.

    Read the article

  • What did he or she do to enchant you? What was the feeling like? [closed]

    - by Pierre 303
    Guy Kawasaki, the famous author of The Art Of The Start is writing a new book about Enchantment (will be called Art Of Enchantment). He is asking stories about your employees, your things or even websites you visit. What about your colleagues? I need examples of a programmer (you), getting enchanted by another colleague, programmer, analyst, tester (must be within your team). UPDATE: The book is out! http://www.amazon.com/Enchantment-Changing-Hearts-Minds-Actions/dp/1591843790/ref=sr_1_2?ie=UTF8&qid=1298106612&sr=8-2

    Read the article

  • Google veut doper l'adoption professionnelle de ses Google Apps avec un réseau de partenaires-revendeurs de plus en plus important

    Google veut doper l'adoption professionnelle de ses Google Apps Et mise sur un réseau de partenaires-revendeurs de plus en plus important Souscrire aux Google Apps for Business est on ne peut plus simple. Il suffit d'ouvrir un compte et un domaine. Les applications hébergées sont alors immédiatement accessibles et fonctionnelles. Cela, c'est pour la théorie. Dans la pratique, ce genre de choix implique très souvent de la part des entreprises une migration (de Outlook et Exchange vers Gmail par exemple), ou une articulation avec l'existant (entre Microsoft Office et Google Docs pour citer un autre exemple fréquent). Se pose alors pour le décide...

    Read the article

  • Is there a batch processing framework that could be used for C++ applications?

    - by Benjamin
    In my team we develop several command-line C++ applications that work together; they're currently run by hand in separate windows, and after a while managing windows gets really confusing. I'm looking for a better way to manage the processing of these applications; ideally it would have a GUI with the ability to do the following: start applications in a specified order display application status close particular applications Is there anything available that does this type of thing or would we need to develop our own? Is there a better way than this?

    Read the article

  • Has anyone used Rational Team Concert (RTC)?

    - by FryGuy
    The company I work for is currently evaluating replacements for SourceSafe, and for various reasons, I think RTC will be chosen. I'm a little scared that we're going to end up with a solution that isn't the best for us in our situation. I've tried researching a little bit about what it is, but all I have been able to find are marketing things, but nothing about how it actually works (any of the paradigms it uses, etc). Our team is around 8 developers and 2 QA people on a single project (and 4-5 more people that would be using it for their independent project). It seems like RTC is targetted for larger teams, but our team is relatively small. Does anyone has experience using RTC in a smaller team? The project that would be using it is a .NET/WPF application, so we would be using primarily Visual Studio. Is the Visual Studio integration any good, or are we stuck having to have Eclipse open on top of Visual Studio? Personally, I have been using Bazaar as my personal source control (and checking out/into sourcesafe from a branch), as well as on personal projects. Does RTC incorporate features of "third generation" version control systems, such as first class branching/merging and changesets rather than file changes, and good visualization of where changes come from? Also, what are the general pros and cons for it?

    Read the article

  • xpath: determining if the customer has orders

    - by deostroll
    There is an xml dump of the Northwind database here. Document structure is something like: <NorthWind> <Customers></Customers> <Customers></Customers> . . . <Orders></Orders> <Orders></Orders> . . . </NorthWind> Each Customers tag will hold one customer information. Now while I select all Customers how do I furnish a field such that it indicates whether the customer has orders or not; something like a boolean field

    Read the article

  • Upsides of a timebox for a customer

    - by Ivo
    So I have a customer with a potential big project that (ofcourse) does not know what they want exactly. The size of this project can be more that 4 or 5 months so that is a big risk. Thats why I want to sell a timebox. For me that takes away the risk of spending 10 months instead of 5 for the same price. The problem is that I can't comeup with good arguments to convince the customer that a timebox is better for them. Any suggestions? How do you people handle this/

    Read the article

  • deliver c++ application for the final customer

    - by Nebrass
    I am working on a c++ windows application on visual studio 2010. I want to deliver my application to my customer so he can use it easly, without the obligation of installing visual runtime fx. And to be executed every where. How do I set up the installer so that the customer does not need to separately install any required Visual Studio runtime libraries? Please i want a solution for this problem, because my costumers are so far from computing, they love just "next, next, install, finish" system. Thank you for your help.

    Read the article

  • Il CRM è al passo con i tempi?

    - by antonella.buonagurio(at)oracle.com
    Il Social Customer Relationship Management è nato grazie alla rivoluzione portata dal Web 2.0, un cambiamento epocale nelle modalità di comunicazione che ha aggiunto una incredibile ricchezza alle conversazioni tra aziende e consumatori. Le aziende dispongono adesso di strumenti per comprendere il proprio mercato senza precedenti, i consumatori, a loro volta, hanno il potere di utilizzare nuovi canali per esprimere le proprie esigenze e per comunicare e condividere commenti ed esperienze. Ma il Web 2.0 non è il solo fattore che impatta sulle scelte strategiche in ambito CRM  che ogni azienda deve considerare per sostenere  questo nuovo rapporto con i propri consumatori.    Vuoi scoprire quali sono le forze (o fattori) che le aziende devono considerare affinchè i processi di gestione della relazione con i clienti stiano al passo con le mutate condizioni sociali ed economiche?   Per saperne di più:   Il whitepaper realizzato da Oracle, Paul Gillin ed  IT Business Edge  ne delinea alcuni: 1.      Il Business. Come è cambiato in funzione dell'esperienza multicanale ora possible, della centralità del cliente e dei social networking che dominano le relazioni on line? 2.      La tecnologiaLe aziende oggi per guadagnare vantaggio competitivo devono dotarsi delle più innovative tecnologie per dare maggior valore al proprio business e per ridurre al minimo i costi di infrastruttura. Quali sono e quali sono gli effettivi vantaggi?   e altri ancora ...... leggendo il white paper "Is your CRM solution keeping up with the times?"

    Read the article

  • Technical development decision for my newly established software company

    - by test test
    I have a new software company where I am planning to develop CRM system. So I have settled down on the technological approach I am going to use:- I will use an open source Java-based CRM engine. I will use a third party reporting tool named JasperReports for providing reports capabilities for the CRM. I will develop the interface and any customization which the customer might ask for using asp.net mvc framework since my knowledge and experience are based on asp.net. And I will use the CRM API to integrate my asp.net web application with the Java-based CRM. I have developed a simple demo which integrate these three main components (CRM engine, asp.net application and the reporting tool) and they worked well. But I am afraid of the following risk that I might face if I go with the above approach: I should hire developers with different skills and experience: Developers with Java skills to be able to modify the Java-based CRM and writing plug-ins -when needed- to extend the CRM capabilities. Other developers with asp.net skills to be able to build the application such as application forms, the portal from where users will be able to start the CRM processes, searching capabilities, etc. So might the above point raise some risks when I start hiring a new team and start building the CRM application, OR I am on the right track at this early stage?

    Read the article

  • Uralelektrostroy Improves Turnaround Times for Engineering and Construction Projects by Approximately 50% with Better Project Data Management

    - by Melissa Centurio Lopes
    LLC Uralelektrostroy was established in 1998, to meet the growing demand for reliable energy supply, which included the deployment and operation of a modern power grid system for Russia’s booming economy and industrial sector. To rise to the challenge, the country required a company with a strong reputation and the ability to strategically operate energy production and distribution facilities. As a renowned energy expert, Uralelektrostroy successfully embarked on the mission—focusing on the design, construction, and operation of power grids, transmission lines, and generation facilities. Today, Uralelektrostroy leads the Russian utilities industry with operations across the country, particularly in the Ural, Western Siberia, and Moscow regions. Challenges: Track work progress through all engineering project development stages with ease—from planning and start-up operations, to onsite construction and quality assurance—to enhance visibility into complex projects, such as power grid and power-transmission-line construction Implement and execute engineering projects faster—for example, designing and building power generation and distribution facilities—by better monitoring numerous local subcontractors Improve alignment of project schedules with project owners’ requirements—awarding federal and regional authorities—to avoid incurring fines for missing deadlines Solutions: Used Oracle’s Primavera P6 Enterprise Project Portfolio Management 8.1 to streamline communication with customers and subcontractors through better data management and harmonized reporting, reducing construction project implementation and turnaround times by approximately 50%, on average Enabled fast generation of work-in-progress reports that track project schedules, budgets, materials, and staffing—from approval and material procurement, to construction and delivery Reduced the number of construction sites by nearly 30% (from 35 to 25) by identifying unprofitable sites—streamlining operations at the company’s construction site network and increasing profitability Improved project visibility by enabling managers to efficiently track project status, ensuring on-time reporting and punctual project deliveries to federal customers to reduce delay penalties to zero “Oracle’s Primavera P6 Enterprise Project Portfolio Management 8.1 drastically changed the way we run our business. We’ve reduced the number of redundant assets, streamlined project implementation and execution, and improved collaboration with our customers and contractors. Overall, the Oracle deployment helped to increase our profitability.” – Roman Aleksandrovich Naumenko, Head of Information Technology, LLC Uralelektrostroy Read the complete customer snapshot here.

    Read the article

< Previous Page | 37 38 39 40 41 42 43 44 45 46 47 48  | Next Page >